The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Advisory Committee on Reactor Safeguards (ACRS) 2018 Letter Reports
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
| Date | Title | Response |
|---|---|---|
| 12/19/2018 | Report On The Safety Aspects Of The License Renewal Application For The Seabrook Station, Unit 1 | |
| 12/14/2018 | Seabrook Station Unit 1 - License Renewal Application: Review of Licensee Program Addressing Alkali-Silica Reaction | 01/11/2019 |
| 11/21/2018 | Report on the Safety Aspects of the License Renewal Application for the Waterford Steam Electric Station, Unit 3 | 12/20/2018 |
| 11/15/2018 | Report on the Safety Aspects of the License Renewal Application for River Bend Station, Unit 1 | 12/20/2018 |
| 11/08/2018 | Draft Digital Instrumentation & Controls Interim Staff Guidance, Digital I&C-ISG-06, "Licensing Process," Revision 2 | 12/21/2018 |
| 10/24/2018 | Regulatory Guides | No Response Required |
| 10/19/2018 | Draft Proposed Rule, "Emergency Preparedness for Small Modular Reactors and Other New Technologies" | 11/09/2018 |
| 09/26/2018 | Safety Evaluation of the NuScale Power, LLC Topical Report TR-0915-17564-P, Revision 1, "Subchannel Analysis Methodology" | 10/15/2018 |
| 09/26/2018 | Chapters 7 and 8 of the NRC Staff's SER with Open Items Related to the Certification of the NuScale Small Modular Reactor | 10/30/2018 |
| 09/13/2018 | Regulatory Guides | No Response Required |
| 07/26/2018 | Report on the Safety Aspects of the APR1400 Pressurized Water Reactor | 07/30/2018 |
| 07/19/2018 | Brunswick Steam Electric Plant, Units 1 and 2, Maximum Extended Load Line Limit Analysis Plus License Amendment Request | 08/14/2018 |
| 07/18/2018 | Draft Digital Instrumentation & Controls Interim Staff Guidance, Digital I&C-ISG-06, Licensing Process, Revision 2 | 09/11/2018 |
| 06/15/2018 | Long-Term Core Cooling for the Apr1400 | 07/13/2018 |
| 06/15/2018 | Safety Evaluation Of The Nuscale Power, LLC Topical Report Tr-0616-48793, Revision 0, "Nuclear Analysis Codes And Methods Qualification" And Safety Evaluation Of The Nuscale Power, LLC Topical Report Tr-0116-21012, Revision 1, "Nuscale Power Critical Heat Flux Correlations" | 06/29/2018 |
| 06/15/2018 | Safety Evaluation for Topical Report APR1400-F-A-TR-12004-P, Revision 1, "Realistic Evaluation Methodology for Large-Break Loss of Coolant Accident of the APR1400." | 07/13/2018 |
| 05/10/2018 | Functional Containment Performance Criteria for Non-Light Water Reactor Designs | 06/27/2018 |
| 04/12/2018 | Safety Evaluation for WCAP-17938-P, Revision 2, "AP 1000 In-Containment Cables and Non-Metallic Insulation Debris Integrated Assessment" | 06/07/2018 |
| 03/26/2018 | Safety Evaluation for Topical Report APR1400-F-M-TR-13001, Revision 1, "Plus 7 Fuel Design for the APR1400" | 06/11/2018 |
| 03/26/2018 | Safety Evaluation for ANP-10333P, Revision 0, & Aurora-B: an Evaluation Model for Boiling Water Reactors; Application to Control Rod Drop Accident (CRDA) | 04/27/2018 |
| 03/26/2018 | Regulatory Guide 1.232, Guidance for Developing Principal Design Criteria for Non-Light-Water Reactors | 05/09/2018 |
| 02/26/2018 | Biennial Review and Evaluation of the NRC Safety Research Program | 06/20/2018 – Letter 06/20/2018 – Enclosure |
| 02/21/2018 | Nuscale Power Exemption Request From 10 CFR Part 50, Appendix A, General Design Criterion 27, "Combined Reactivity Control Systems Capability" | 03/19/2018 |
| 01/23/2018 | ACRS Assessment of the Quality of Selected NRC Research Projects – FY 2017 |
Page Last Reviewed/Updated Tuesday, September 08, 2026
Page Last Reviewed/Updated Tuesday, September 08, 2026