The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Advisory Committee on Reactor Safeguards (ACRS) 2017 Letter Reports
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
| Date | Title | Response |
|---|---|---|
| 11/16/2017 | State-of-the-Art Reactor Consequence Analysis (SOARCA) Project: Sequoyah Integrated Deterministic and Uncertainty Analyses | 12/22/2017 |
| 11/06/2017 | Report on the Safety Aspects of the Construction Permit for Northwest Medical Isotopes, LLC, Radioisotope Production Facility | 12/08/2017 |
| 10/20/2017 | Revision 3 to Regulatory Guide 1.174 | 11/20/2017 |
| 10/20/2017 | Safety Evaluation of the Nuscale Power, LLC Topical Report TR-0116-20825-P, "Applicability of AREVA Fuel Methodology for the Nuscale Design," Revision 1 | 11/21/2017 |
| 10/19/2017 | Safety Evaluation for Topical Report ANP-10300p, Revision 0, "Aurora-B: an Evaluation Model for Boiling Water Reactors; Application to Transient And Accident Scenarios" | 02/26/2018 |
| 10/11/2017 | Regulatory Guide | No Response Required |
| 09/25/2017 | Interim Letter: Chapters 7 and 18 of the NRC Staff's Safety Evaluation Report with Open Items Related to the Certification of the APR1400 Design | 11/02/2017 |
| 07/27/2017 | Safety Evaluation for WCAP-17642-P, Revision 1, "Westinghouse Performance Analysis and Design Model (PAD5)" | 09/19/2017 |
| 07/26/2017 | Report on the Safety Aspects of the License Renewal Application for South Texas Project, Units 1 and 2 | 08/21/2017 |
| 07/26/2017 | Safety Evaluation of the NuScale Power, LLC Topical Report TR-0815-16497-P, "Safety Classification of Passive Nuclear Power Plant Electrical Systems," Rev. 1 | 09/11/2017 |
| 07/26/2017 | Interim Letter: Chapters 3, 4, 9 and 15 of The NRC Staff's Safety Evaluation Report With Open Items Related To The Certification Of The APR1400 Design | 09/07/2017 |
| 06/21/2017 | Draft Proposed Rulemaking 10 CFR 73.53, "Requirements for Cyber Security at Nuclear Fuel Cycle Facilities," Related Parts 70, 73, and 40, and Draft Regulatory Guide DG-5062, "Cyber Security Programs for Nuclear Fuel Cycle Facilities" | 08/31/2017 |
| 06/21/2017 | Proposed Revision to NUREG-1530, "Reassessment of NRC's Dollar Per Person-Rem Conversion Factor Policy" | 07/21/2017 |
| 06/21/2017 | Interim Letter: Chapters 6, 12, 13, 14, 16, 17, and 19 of the NRC Staff’s Safety Evaluation Report with Open Items Related to the Certification of the APR1400 Design | 08/10/2017 |
| 06/19/2017 | Browns Ferry Power Station Units 1, 2, and 3 Extended Power Uprate License Amendment Request | 07/21/2017 |
| 06/19/2017 | Draft Safety Evaluation of PWROG-14001-P, Revision 1, "PRA Model for the Generation III Westinghouse Shutdown Seal" | 07/24/2017 |
| 05/19/2017 | Consequential Steam Generator Tube Rupture | 06/27/2017 |
| 05/18/2017 | Safety Evaluation of License Amendment Request by South Texas Project Nuclear Operating Company to Adopt a Risk-Informed Resolution of Generic Safety Issue-191 | 06/16/2017 |
| 04/24/2017 | Safety Evaluation of the NuScale Power, LLC Licensing Topical Report TR-1015-18653-P, Revision 1, Design of the Highly Integrated Protection System Platform | 05/31/2017 |
| 04/18/2017 | Draft NUREG/BR-0058, Revision 5, U.S. Nuclear Regulatory Commission Guidance on Performing Regulatory and Cost-Benefit Analyses | 05/03/2017 |
| 04/18/2017 | Report on Subsequent License Renewal | 05/19/2017 |
| 03/21/2017 | NRC Non-Light Water Reactor Vision & Strategy – Near-Term Implementation Action Plans and Advanced Reactor Design Criteria | 05/10/2017 |
| 03/20/2017 | Interim Comments on Draft NUREG/BR-0058, Revision 5, "U.S. Nuclear Regulatory Commission Guidance on Performing Cost-Benefit Analyses" | 05/03/2017 |
| 03/20/2017 | Proposed Revision to NUREG-1530, "Reassessment of NRC's Dollar Per Person-REM Conversion Factor Policy" | 05/01/2017 |
| 02/28/2017 | Safety Evaluation of APR1400 Topical Report, "KCE-1 Critical Heat Flux Correlation for PLUS7 Thermal Design" | 03/30/2017 |
| 02/22/2017 | Revision of Regulatory Guidance for Evaluating the Effects of Light-Water Reactor Water Environments in Fatigue Analyses of Metal Components | 03/24/2017 |
| 02/21/2017 | Interim Letter: Chapters 2, 5, 8, 10, and 11 of the NRC Staff's Safety Evaluation Report with Open Items Related to the Certification of the APR1400 Design | 03/31/2017 |
| 02/21/2017 | Safety Evaluation of Topical Report, "Fluidic Device Design for the APR1400 | 03/31/2017 |
| 02/14/2017 | Response to the December 15, 2016 Staff Letter Regarding "Draft Final Rule on Mitigation of Beyond-Design-Basis Events and Associated Regulatory Guidance" | 03/17/2017 |
| 01/11/2017 | ACRS Assessment of the Quality of Selected NRC Research Projects - 2016 | No Response Required |
| 12/13/2016 | Closure of Fukushima Recommendations Related to Evaluation of Natural Hazards Other Than Seismic and Flooding, Periodic Confirmation of Natural Hazards, and Real-Time Radiation Monitoring | 01/17/2017 |
Page Last Reviewed/Updated Thursday, August 27, 2026
Page Last Reviewed/Updated Thursday, August 27, 2026