The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Advisory Committee on Reactor Safeguards (ACRS) 2012 Letter Reports
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
| Date | Title | Response |
|---|---|---|
| 12/20/2012 | Response to the EDO October 26, 2012, Letter Regarding Chapter 9 of the Safety Evaluation Report with Open Items for the US-APWR Design Certification Application | |
| 12/19/2012 | Response to the October 26, 2012, EDO Letter Regarding Technical Information Needs Affecting Potential Regulation of Extended Storage and Transportation of Spent Nuclear Fuel | |
| 12/18/2012 | Draft Design Specific Review Standard for mPower iPWR Chapter 7 Instrumentation and Control Systems | 02/06/2013 |
| 12/17/2012 | Draft Final Regulatory Guide 4.22, "Decommission Planning During Operations" | No Response Required |
| 11/13/2012 | SECY-12-0110, “Consideration of Economic Consequences within the U.S. Nuclear Regulatory Commission’s Regulatory Framework” | |
| 11/08/2012 | ACRS Review of Staff’s Draft SECY Paper on Consideration of Additional Requirements for Containment Venting Systems for Boiling Water Reactors with Mark I and Mark II Containment Designs | 12/11/2012 |
| 11/07/2012 | Response to the August 15, 2012 EDO Letter Regarding ACRS Recommendations in Letter dated July 17, 2012 on the Draft Interim Staff Guidance Documents in Support of Tier 1 Orders | 12/13/2012 |
| 11/07/2012 | Long-Term Core Cooling for the South Texas Project Advanced Boiling Water Reactor Combined License Application | 12/07/2012 |
| 10/22/2012 | ACRS Assessment of the Quality of Selected NRC Research Projects – FY 2012 | |
| 10/18/2012 | Draft Safety Evaluation of WCAP-16793-NP, Revision 2, “Evaluation of Long-Term Cooling Considering Particulate, Fibrous and Chemical Debris in the Recirculating Fluid” | 11/19/2012 |
| 10/16/2012 | Withdrawal of Regulatory Guide 1.182 | No Response Required |
| 10/16/2012 | Proposed Regulatory Guide DG-1294 | No Response Required |
| 10/16/2012 | SECY-12-0064, Recommendations for Policy and Technical Direction to Revise Radiation Protection Regulations and Guidance | |
| 09/25/2012 | Draft Regulatory Guide DG-1290 (Proposed Revision of Regulatory Guide 1.59), “Design-Basis Floods for Nuclear Power Plants” | |
| 09/18/2012 | Interim Staff Guidance 8, Revision 3, “Burnup Credit in the Criticality Safety Analyses of PWR Spent Fuel in Transportation and Storage Casks” | |
| 09/18/2012 | Chapters 5, 8, 10, 11 and 12 of the Safety Evaluation Report with Open Items for the Comanche Peak Nuclear Power Plant, Units 3 and 4, US-APWR Reference Combined License Application | |
| 09/18/2012 | Chapter 9 of the Safety Evaluation Report with Open Items for the US-APWR Design Certification Application | |
| 09/17/2012 | Draft Final NUREG-1022, Revision 3, “Event Reporting Guidelines 10 CFR 50.72 and 50.73” | No Response Required |
| 09/17/2012 | Draft Final Regulatory Guides | No Response Required |
| 09/11/2012 | Technical Information Needs Affecting Potential Regulation of Extended Storage and Transportation of Spent Nuclear Fuel | |
| 07/23/2012 | Final Safety Evaluation Report Associated with the Florida Power and Light St. Lucie, Unit 2, License Amendment Request for an Extended Power Uprate | 08/10/2012 |
| 07/19/2012 | Draft Final NUREG-1934 (EPRI 1023259), “Nuclear Power Plant Fire Modeling Analysis Guidelines (NPP FIRE MAG)” | |
| 07/17/2012 | SECY-12-0081, “Risk-Informed Regulatory Framework for New Reactors” | No Response Required |
| 07/17/2012 | Draft Interim Staff Guidance Documents in Support of Tier 1 Orders | |
| 07/16/2012 | Proposed Regulatory Guides DG-1282, DG-3042, and DG-1269 | No Response Required |
