Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

StandardReview Plan for the Review of Safety Analysis Reports for Nuclear Power Plants:LWR Edition — Severe Accidents (NUREG-0800, Chapter 19)

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Section Title Rev. Date Updated
19.0 Probabilistic Risk Assessment and Severe Accident Evaluation for New Reactors Final Rev. 3 12/2015
Draft Rev. 3 11/2014
Draft Rev. 3 09/2012
Rev. 2 06/2007
Rev. 1 11/2002
Draft Rev. 1 06/2001
19.1 Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities Rev. 3 09/2012
Rev. 2 06/2007
Rev. 1 09/2006
Initial Issuance 02/2004
19.2 Review of Risk Information Used to Support Permanent Plant-Specific Changes to the Licensing Basis: General Guidance Initial Issuance 06/2007
19.3 Regulatory Treatment of Non-Safety Systems (RTNSS) for Passive Advanced Light Water Reactors Rev. 0 06/2014
Draft Rev. 0 07/2013
19.4 Strategies and Guidance to Address Loss-of-Large Areas of the Plant Due to Explosions and Fires Rev. 0 06/2015
Draft Rev. 0 05/2013
19.5 Adequacy of Design features and functional capabilities identified and described for withstanding Aircraft Impacts Rev. 0 04/2013

Page Last Reviewed/Updated Wednesday, March 24, 2021