Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

StandardReview Plan for the Review of Safety Analysis Reports for Nuclear Power Plants:LWR Edition — Electric Power (NUREG-0800,Chapter 8)

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Section Title Rev. Date Updated
8.1 Electric Power - Introduction Draft Rev. 5 05/2014
Rev. 4 02/2012
Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 04/1978
Rev. 0 11/1975
8.2 Offsite Power System Rev. 5 05/2010
Rev. 4 03/2007
Draft Rev. 4 06/1996
Rev. 3 07/1983
Rev. 2 07/1981
Rev. 1 04/1978
Rev. 0 11/1975
8.3.1 A-C Power Systems (Onsite) Rev. 4 05/2010
Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 05/1978
Rev. 0 11/1975
8.3.2 D-C Power Systems (Onsite) Rev. 4 05/2010
Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 04/1978
Rev. 0 11/1975
8.4 Station Blackout Rev. 1 05/2010
Initial Issuance 03/2007
[Future]
Appendix 8-A General Agenda, Station Site Visits (formerly Appendix B) Rev. 1 03/2007
Rev. 0 07/1981
8-A Branch Technical Positions (PSB) Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 06/1978
Rev. 0 11/1975
8-B General Agenda, Station Site Visits Draft Rev. 1 06/1996
Rev. 0 07/1981
  Branch Technical Positions (BTPs)    
BTP 8-1 Requirements on Motor-Operated Valves in the ECCS Accumulator Lines (Former Appendix A BTPs has been separated into individual sections.) Rev. 3 03/2007
BTP 8-2 Use of Diesel-Generator Sets for Peaking (Former Appendix A BTPs has been separated into individual sections.) Rev. 3 03/2007
BTP 8-3 Stability of Offsite Power Systems (Former Appendix A BTPs has been separated into individual sections.) Rev. 3 03/2007
BTP 8-4 Application of the Single Failure Criterion to Manually Controlled Electrically Operated Valves (Former Appendix A BTPs has been separated into individual sections.) Rev. 3 03/2007
BTP 8-5 Supplemental Guidance for Bypass and Inoperable Status Indication for Engineered Safety Features Systems (Former Appendix A BTPs has Rev. 3 03/2007
BTP 8-6 Adequacy of Station Electric Distribution System Voltages (Former Appendix A BTPs has been separated into individual sections.) Rev. 3 03/2007
BTP 8-7 Criteria for Alarms and Indications Associated with Diesel-Generator Unit Bypassed and Inoperable Status (Former Appendix A BTPs has been separated into individual sections.) Rev. 3 03/2007
BTP 8-8 Onsite (Emergency Diesel Generators) and Offsite Power Sources Allowed Outage Time Extensions. Initial 02/2012
BTP 8-9 Open Phase Conditions In Electric Power System Rev. 0 07/2015
Draft Rev. 0 05/2014

Page Last Reviewed/Updated Wednesday, March 24, 2021

Page Last Reviewed/Updated Wednesday, March 24, 2021