The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Staff Requirements Memoranda (SRM) for 2002

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Document number Description Date
SECY-02-0225 Proposed Criteria for the Treatment of Individual Requirements in a Regulatory Analysis 03/21/2003
SECY-02-0221 Final Rule to Standardize the Process for Allowing a Licensee to Release Part of Its Reactor Facility or Site for Unrestricted Use Before NRC Has Approved Its License Termination Plan 03/07/2003
SECY-02-0216 Proposed Process for Providing Information on Significant Nuclear Materials Issues and Adverse Licensee Performance 02/25/2003
SECY-02-0214 Guidance on the Use of Effective Dose Equivalent in External Dose Assessments 01/22/2003
SECY-02-0204 Update of Uranium Recovery Guidance Documents 05/07/2003
SECY-02-0199 Denial of Petition for Rulemaking to Use Information from Prior Licensing Actions as Resolved Information for Early Site Permit and Combined License Applications (PRM-52-1) 05/07/2002
SECY-02-0196 Recommendations Stemming from the Systematic Assessment of Exemptions from Licensing in 10 CFR parts 30 and 40; and a Rulemaking Plan for Risk-informing 10 CFR Parts 30, 31, and 32 11/17/2003
SECY-02-0194 Options for Addressing Part 35 Training and Experience Issues Associated With Recognition of Specialty Boards by NRC 02/12/2003
SECY-02-0191 Status of the Entombment Option for Power Reactors 11/26/2002
SECY-02-0182 Briefing on EEO Program 11/07/2002
SECY-02-0180 Legal and Financial Policy Issues Associated with Licensing New Nuclear Power Plants  
SECY-02-0179 Final Rule: Material Control and Accounting Amendments 12/03/2002
SECY-02-0176 Proposed Rulemaking to Add New Section 10 CFR 50.69, "Risk-Informed Categorization and Treatment of Structures, Systems, and Components" (WITS 199900061) 03/28/2003
SECY-02-0175 Denial of Petition for Rulemaking to Eliminate Review of Alternative Sites, Alternative Energy Sources and Need for Power in Nuclear Power Reactor Siting and Licensing Reviews (PRM-52-2) 05/07/2003
SECY-02-0169 Briefing on Decommissioning Activities and Status 10/16/2002
SECY-02-0166 Policy Options and Recommendations for Revising the NRC's Process for Handling Discrimination Issues 03/26/2003
SECY-02-0138 Denial of Petition for Rulemaking on Mandatory Submittal of Performance Indicator Information Needed for the Reactor Oversight Process (PRM-50-72) 08/13/2002
SECY-02-0135 Proposed Rule: 10 CFR Parts 63: Specification of a Probability for Unlikely Features, Events, and Processes 09/04/2002
SECY-02-0133 Control of Solid Materials: Options and Recommendations for Proceeding 10/25/2002
SECY-02-0132 Proposed Rule: Revision of 10 CFR 50.48 to Permit Light-Water Reactors to Voluntarily Adopt National Fire Protection Association (NFPA) Standard 805, " Performance-Based Standard for Fire Protection for Light-Water Reactor Electric Generating Plants, 2001 Edition" (NFPA 805) as an Alternative Set of Risk-Informed, Performance-Based Fire Protection Requirements (WITS 199900032) 10/03/2002
SECY-02-0127 Proposed Response to State of Ohio on Its Assured Isolation Storage Facility Draft Rules 09/05/2002
SECY-02-0122 Staff Review Guidance for Gaseous Diffusion Plant Changes in Ownership or Control 09/10/2002
SECY-02-0116 Proposed Rule: 10 CFR Parts 30, 40, and 70: Financial Assurance Amendments for Materials Licensees 08/27/2002
SECY-02-0112 NRC Review of Idaho National Engineering and Environmental Laboratory Draft Incidental Waste (Waste Incidental to Reprocessing) Determination for Sodium-bearing Waste 07/26/2002
