Part 21 Reports: 2025
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Log No. |
Notifier |
Description |
Report Date |
Event No. / Accession No. |
2025-06-01 |
Curtiss-Wright Nuclear Division |
Updated Interim Report of a Deviation Associated with GE Over/Under Voltage Time Delay Relay PN: 12|AV69A1A |
04/09/2025 |
ML25100A099 |
2025-06-00 |
Curtiss-Wright Nuclear Division |
Interim Report of a Deviation Associated with GE Over/Under Voltage Time Delay Relay PN: 12|AV69A1A |
04/08/2025 |
ML25099A160 |
2025-05-00 |
Southern Nuclear Operating Company |
Interim Report of a Deviation Associated with an ETAP Software Error in Transient Stability Program |
03/26/2025 |
ML25085A382 |
2025-04-00 |
Curtiss-Wright Nuclear Division |
Interim Report of a Deviation Associated with Generation 3 QDCs Produced from Curtiss-Wright Middleburg Heights |
03/12/2025 |
ML25072A045 |
2025-03-01 |
Duke Energy, Inc. |
Updated Interim Report of a Deviation Associated with Love Controllers Identified with Limpet Supplier Part Number 54-834-838-8187-8160-8134-8174 |
03/20/2025 |
ML25079A082 |
2025-03-00 |
Duke Energy, Inc. |
Interim Report of a Deviation Associated with Love Controllers Identified with Limpet Supplier Part Number 54-834-838-8187-8160-8134-8174 |
02/19/2025 |
ML25051A030 |
2025-02-01 |
Prairie Island Nuclear Generating Plant |
Closure of Interim Report of a Deviation Associated with an Edward Model 15004T5 2-inch Globe Valve |
02/28/2025 |
ML25059A074 |
2025-02-00 |
Prairie Island Nuclear Generating Plant |
Interim Report of a Deviation Associated with an Edward Model 15004T5 2-inch Globe Valve |
01/24/2025 |
ML25027A099 |
2025-01-01 |
Flowserve US, Inc |
Final Report of a Deviation Associated with Limitorque SMB-00 Torque Switch Assemblies |
02/14/2025 |
ML25050A042 |
2025-01-00 |
Flowserve US, Inc |
Interim Report of a Deviation Associated with Limitorque SMB-00 Torque Switch Assemblies |
01/02/2025 |
ML25006A165 |