The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Advisory Committee on Reactor Safeguards (ACRS) 2011 Letter Reports
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
| Date | Title | EDO Response |
|---|---|---|
| 12/13/2011 | Revised Branch Technical Position on Concentration Averaging and Encapsulation of Low-Level Radioactive Waste | 02/03/2012 |
| 12/12/2011 | Response to the October 28, 2011, EDO Letter Regarding the ACRS Recommendations on Topical Report NEDC-33173P, Supplement 2, Parts 1, 2, and 3, "Analysis of Gamma Scan Data and Removal of Safety Limit Critical Power Ratio (SLMCPR) Margin" | 01/16/2012 |
| 12/08/2011 | Proposed Requirements for ITAAC Maintenance and Draft Final Regulatory Guide 1.215, "Guidance for ITAAC Closure Under 10 CFR Part 62" | 01/16/2012 |
| 12/07/2011 | Report on the Safety Aspects of the Progress Energy Florida, Inc. Combined License Application for Levy Nuclear Plant, Units 1 and 2 | 01/24/2012 |
| 12/06/2011 | ESBWR Design Certification Rulemaking and Supplemental Final Safety Evaluation Report | No Response Required |
| 12/06/2011 | Proposed Revisions to Regulatory Guides 1.140 and 1.185 | No Response Required |
| 11/14/2011 | Draft Final Revision 6 of Standard Review Plan Branch Technical Position 7-19, "Guidance for Evaluation of Diversity and Defense-in-Depth in Digital Computer-Based Instrumentation and Control Systems" | 01/27/2012 |
| 11/14/2011 | Topical Report NEDC-33173P-A, Supplement 2, Parts 1, 2, and 3, "Analysis of Gamma Scan Data and Removal of Safety Limit Minimum Critical Power Ratio (SLMCPR) Margin" | Non-publically Available |
| 11/14/2011 | Draft Final Regulatory Guide 1.106 | No Response Required |
| 11/14/2011 | Proposed Revision 4 to Regulatory Guide 1.52 (DG-1274) | No Response Required |
| 11/10/2011 | Nine Mile Point Nuclear Station, Unit 2, Extended Power Uprate Application | 12/12/2011 |
| 11/08/2011 | ACRS Review of Staff's Prioritization of Recommended Actions to be Taken in Response to Fukushima Lessons Learned (SECY-11-0137) | 12/08/2011 |
| 10/17/2011 | Enhancing the Fuel Cycle Oversight Process | 11/08/2011 |
| 10/17/2011 | Draft Final Regulatory Guide (RG) 1.82, "Water Sources for Long-Term Recirculation Cooling Following a Loss-of-Coolant Accident," Revision 4 | 11/21/2011 |
| 10/13/2011 | Initial ACRS Review of: (1) the NRC Near-Term Task Force Report on Fukushima and (2) Staff's Recommended Actions to be Taken Without Delay | 12/08/2011 |
| 10/12/2011 | Proposed Closeout – Generic Issue 186, "Potential Risk and Consequences of Heavy Load Drops in Nuclear Power Plants" | No Response Required |
| 09/22/2011 | Final Rule – AP1000 Design Certification Amendment | No Response Required |
| 09/22/2011 | Chapters 2, 5, 8, 10,11,12, 13, and 16 of the Safety Evaluation Report with Open Items for Certification of the US-APWR Design | 10/25/2011 |
| 09/22/2011 | Proposed Rulemaking to Introduce a Site-Specific Performance Assessment and Human Intrusion Analysis Requirement to 10 CFR Part 61 | 11/03/2011 |
| 09/21/2011 | Proposed Regulatory Guide DG-1278 | No Response Required |
| 09/20/2011 | Draft Final Regulatory Guides 1.159, 1.221, and 1.218 | No Response Required |
