StandardReview Plan for the Review of Safety Analysis Reports for Nuclear Power Plants:LWR Edition — Electric Power (NUREG-0800,Chapter 8)
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
| Section | Title | Rev. | Date Updated |
|---|---|---|---|
| 8.1 | Electric Power - Introduction | Draft Rev. 5 | 05/2014 |
| Rev. 4 | 02/2012 | ||
| Rev. 3 | 03/2007 | ||
| Draft Rev. 3 | 06/1996 | ||
| Rev. 2 | 07/1981 | ||
| Rev. 1 | 04/1978 | ||
| Rev. 0 | 11/1975 | ||
| 8.2 | Offsite Power System | Rev. 5 | 05/2010 |
| Rev. 4 | 03/2007 | ||
| Draft Rev. 4 | 06/1996 | ||
| Rev. 3 | 07/1983 | ||
| Rev. 2 | 07/1981 | ||
| Rev. 1 | 04/1978 | ||
| Rev. 0 | 11/1975 | ||
| 8.3.1 | A-C Power Systems (Onsite) | Rev. 4 | 05/2010 |
| Rev. 3 | 03/2007 | ||
| Draft Rev. 3 | 06/1996 | ||
| Rev. 2 | 07/1981 | ||
| Rev. 1 | 05/1978 | ||
| Rev. 0 | 11/1975 | ||
| 8.3.2 | D-C Power Systems (Onsite) | Rev. 4 | 05/2010 |
| Rev. 3 | 03/2007 | ||
| Draft Rev. 3 | 06/1996 | ||
| Rev. 2 | 07/1981 | ||
| Rev. 1 | 04/1978 | ||
| Rev. 0 | 11/1975 | ||
| 8.4 | Station Blackout | Rev. 1 | 05/2010 |
| Initial Issuance | 03/2007 | ||
| [Future] | |||
| Appendix 8-A | General Agenda, Station Site Visits (formerly Appendix B) | Rev. 1 | 03/2007 |
| Rev. 0 | 07/1981 | ||
| 8-A | Branch Technical Positions (PSB) | Draft Rev. 3 | 06/1996 |
| Rev. 2 | 07/1981 | ||
| Rev. 1 | 06/1978 | ||
| Rev. 0 | 11/1975 | ||
| 8-B | General Agenda, Station Site Visits | Draft Rev. 1 | 06/1996 |
| Rev. 0 | 07/1981 | ||
| Branch Technical Positions (BTPs) | |||
| BTP 8-1 | Requirements on Motor-Operated Valves in the ECCS Accumulator Lines (Former Appendix A BTPs has been separated into individual sections.) | Rev. 3 | 03/2007 |
| BTP 8-2 | Use of Diesel-Generator Sets for Peaking (Former Appendix A BTPs has been separated into individual sections.) | Rev. 3 | 03/2007 |
| BTP 8-3 | Stability of Offsite Power Systems (Former Appendix A BTPs has been separated into individual sections.) | Rev. 3 | 03/2007 |
| BTP 8-4 | Application of the Single Failure Criterion to Manually Controlled Electrically Operated Valves (Former Appendix A BTPs has been separated into individual sections.) | Rev. 3 | 03/2007 |
| BTP 8-5 | Supplemental Guidance for Bypass and Inoperable Status Indication for Engineered Safety Features Systems (Former Appendix A BTPs has | Rev. 3 | 03/2007 |
| BTP 8-6 | Adequacy of Station Electric Distribution System Voltages (Former Appendix A BTPs has been separated into individual sections.) | Rev. 3 | 03/2007 |
| BTP 8-7 | Criteria for Alarms and Indications Associated with Diesel-Generator Unit Bypassed and Inoperable Status (Former Appendix A BTPs has been separated into individual sections.) | Rev. 3 | 03/2007 |
| BTP 8-8 | Onsite (Emergency Diesel Generators) and Offsite Power Sources Allowed Outage Time Extensions. | Initial | 02/2012 |
| BTP 8-9 | Open Phase Conditions In Electric Power System | Rev. 0 | 07/2015 |
| Draft Rev. 0 | 05/2014 | ||
Page Last Reviewed/Updated Thursday, August 27, 2026
Page Last Reviewed/Updated Thursday, August 27, 2026