StandardReview Plan for the Review of Safety Analysis Reports for Nuclear Power Plants:LWR Edition — Electric Power (NUREG-0800,Chapter 8)

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Section Title Rev. Date Updated
8.1 Electric Power - Introduction Draft Rev. 5 05/2014
Rev. 4 02/2012
Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 04/1978
Rev. 0 11/1975
8.2 Offsite Power System Rev. 5 05/2010
Rev. 4 03/2007
Draft Rev. 4 06/1996
Rev. 3 07/1983
Rev. 2 07/1981
Rev. 1 04/1978
Rev. 0 11/1975
8.3.1 A-C Power Systems (Onsite) Rev. 4 05/2010
Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 05/1978
Rev. 0 11/1975
8.3.2 D-C Power Systems (Onsite) Rev. 4 05/2010
Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 04/1978
Rev. 0 11/1975
8.4 Station Blackout Rev. 1 05/2010
Initial Issuance 03/2007
[Future]
Appendix 8-A General Agenda, Station Site Visits (formerly Appendix B) Rev. 1 03/2007
Rev. 0 07/1981
8-A Branch Technical Positions (PSB) Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 06/1978
Rev. 0 11/1975
8-B General Agenda, Station Site Visits Draft Rev. 1 06/1996
Rev. 0 07/1981
  Branch Technical Positions (BTPs)    
BTP 8-1 Requirements on Motor-Operated Valves in the ECCS Accumulator Lines (Former Appendix A BTPs has been separated into individual sections.) Rev. 3 03/2007
BTP 8-2 Use of Diesel-Generator Sets for Peaking (Former Appendix A BTPs has been separated into individual sections.) Rev. 3 03/2007
BTP 8-3 Stability of Offsite Power Systems (Former Appendix A BTPs has been separated into individual sections.) Rev. 3 03/2007
BTP 8-4 Application of the Single Failure Criterion to Manually Controlled Electrically Operated Valves (Former Appendix A BTPs has been separated into individual sections.) Rev. 3 03/2007
BTP 8-5 Supplemental Guidance for Bypass and Inoperable Status Indication for Engineered Safety Features Systems (Former Appendix A BTPs has Rev. 3 03/2007
BTP 8-6 Adequacy of Station Electric Distribution System Voltages (Former Appendix A BTPs has been separated into individual sections.) Rev. 3 03/2007
BTP 8-7 Criteria for Alarms and Indications Associated with Diesel-Generator Unit Bypassed and Inoperable Status (Former Appendix A BTPs has been separated into individual sections.) Rev. 3 03/2007
BTP 8-8 Onsite (Emergency Diesel Generators) and Offsite Power Sources Allowed Outage Time Extensions. Initial 02/2012
BTP 8-9 Open Phase Conditions In Electric Power System Rev. 0 07/2015
Draft Rev. 0 05/2014

Page Last Reviewed/Updated Wednesday, March 24, 2021