The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Advisory Committee on Reactor Safeguards (ACRS) 2013 Letter Reports
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
| Date | Title | Response |
|---|---|---|
| 12/24/2013 | Chapters 6 and 7 of the Safety Evaluation Report With Open Items for Certification of the US-APWR Design and Related Long-Term Core Cooling Issues | 02/24/2014 |
| 12/18/2013 | Chapters 2, 6, and 7 of the Safety Evaluation Report With Open Items for the Comanche Peak Nuclear Power Plant, Units 3 and 4, US-APWR Reference Combined License Application | 01/16/2014 |
| 12/18/2013 | Staff Evaluation and Recommendation for Japan Lessons-Learned Tier 3 Issue on Expedited Transfer of Spent Fuel | 01/31/2014 |
| 12/12/2013 | Chapters 2, 3, 9, 13, and 14 of the Safety Evaluation Report with Open Items Associated with the Calvert Cliffs Nuclear Power Plant, Unit 3, Combined License Application | |
| 12/12/2013 | Draft Revision to Standard Review Plan Sections | No Response Required |
| 12/12/2013 | Proposed Rulemaking on Station Blackout Mitigation Strategies | |
| 11/21/2013 | ACRS Assessment of the Quality of Selected NRC Research Projects – FY 2013 | |
| 11/21/2013 | Interim ACRS Review of Watts Bar Nuclear Unit 2 Operating License Application | 01/09/2013 |
| 11/20/2013 | ACRS Review of Spent Fuel to Dry Cask Storage | |
| 11/20/2013 | Draft Final Revisions of Regulatory Guides 1.168 through 1.173, Software Processes for Digital Computers in Safety Systems of Nuclear Power Plants | 02/10/2014 |
| 11/20/2013 | Draft Commission Paper, "NRC Staff Recommendation for the Disposition of Recommendation 1 of the Near-Term Task Force Report" [SRM-M120911] | 12/06/2013 |
| 11/13/2013 | Draft Final Regulatory Guides | No Response Required |
| 10/18/2013 | Interim Staff Guidance JLD-LSG-2013-02, "Compliance With Order EA-13-109, Order Modifying Licenses With Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions" | |
| 10/08/2013 | Regulatory Guide 1.79, "Preoperational Testing of Emergency Core Cooling Systems for Pressurized-Water Reactors," Revision 2, and Regulatory Guide 1.79.1, "Initial Test Program of Emergency Core Cooling Systems for New Boiling-Water Reactors," Revision 0 | |
| 10/07/2013 | Draft Final Regulatory Guide (RG) 1.73 | No Response Required |
| 10/07/2013 | Draft Revision to Standard Review Plan Section | No Response Required |
| 10/07/2013 | WCAP-17577 | No Response Required |
| 09/19/2013 | Draft Commission Paper, "Recommendations for Risk Informing the Reactor Oversight Process for New Reactors" | 12/13/2013 |
| 09/16/2013 | Monticello Nuclear Generating Plant Extended Power Uprate License Amendment Request; | 10/22/2013 |
| 09/12/2013 | Proposed Amendment to 10 CFR 50.55a | No Response Required |
| 09/12/2013 | Draft Revisions to Standard Review Plan Section | No Response Required |
| 09/12/2013 | Draft Final Regulatory Guide 1.129 | No Response Required |
| 09/11/2013 | Withdrawal of Regulatory Guide 2.4 | No Response Required |
| 07/22/2013 | Revisions to Low-Level Radioactive Waste Disposal Requirements (10 CFR Part 61) | 08/29/2013 |
| 07/18/2013 | Spent Fuel Pool Study | 08/14/2013 |
| 07/17/2013 | Draft Revisions to Standard Review Plan Sections | No Response Required |
| 07/17/2013 | Proposed Draft Guide (DG-8031) | No Response Required |
| 07/01/2013 | Proposed Draft Guide (DG-3042) | No Response Required |
| 06/18/2013 | Draft Final Revisions Of Regulatory Guides 1.168 through 1.173, Software Processes For Digital Computers In Safety Systems Of Nuclear Power Plants | |
| 06/17/2013 | Draft Final Interim Staff Guidance | No Response Required |
| 06/17/2013 | Proposed Rulemaking on Station Blackout Mitigation Strategies | 08/01/2013 |
| 06/11/2013 | Draft Final Regulatory Guides | No Response Required |
| 05/15/2013 | Final Revision 2 of Regulatory Guide 1.137 | No Response Required |
| 05/15/2013 | Draft Revisions to Standard Review Plan Sections | No Response Required |
| 05/15/2013 | Next Generation Nuclear Plant (NGNP) Key Licensing Issues | 06/20/2013 |
| 05/02/2013 | WCAP-17116-P, "Westinghouse BWR ECCS Evaluation Model: Supplement 5-Application to ABWR" | 05/31/2013 |
| 04/29/2013 | Chapters 4, 15, 17, and 19 of the Safety Evaluation Report with Open Items for Certification of the US-APWR Design and Safety Evaluations of Supporting Topical Reports | 05/24/2013 |
| 04/26/2013 | Chapters 4, 13, 15, 16, 17, and 19 of the Safety Evaluation Report with Open Items for the Comanche Peak Nuclear Power Plant, Units 3 and 4, US-APWR Reference Combined License Application | 05/31/2013 |
| 04/15/2013 | Draft Final Regulatory Guide 1.68 | No Response Required |
| 04/15/2013 | Proposed Regulatory Guide DG-7009 | No Response Required |
| 03/20/2013 | Regulatory Guide 1.163, “Performance-Based Containment Leak-Test Program,” Revision 1 | 04/09/2013 |
| 03/19/2013 | Draft Design Specific Review Standard for mPower iPWR Chapter 7 Instrumentation and Control Systems | 04/29/2013 |
| 03/12/2013 | Proposed Regulator Guides DG-1235 and DG-1300 | No Response Required |
| 03/11/2013 | Draft Revisions to Standard Review Plan Sections | No Response Required |
| 03/11/2013 | Proposed Closeout – Generic Issue 189 | No Response Required |
| 02/26/2013 | Construction Reactor Oversight Process (cROP) Program and the Crop Pilot Program Results | 03/25/2013 |
| 02/14/2013 | Report on the Safety Aspects of the License Renewal Application for Limerick Generating Station, Units 1 and 2 | 03/25/2013 |
| 02/14/2013 | Draft NUREG-2125, "Spent Fuel Transportation Risk Assessment" | 03/25/2013 |
| 02/12/2013 | Final Interim Guidances 013 and 014 | No Response Required |
| 02/12/2013 | Withdrawal of Regulatory Guide 4.4 | No Response Required |
| 01/02/2013 | Draft NUREG-1855, Revision 1, “Guidance on the Treatment of Uncertainties Associated with PRAs in Risk-Informed Decisionmaking” | 02/05/2013 |
Page Last Reviewed/Updated Thursday, August 27, 2026
Page Last Reviewed/Updated Thursday, August 27, 2026