Document number |
Description |
Date |
SECY-09-0190 |
Major Revision to NRC Enforcement Policy |
08/27/2009 |
SECY-09-0189 |
Final Rule: 10 CFR 51.22, "Criterion for Categorical Exclusion; Identification of Licensing and Regulatory Actions Eligible for Categorical Exclusion or Otherwise Not Requiring Environmental Review" (RIN 3150-AI27) |
03/11/2009 |
SECY-09-0183 |
Proposed Modification for Including Quality Control and Quality Verification Personnel within the Scope of Subpart I of 10 CFR Part 26 |
06/01/2010 |
SECY-09-0181 |
Proposed Rule: Physical Protection of Byproduct Material (RIN 3150-AI12) |
05/13/2010 |
SECY-09-0179 |
Proposed Rule: Distribution of Source Material to Exempt Persons and to General Licensees and Revision of General License and Exemptions (RIN 3150-AH15) |
06/16/2010 |
SECY-09-0170 |
Addition of a Diagnostic Radiologist on the Advisory Committee on the Medical Uses of Isotopes |
12/09/2009 |
SECY-09-0162 |
Proposed Rule: 10 CFR 73.37, "Physical Protection of Irradiated Fuel in Transit" (RIN 3150-AI64) |
07/21/2010 |
SECY-09-0140 |
Rulemaking Related to Decoupling an Assumed Loss of Offsite Power from a Loss-of-Coolant Accident, 10 CFR Part 50, Appendix A, General Design Criterion 35 (RIN 3150-AH43) |
07/02/2010 |
SECY-09-0136 |
Denial of Petition for Rulemaking Requesting a Ban on the Use and Export of High Enriched Uranium (PRM-50-90) |
12/30/2009 |
SECY-09-0123 |
Material Categorization and Future Fuel Cycle Facility Security-Related Rulemaking |
07/08/2009 |
SECY-09-0114 |
Section 274b Agreement with the State of New Jersey |
09/02/2009 |
SECY-09-0101 |
Licensing of a Babcock and Wilcox Medical Isotope Production System |
10/09/2009 |
SECY-09-0090 |
Final Update of the Commission's Waste Confidence Decision |
09/15/2010 |
SECY-09-0087 |
Final Rule Establishing Criminal Penalties for the Unauthorized Introduction of Weapons Into Facilities Designated by the Nuclear Regulatory Commission |
09/22/2009 |
SECY-09-0086 |
Final Rule: Expansion of the National Source Tracking System (RIN 3150-A129) |
06/30/2009 |
SECY-09-0075 |
Safety Culture Policy Statement |
10/16/2009 |
SECY-09-0069 |
Proposed Rule: 10 CFR Part 72 License and Certificate of Compliance Terms (RIN 3150-AI09) |
08/26/2009 |
SECY-09-0065 |
Proposed Agreement Between the State of New Jersey and the Commission Pursuant to Section 274 of the Atomic Energy Act of 1954, as Amended |
05/18/2009 |
SECY-09-0064 |
Regulation of Fusion-Based Power Generation Devices |
07/16/2009 |
SECY-09-0059 |
Final Rule Related to Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events (10 CFR 50.61a) (RIN 3150-AI01) |
09/22/2009 |
SECY-09-0051 |
Evaluation of Radiological Consequence Models and Codes |
06/23/2009 |
SECY-09-0042 |
Final Rule: Decommissioning Planning (10 CFR Parts 20, 30, 40, 50, 70, And 72; RIN-3150-AI55) |
11/30/2010 |
SECY-09-0041 |
Recommendation for Future Replenishment of Potassium Iodide |
04/07/2009 |
SECY-09-0035 |
Proposed Rule: Requirements for Distribution of Byproduct Material, Parts 30, 31, 32, 40, and 70 (RIN 3150-AH91) |
02/03/2010 |
SECY-09-0034 |
Proposed Rulemaking - Environmental Protection Regarding the Update of the 1996 Generic Environmental Impact Statement for Nuclear Power Plant License Renewal |
05/04/2009 |
SECY-09-0029 |
Report to Congress on Abnormal Occurrences: Fiscal Year 2008 |
03/30/2009 |
SECY-09-0022 |
Section 274B Agreement with the Commonwealth of Virginia |
02/27/2009 |
SECY-09-0013 |
Review of Proposed Rule Package, “Export and Import of Nuclear Equipment and Material; Updates and Clarifications (10 CFR PART 110, RIN 3150-AI16) |
05/26/2009 |
SECY-09-0011 |
Deferral of Rulemaking: Expansion of National Source Tracking System (RIN 3150-AI29) |
05/28/2009 |
SECY-09-0007 |
Proposed Rule Related to Enhancements to Emergency Preparedness Regulations (10 CFR Part 50) (RIN 3150-AI10) |
04/16/2009 |
SECY-09-0006 |
Critical Research Facilities for Severe Accident Research at Light Water and Advanced Reactors |
05/04/2009 |
SECY-09-0005 |
Options for Accelerating the Completion of the Various Fire Protection Tasks and Applicable Budget Implications |
05/11/2009 |