Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

StandardReview Plan for the Review of Safety Analysis Reports for Nuclear Power Plants:LWR Edition — Reactor (NUREG-0800, Chapter 4)

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Section Title Rev. Date Updated
4.2 Fuel System Design Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 09/1978
Rev. 0 11/1975
4.3 Nuclear Design Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 04/1978
Rev. 0 11/1975
4.4 Thermal and Hydraulic Design Rev. 2 03/2007
Draft Rev. 2 06/1996
Rev. 1 07/1981
Rev. 0 11/1975
4.5.1 Control Rod Drive Structural Materials Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 01/1978
Rev. 0 11/1975
4.5.2 Reactor Internal and Core Support Structure Materials Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 01/1978
Rev. 0 11/1975
4.6 Functional Design of Control Rod Drive System Rev. 2 03/2007
Draft Rev. 2 06/1996
Rev. 1 07/1981
Rev. 0 11/1975
  Branch Technical Position (BTP)    
BTP 4-1 Westinghouse Constant Axial Offset Control (CAOC) (Former Section 4.3 BTP has been separated into an individual section.) Rev. 3 03/2007