| 09/20/2011 | Supplement 1 to NUREG-1930, "Safety Evaluation Report Related to the License Renewal of Indian Point Nuclear Generating Units 2 and 3" | No Response Required |
| 09/19/2011 | Draft Final Regulatory Guide 1.115, Revision 2, "Protection Against Turbine Missiles" | 10/25/2011 |
| 09/19/2011 | ACRS Assessment of the Quality of Selected NRC Research Projects-FY2011 | |
| 09/19/2011 | Revision 19 to the AP1000 Design Control Document and the AP1000 Final Safety Evaluation Report | 10/12/2011 |
| 08/11/2011 | Response to the June 8, 2011, EDO Letter Regarding Draft Final Revision 3 of Regulatory Guide (RG) 1.152, "Criteria for Use of Computers in Safety Systems of Nuclear Power Plants" | 01/30/2012 |
| 08/11/2011 | Topical Report NEDC-33173P, Supplement 2, Part 1, 2 and 3, "Analysis of Gamma Scan Data and Removal of Safety Limit Minimum Critical Power Ratio (SLMCPR) Margin | |
| 07/20/2011 | Information Requested During the April 7, 2011, ACRS Meeting | |
| 07/20/2011 | Draft Final Regulatory Guide 1.156 | No Response Required |
| 07/20/2011 | Request for Waiver of ACRS Review of Final Rule: U.S. Advanced Boiling Water Reactor Aircraft Impact Design Certification Amendment (RIN 3150-A184) | 08/04/2011 |
| 07/19/2011 | Supplement 2 to NUREG-1891 | No Response Required |
| 07/19/2011 | Proposed Regulatory Guide DG-1270 | No Response Required |
| 06/22/2011 | Draft Regulatory Guides DG-1261, DG-1262, and DG-1263 | |
| 06/22/2011 | Draft SECY Paper, "Options for Proceeding with Future Level 3 Probabilistic Risk Assessment Activities" | 09/21/2011 |
| 06/16/2011 | Report on the Safety Aspects of the License Renewal Application for the Hope Creek Generating Station | 07/14/2011 |
| 06/13/2011 | NRC Bulletin 2011-01, "Mitigating Strategies" | |
| 06/09/2011 | Draft Final Regulatory Guides 1.107 and 1.179 | No Response Required |
| 05/25/2011 | Report on the Safety Aspects of the License Renewal Application for the Salem Nuclear Generating Station Units 1 and 2 | 06/16/2011 |
| 05/24/2011 | Human Factors Considerations Associated with Emerging Technologies in Nuclear Power Plants | 06/16/2011 |
| 05/20/2011 | High Temperature Gas-Cooled Reactor (HTGR) NRC Research Plan | 06/10/2011 |
| 05/19/2011 | Response to the April 5, 2011, EDO Letter Regarding Draft Final Regulatory Guides 1.34, 1.43, 1.44, and 1.50 | 06/24/2011 |
| 05/19/2011 | Response to the February 5, 2011, EDO Letter Regarding the Final Safety Evaluation Associated with the Amendment to the AP1000 Design Control Document | 06/30/2011 |
| 05/18/2011 | Response to the March 1, 2011, EDO Letter Regarding Draft Final Rule, “Enhancements to Emergency Preparedness,” and Related Regulatory Guidance Documents | 06/22/2011 |
| 05/17/2011 | Safety Evaluation Report Related to the License Renewal of Prairie Island Nuclear Generating Plant, Units 1 and 2, Docket Numbers 50-282 and 50-306 | |
| 04/20/2011 | Final Draft Revision 3 of RG 1.152 Criteria for use of Computers in Safety Systems of Nuclear Power Plants | 06/08/2011 |
| 04/19/2011 | Response to the March 22, 2011, EDO Letter Regarding Comparison of Integrated Safety Analysis and Probabilistic Risk Assessment for Fuel Cycle Facilities | 06/01/2011 |
| 04/19/2011 | Chapters 2, 4, 5, 8, 10, 11, 12, 16, 17, and 19 of the Safety Evaluation Report with Open Items Associated with the Calvert Cliffs Nuclear Power Plant Unit 3 Combined License Application | 05/19/2011 |
