Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

StandardReview Plan for the Review of Safety Analysis Reports for Nuclear Power Plants:LWR Edition — Radioactive Waste Management (NUREG-0800,Chapter 11)

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Section Title Rev. Date Updated
11.1 Coolant Source Terms Final Rev. 4 01/2016
Draft Rev. 4 08/2014
Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
11.2 Liquid Waste Management System Final Rev. 5 01/2016
Draft Rev. 5 08/2014
Rev. 4 05/2010
Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
11.3 Gaseous Waste Management System Final Rev. 4 01/2016
Draft Rev. 4 08/2014
Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
11.4 Solid Waste Management System Final Rev. 4 01/2016
Draft Rev. 4 08/2014
Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
11.5 Process and Effluent Radiological Monitoring Instrumentation and Sampling Systems Final Rev. 6 01/2016
Draft Rev. 6 08/2014
Rev. 5 05/2010
Rev. 4 03/2007
Draft Rev. 4 06/1996
Rev. 3 07/1981
Rev. 2 04/1979
Rev. 1 07/1978
Rev. 0 11/1975
  Branch Technical Positions (BTPs)    
BTP 11-3 Design Guidance for Solid Radioactive Waste Management Systems Installed in Light-Water-Cooled Nuclear Power Reactor Plants (Former Section 11.4 BTP has been separated into an individual section.) Final Rev. 4 01/2016
Draft Rev. 4 08/2014
Rev. 3 03/2007
BTP 11-5 Postulated Radioactive Releases Due to a Waste Gas System Leak or Failure (Former Section 11.3 BTP has been separated into an individual sections) Final Rev. 4 01/2016
Draft Rev. 4 08/2014
Rev. 3 03/2007
BTP 11-6 Postulated Radioactive Releases Due to Liquid-containing Tank Failures Final Rev. 4 01/2016
Draft Rev. 4 08/2014
Rev. 3 03/2007

Page Last Reviewed/Updated Wednesday, March 24, 2021

Page Last Reviewed/Updated Wednesday, March 24, 2021