SECY-02-0111 Proposed Rule to Amend 10 CFR Part 35 to Require Licensees to Notify NRC or an Individual Receiving a Dose Exceeding 50 Millisieverts (5 REM) From a Patient Released Under 10 CFR 35.75 08/27/2002
SECY-02-0107 Addendum to SECY-02-0074: "National Materials Program: Pilot Projects" 08/20/2002
SECY-02-0096 Direct Final Rule on Electronic Maintenance and Submission of Information 07/23/2002
SECY-02-0095 Applicability of Section 11e.(2) of the Atomic Energy Act to Material at the Sequoyah Fuels Corporation Uranium Conversion Facility 07/25/2002
SECY-02-0090 Proposed Regulatory Framework and Cost Estimates for U.S. Nuclear Regulatory Commission Regulation of Nuclear Safety at the U.S. Department of Energy's Non-Defense Science Laboratories 06/28/2002
SECY-02-0089 Revised Draft Nureg-1633 and Public Information Brochure on Potassium Iodide (KI) For the General Public 11/26/2002
SECY-02-0088 Turkey Point Nuclear Plants, Units 3 and 4, Renewal of Full-Power Operating Licenses 06/05/2002
SECY-02-0085 Recent Issues with Respect to Decommissioning Funding Assurance that have Arisen as part of License Transfer Applications and other Licensing Requests 01/03/2003
SECY-02-0084 Final Rule on Decommissioning Trust Provisions 11/21/2002
SECY-02-0081 Staff Activities Related to the NRC Goal of Reducing Unnecessary Regulatory Burden on Power Reactor Licensees 06/25/2002
SECY-02-0080 Proposed Rulemaking—Risk-Informed 10 CFR 50.44 "Combustible Gas Control In Containment" (WITS 20010003) 06/27/2002
SECY-02-0077 Proposed Rule to Update 10 CFR 52, "Early Site Permits, Standard Design Certifications, and Combined Licenses for Nuclear Power Plants" 05/06/2003
SECY-02-0068 Proposed Rule on Financial Information Requirements for Applications to Renew or Extend the Term of an Operating License for a Power Reactor 05/10/2002
SECY-02-0067 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) for Operational Programs (Programmatic
ITAAC)
09/11/2002
SECY-02-0060 Proposed Policy on Enhancing Public Participation in NRC Meeting 05/08/2002
SECY-02-0057 Update to Secy-01-0133, "Fourth Status Report on Study of Risk-informed Changes to the Technical Requirements of 10 CFR Part 50 (Option 3) and Recommendations on Risk-informed Changes to 10 CFR 50.46 (ECCS Acceptance Criteria)" 03/31/2003
SECY-02-0044 Annual Status Report for FY 2001 on the Administration of the NRC's Requalification Program and the Results of Initial Operator Licensing Examinations (WITS 198800098) 04/03/2002
SECY-02-0043 Proposed Rule: Geological and Seismological Characteristics for the Siting and Design of Dry Cask Independent Spent Fuel Storage Installations and Monitored Retrievable Storage Installations - 10 CFR Part 72 06/18/2002
SECY-02-0033 Amergen's Request to Consolidate the Clinton Power Station Emergency Operations Facility (EOF) into the Centralized EOF Operated by Exelon Generation Co. 03/15/2002
SECY-02-0032 Report to Congress on Abnormal Occurrences for Fiscal Year 2001 03/27/2002
SECY-02-0023A Addendum to SECY-02-0023: Proposed Revision to the Enforcement Policy to Include an Interim Policy Regarding Enforcement Discretion for Fitness-For-Duty Issues and Status of Rulemaking Effort 10/04/2002
SECY-02-0023 Proposed Revision to the Enforcement Policy to Include an Interim Policy Regarding Enforcement Discretion for Fitness-For-Duty Issues and Status of Rulemaking Effort 10/04/2002
SECY-02-0021 Final Rule on Revision of the Skin Dose Limit, 10 CFR Part 20 03/20/2002
SECY-02-0002 Revision of Gaseous Diffusion Plant Recertification Standard Review Plan Chapter on Foreign Ownership and Financial Requirements 02/21/2002

Page Last Reviewed/Updated Friday, March 13, 2020