Skip to main content

The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.

Advisory Committee on Reactor Safeguards (ACRS) 2024 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title Response
11/26/2024 Draft Safety Evaluation of the TerraPower Topical Report, “Plume Exposure Pathway Emergency Planning Zone Methodology,” Revision 3 02/23/2025
10/18/2024 Draft Safety Evaluation For Topical Report PWROG 18068 NP, Revision 1, Use Of Direct Fracture Toughness For Evaluation Of Reactor Pressure Vessel Integrity  
07/17/2024 Safety Evaluation Of The Kairos Non-Power Reactor Hermes 2 Construction Permit Application 09/19/2024
06/28/2024 Principal Design Criteria For The Natrium Advanced Reactor  
06/27/2024 Draft Safety Evaluation Of Terrapower’s Natrium Topical  Report On Fuel And Control Assembly Qualification  
05/24/2024 Incremental Extension of Burnup Limit for Westinghouse and Combustion  Engineering Fuel Designs  
05/24/2024 Review of Computer Code Development and Validation for Non-Light-Water Reactors  
05/16/2024 Report on the Safety Aspects of the Subsequent License Renewal Application Review of Monticello Nuclear Generating Plant, Unit 1  
05/14/2024 Report on the Safety Aspects of the License Renewal Application Review of Comanche Peak Nuclear Power Plant Units 1 & 2  
03/22/2024 Revision 9 of Standard Review Plan Branch Technical Position 7-19, "Guidance for Evaluation of Defense in Depth and Diversity to Address Common-Cause Failure Due to Latent Defects in Digital Safety Systems" 09/25/2024
02/26/2024 10 CFR Part 61 – Revisions to Low-Level Radioactive Waste Disposal Requirements  

Page Last Reviewed/Updated Thursday, August 27, 2026

Page Last Reviewed/Updated Thursday, August 27, 2026