The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Advisory Committee on Reactor Safeguards (ACRS) 2023 Letter Reports
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
| Date | Title | Response |
|---|---|---|
| 12/20/2023 | Review Of Advanced Reactor Content of Application Project/Technology-Inclusive Content of Application Project Guidance | 03/18/2024 |
| 11/24/2023 | Interim Letter on Level 3 Probabilistic Risk Assessment (L3PRA) – Volumes 2 and 4, Pertaining to Reactor at-Power Events | |
| 10/25/2023 | Draft White Paper, "Micro-Reactor Licensing and Deployment Considerations: Fuel Loading and Operational Testing at a Factory" | 02/01/2024 |
| 09/26/2023 | Report on the Safety Aspects of the Subsequent License Renewal Application Review of St. Lucie Plant, Units 1 and 2 | |
| 09/20/2023 | Review of Regulatory Guide 1.183, Revision 1 - Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors | 10/05/2023 |
| 07/31/2023 | EPRI Topical Report 3002018337 – Use of Data Validation and Reconciliation Methods for Measurement Uncertainty Recapture | |
| 07/31/2023 | Framatome Topical Report ANP-10339P, ARITA™ - ARTEMIS™/RELAP™ Integrated Transient Analysis Methodology | |
| 07/27/2023 | Vogtle Electric Generating Plant, Units 1 and 2, Use of Accident Tolerant Fuel Lead Test Assemblies | |
| 07/21/2023 | Transmittal Of Report, International Meeting Of Nuclear Regulatory Advisory Committees - March 2023 | |
| 06/20/2023 | General Atomics Topical Report, “Fast Modular Reactor Principal Design Criteria,” Revision 2 | |
| 05/16/2023 | Kairos Non-Power Reactor Hermes Construction Permit Application | 06/20/2023 |
| 03/20/2023 | Safety Evaluation for Framatome Inc., Topical Report ANP-10353P, Revision 0, “Increased Enrichment for PWRs” | |
| 02/25/2023 | Report on the Safety Aspects of the Subsequent License Renewal Application Review of Oconee Nuclear Station, Units 1, 2, and 3 | |
| 02/15/2023 | Draft Safety Evaluation of the Kairos Topical Report – KP-TR-013, “Metallic Materials Qualification for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor | |
| 02/13/2023 | Draft Safety Evaluation of the Kairos Topical Report – KP-TR-014, Revision 4 – Graphite Material Qualification for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor |
Page Last Reviewed/Updated Thursday, August 27, 2026
Page Last Reviewed/Updated Thursday, August 27, 2026