| Date | Title | Response |
|---|---|---|
| 12/21/2022 | Proposed Draft Regulatory Guide 1.152, Revision 4, “Criteria for Programmable Digital Devices in Safety-Related Systems of Nuclear Power Plants” | 02/16/2023 |
| 12/20/2022 | Safety Evaluation of the Kairos Topical Report KP-TR-011, Revision 2, “Fuel Qualification Methodology for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor (KP-FHR) | 02/08/2023 |
| 12/15/2022 | Report on the Safety Aspects of the SHINE Medical Technologies, LLC, Operating License Application Review | |
| 12/08/2022 | Response to NRC Staff Letter on ACRS Letter Report, “Draft SECY White Paper on Licensing and Regulating Fusion Energy Systems” | |
| 12/08/2022 | White Paper on “The Enduring Legacy of ACRS: Contributing to Safety-Licensing Review of Reactor Facilities | |
| 11/22/2022 | Regulatory Guide 1.82, "Water Sources for Long-Term Recirculation Cooling Following a Loss-of-Coolant Accident (LOCA)," Revision 5 | |
| 11/22/2022 | Final Letter on Draft 10 CFR Part 53 Rulemaking Language | 02/10/2023 |
| 11/21/2022 | SECY-22-0076, "Expansion on Current Policy on Potential Common-Cause Failures in Digital Instrumentation and Control Systems" | |
| 10/21/2022 | Draft SECY White Paper on Licensing and Regulating Fusion Energy Systems | 11/07/2022 |
| 10/19/2022 | Safety Evaluation for NuScale Topical Report, TR-0915-17772, “Methodology for Establishing the Technical Basis for Plume Exposure Emergency Planning Zones at NuScale Small Modular Reactor Plant Sites,” Revision 3 | |
| 09/27/2022 | Draft Regulatory Guide 1.250, Revision 0, Dedication of Commercial-Grade Digital Instrumentation and Control Items for Use in Nuclear Power Plants | 10/21/2022 |
| 08/02/2022 | Fourth Interim Letter on 10 CFR Part 53 Rulemaking Language - FC - July 6-7, 2022 | 09/30/2022 |
| 05/18/2022 | Report on the Safety Aspects of the Subsequent License Renewal Application Review of Point Beach Nuclear Power Plant, Units 1 and 2 | |
| 04/28/2022 | Rulemaking Plan for Revision of Embrittlement and Surveillance Requirements for High-Fluence Nuclear Power Plants in Long-Term Operation | |
| 04/21/2022 | Safety Evaluation for Topical Report NEDC-33922P, “BWRX-300 Containment Evaluation Method,” Revision 2 | |
| 04/21/2022 | Safety Evaluation for Topical Report NEDO-33914, Revision 1, “BWRX-300 Advanced Civil Construction and Design Approach” | |
| 04/04/2022 | Integration of Source Term Activities in Support of Advanced Reactor Initiatives | |
| 03/23/2022 | Preliminary Proposed Rule Language and Guidance to Align Licensing Processes and Lessons Learned from Recent Reactor Licensing Activities | |
| 02/28/2022 | Report on the Safety Aspects of the Subsequent License Renewal Application Review of the North Anna Power Station, Units 1 and 2 | |
| 02/25/2022 | Safety Evaluation for Holtec Licensing Topical Report HI-200750, Revision O, “Holtec Spent Fuel Pool Heat Up Calculations Methodology | |
| 02/18/2022 | NuScale Topical Report, TR-0920-71621-P, Revision 1, "Building Design and Analysis Methodology for Safety-Related Structures" | |
| 02/17/2022 | Preliminary rule Language for 10 CFR Part 53, Subpart F," Requirements for Operations," Interim Report | 03/30/2022 |