| 04/12/2011 | Proposed Regulatory Guides DG-1264, DG1206, DG-1207, DG-1208, DG-1209, DG-1210, and DG-1267 | No Response Required |
| 04/12/2011 | Draft Final Regulatory Guides 8.2, 8.24, and 3.67 | No Response Required |
| 04/12/2011 | Additional Information Regarding The Safety Evaluation Report For The License Renewal Of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 | |
| 04/12/2011 | Draft Revision 3 to NUREG-1022, “Event Reporting Guidelines 10 CFR 50.72 and 50.73” | No Response Required |
| 03/23/2011 | Status of Groundwater Protection Task Force Efforts | 04/22/2011 |
| 03/23/2011 | Point Beach Nuclear Plant Units 1 and 2 Extended Power Uprate Application | 04/08/2011 |
| 03/16/2011 | SECY-11-0024, "Use of Risk Insights to Enhance the Safety Focus of Small Modular Reactor Reviews" | 03/22/2011 |
| 03/10/2011 | Draft Final Regulatory Guide 1.149 | No Response Required |
| 03/10/2011 | Draft Final Revision to 10 CFR 50.55a, "Codes and Standards" | |
| 03/10/2011 | Supplement 2 to NUREG-1907, "Safety Evaluation Report Related to the License Renewal of Vermont Yankee Nuclear Power Station, Docket NO. 50-271" | |
| 03/10/2011 | Withdrawal of Regulatory Guide 8.5 | No Response Required |
| 03/01/2011 | Report on the Safety Aspects of the License Renewal Application for the Palo Verde Nuclear Generating Station | 03/24/2011 |
| 02/28/2011 | Response to the January 21, 2011, EDO Letter Regarding the Safety Culture Policy Statement | 03/31/2011 |
| 02/24/2011 | Draft Final Regulatory Guides 1.34, 1.43, 1.44, and 1.50 | 04/05/2011 |
| 02/17/2011 | Comparison of Integrated Safety Analysis (ISA) to Probabilistic Risk Assessment (PRA) | 03/22/2011 |
| 02/17/2011 | Report on the Safety Aspects of the South Carolina Electric and Gas Company Combined License Application for V.C. Summer Nuclear Station, Units 2 and 3 | 03/26/2011 |
| 02/17/2011 | SECY-11-0014, “Use of Containment Accident Pressure in Analyzing Emergency Core Cooling System and Containment Heat Removal System Pump Performance in Postulated Accidents” | 03/27/2011 |
| 02/17/2011 | Current State of Licensee Efforts to Transition to National Fire Protection Association (NFPA) Standard 805 | 05/03/2011 |
| 02/17/2011 | Proposed Regulatory Guide DG-1254 | No Response Required |
| 01/31/2011 | Review of RAMONA5-FA For Use in BWR Stability Calculations | |
| 01/24/2011 | Draft Final Revision 2 to Regulatory Guide 1.174 and Revision 1 to Regulatory Guide 1.177 | 02/04/2011 |
| 01/24/2011 | Draft Final Rule, "Enhancements to Emergency Preparedness," and Related Regulatory Guidance Documents | 02/15/2011 |
| 01/24/2011 | Report on the Safety Aspects of the Southern Nuclear Operating Company Combined License Application for Vogtle Electric Generating Plant, Units 3 and 4 | 03/03/2011 |
| 01/19/2011 | Report on the Safety Aspects of the Aircraft Impact Assessment for the Westinghouse Electric Company AP1000 Design Certification Amendment Application | 02/09/2011 |
| 01/07/2011 | Report of the Safety Aspects of the License Renewal Application for the Kewaunee Power Station | 02/09/2011 |
Page Last Reviewed/Updated Thursday, August 27, 2026
Page Last Reviewed/Updated Thursday, August 27, 2026