| 06/20/2012 | Final Safety Evaluation Report Associated with the Florida Power and Light St. Lucie, Unit 1, License Amendment Request for an Extended Power Uprate | |
| 06/19/2012 | NRC Staff’s Draft Plans and Status Summaries for Tier 3 Japan Lessons Learned Recommendations | |
| 06/18/2012 | Grand Gulf Nuclear Station, Unit 1, Extended Power Uprate License Amendment Request | |
| 06/18/2012 | Proposed Revision 1 to Regulatory Guide 1.192, "Operation and Maintenance Code Case Acceptability, ASME OM Code" | |
| 05/18/2012 | Chapters 3, 9, 14, and 19 of the Safety Evaluation Report with Open Items Associated with the U.S. Evolutionary Power Rector Design Certification Application | |
| 05/17/2012 | Draft Final NUREG-1921, (EPRI Report 1023001),“EPRI/NRC-RES Fire Human Reliability Analysis Guidelines |
06/19/2012 |
| 05/15/2012 | State-of-the-Art Reactor Consequence Analyses (SOARCA) Project | 07/31/2013 Enclosure |
| 05/14/2012 | Withdrawal of Regulatory Guides 5.67 and 7.3 | No Response Required |
| 04/26/2012 | Draft Commission Paper, "Risk-Informed Regulatory Framework for New Reactors" | 05/30/2012 |
| 04/25/2012 | Spent Fuel Pool Study | 05/23/2012 |
| 04/25/2012 | Response to the January 24, 2012, EDO Letter Regarding the Progress Energy Florida Combined License Application for Levy Nuclear Plant, Units 1 and 2 | |
| 04/25/2012 | Chapters 6, 7, 15, and 18 of the Safety Evaluation Report with Open Items Associated with the Calvert Cliffs Nuclear Power Plant, Unit 3, Combined License Application | |
| 04/24/2012 | Report on the Safety Aspects of the License Renewal Application for the Columbia Generating Station | 07/06/2012 |
| 04/23/2012 | Extremely Low Probability of Rupture Project | 05/30/2012 |
| 04/16/2012 | Draft Final Regulatory Guide 4.20 | No Response Required |
| 04/16/2012 | Proposed Regulatory Guides DG-5028 and DG-1279 | No Response Required |
| 04/16/2012 | Disposition of the ACRS's Review of Draft 10 CFR 50.54(f) Letter on Implementation of the Near-Term Task Force Recommendations from the Fukushima Dai-Ichi Event | |
| 04/03/2012 | Review and Evaluation of the Nuclear Regulatory Commission Safety Research Program | |
| 03/20/2012 | Report on the Final Safety Evaluation Report Associated With the Florida Power and Light Turkey Point Nuclear Plant Units 3 and 4 License Amendment Request for an Extended Power Uprate | 04/09/2012 |
| 03/15/2012 | Draft Final Regulatory Guide 1.82 | No Response Required |
| 03/15/2012 | Chapters 6, 7, 11, 13, 15, 16, and 18 of the Safety Evaluation Report with Open Items Associated with the U.S. Evolutionary Power Reactor Design Certification Application | |
| 03/14/2012 | ACRS Review of Proposed Orders in Response to Fukushima Lessons Learned (SECY-12-0025) | 07/06/2012 |
| 03/13/2012 | Response to February 27, 2012 Letter Regarding Final Disposition of Fukushima-Related ACRS Recommendations in Letters dated October 13, 2011 and November 8, 2011 | |
| 02/16/2012 | Draft Final Revision 1 to Regulatory Guide 1.93,"Availability of Electric Power Sources" | 03/15/2012 |
| 02/15/2012 | Draft 10 CFR 50.54(f) Letter on Implementation of the Near-Term Task Force Recommendations from the Fukushima Daiichi Event | 03/21/2012 |
| 02/13/2012 | Draft Final Regulatory Guides 1.160 and 4.11 | No Response Required |
| 02/13/2012 | International Isotopes Fluorine Extraction and Depleted Uranium De-Conversion Plant Safety Evaluation | No Response Required |
| 01/26/2012 | Proposed Draft Rule for 10 CFR 50.46c, "Emergency Core Cooling System Performance During Loss-of-Coolant Accidents" | 02/17/2012 |
| 01/24/2012 | Draft Final Regulatory Guides 7.4, 3.74, and 7.7 | No Response Required |
Page Last Reviewed/Updated Thursday, August 27, 2026
Page Last Reviewed/Updated Thursday, August 27, 2026