The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Advisory Committee on Reactor Safeguards (ACRS) 2016 Letter Reports
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
| Date | Title | Response |
|---|---|---|
| 12/06/2016 | Draft Final Rule 10 CFR 50.155, Mitigation Of Beyond-Design-Basis Events and Associated Regulatory Guidance | 12/16/16 |
| 11/15/2016 | Report on the Safety Aspects of Dominion Virginia Power Combined License Application for North Anna Unit 3 | 11/15/16 |
| 11/15/2016 | Monticello Nuclear Generating Plant Licensing Amendment Request for Operation in the Extended Flow Window Domain | 11/15/16 |
| 11/14/2016 | Review of SECY-16-0106, Proposed Final Rule 10 CFR Part 61, Low-Level Radioactive Waste Disposal | 12/19/16 |
| 10/17/2016 | Review of RG 1.26, Revision 5, Quality Group Classifications And Standards For Water-, Steam-, And Radioactive-Waste Containing Components of Nuclear Power Plants | 12/13/16 |
| 10/14/2016 | Report on the Safety Aspects of the License Renewal Application of the Grand Gulf Nuclear Station, Unit 1 | 11/08/16 |
| 09/22/2016 | Pacific Gas and Electric Diablo Canyon Units One and Two Digital Process Protection System Upgrade License Amendment Request | 10/11/16 |
| 09/19/2016 | Response to the July 5, 2016 Staff Letter Regarding Interim Staff Guidance JLD-ISG-2016-01 for Focused Evaluations and Integrated Assessments of Reevaluated Flooding Hazards | 10/21/16 |
| 09/16/2016 | Report on the Safety Aspects of the License Renewal Application of the Fermi 2 Nuclear Power Plant | 10/19/16 |
| 09/16/2016 | Report on the Safety Aspects of the Florida Power & Light Company's Combined License Application for Turkey Point Units 6 and 7 | |
| 07/19/2016 | Topical Report WCAP-16996-P, Volumes I, II and III, Revision 1, "Realistic Loss-of-Coolant Accident Evaluation Methodology Applied to the Full Spectrum of Break Sizes" | 08/30/16 |
| 07/18/2016 | Report on the Safety Aspects of the License Renewal Application of the Lasalle County Station, Units 1 and 2 | 09/14/16 |
| 07/18/2016 | Draft Final Regulatory Guide 1.230, "Regulatory Guidance on the Alternate Pressurized Thermal Shock Rule," and Draft Final Report NUREG-2163, "Technical Basis for Regulatory Guidance on the Alternate Pressurized Thermal Shock Rule" | 08/30/16 |
| 05/18/2016 | NuScale Power, LLC Licensing Topical Report, "Risk Significance Determination" | 07/11/16 |
| 05/18/2016 | Draft Interim Staff Guidance JLD-ISG-2016-01, "Guidance for Activities Related to Near-Term Task Force Recommendation 2.1, Flooding Hazard Reevaluation; Focused Evaluation and Integrated Assessment" | 07/05/16 |
| 05/17/2016 | NRC Staff Updated Assessment of Fukushima Tier 2 Recommendations Related to Evaluation of Natural Hazards Other Than Seismic and Flooding | 06/17/16 |
| 04/28/2016 | Review and Evaluation of the NRC Safety Research Program | 09/08/16 |
| 04/20/2016 | NUREG-1927, Revision 1, "Standard Review Plan for Renewal Of Specific Licenses and Certificates of Compliance for Dry Storage of Spent Nuclear Fuel" | 05/27/16 |
| 04/19/2016 | Regulatory Guide 1.229, "Risk-Informed Approach for Addressing the Effects of Debris on Post-Accident Long-Term Core Cooling" | 06/03/16 |
| 04/18/2016 | Exemptions to the AP1000 Certified Design Included in the Levy Nuclear Plant Units 1 and 2 Combined License Application | 05/22/16 |
| 03/15/2016 | Non-Power Production or Utilization Facilities Proposed License Renewal Rulemaking | 04/07/16 |
| 03/15/2016 | Closure of Fukushima Tier 3 Recommendations Related to Containment Vents, Hydrogen Control, and Enhanced Instrumentation | 04/21/16 |
| 02/23/2016 | Draft Final Rule 10 CFR 50.46C, "Emergency Core Cooling System Performance During Loss-Of-Coolant Accidents (LOCA)" And Associated Regulatory Guides | 03/16/16 |
| 02/17/2016 | Peach Bottom Atomic Power Station Units 2 And 3 Maximum Extended Load Line Limit Analysis Plus (MELLLA+) License Amendment Request | 03/14/16 |
Page Last Reviewed/Updated Thursday, August 27, 2026
Page Last Reviewed/Updated Thursday, August 27, 2026