Skip to main content

The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.

Part 21 Reports: 2019

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Log NoNotifierDescriptionReport DateEvent No. / Accession No.
2019-39-02Westinghouse Electric CompanyNSAL-20-1 Revision 1, "Reactor Vessel Head Control Rod Drive Mechanism Penetration Thermal Sleeve Cross-Sectional Failure" (Note: NSAL-20-1, Rev 1 is not a Part 21 report. However NSAL-20-1 does contain additional information related to the condition described in Part 21 report 2019-0039-00 and -01)10/13/2021ML21287A184
2019-39-01Westinghouse Electric CompanyNSAL-20-1 Revision 0, "Reactor Vessel Head Control Rod Drive Mechanism Penetration Thermal Sleeve Cross-Sectional Failure" (Note: NSAL-20-1 is not a Part 21 report. However NSAL-20-1 does contain additional information related to the condition described in Part 21 report 2019-0039-00).03/02/2020ML20063J583
2019-39-00Westinghouse Electric CompanyPotential Existence of Defect Pursuant to 10 CFR Part 21: Identification of a Fractured and Dislocated Control Rod Drive Mechanism (CRDM) Thermal Sleeve.12/12/2019ML19346H873
2019-38-00General AtomicsReportable Occurrence under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C).12/10/2019ML19347A426
2019-37-01Rosemount Nuclear Instruments, Inc.Notification under 10 CFR Part 21 for Rosemount Model 1153, 1154, and 3150 Series Pressure Transmitters02/26/2020ML20064C149
2019-37-00Rosemount Nuclear Instruments, Inc.Interim Notification under 10 CFR Part 21 for Rosemount Model 1153 and 1154 Pressure Transmitters12/05/2019ML19361A029
2019-36-01Palo Verde Nuclear Generating Station10 CFR 21 Notification for Masoneilan Model 8005N Transducer03/27/2020EN 54621
2019-36-00Palo Verde Nuclear Generating StationInterim 10 CFR 21 Report for Masoneilan Model 8005N Transducer11/15/2019ML19323C971
2019-35-00Frontek Anchor/Darling Enterprises, Inc.Degraded Hydraulic Snubber Fluid11/06/2019EN 54375
2019-34-00Browns Ferry, Units 1, 2, and 3Interim Report of a Deviation or Failure to Comply (GEH terminal board clip block, part number 228B2374P003)10/29/2019ML19302D983
2019-33-01Westinghouse Electric CompanyClosure of Westinghouse Interim Report of the Evaluation of a Deviation Related to 'T cold' Measurement Uncertainty [Log No. 2019-33-00 (ML19294C507)]03/12/2020ML20077M122
2019-33-00Westinghouse Electric CompanyInterim Report of the Evaluation of a Deviation Related to 'T cold' Measurement Uncertainty10/21/2019ML19294C507
2019-32-00Engine Systems, Inc.Report No. 10 CFR21-0127, Rev. 0, EMD Fuel Injectors - Seized Plunger and Bushing10/25/2019ML19317D093
2019-31-00Curtiss-Wright Nuclear DivisionIncorrectly Wired Socket Side Quick Disconnect Connectors10/22/2019EN 54345
2019-30-01Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3Written Defect Notification for GE-Hitachi Stationary Primary Contact Finger Q0114C5382P00210/31/2019ML19304B607
2019-30-00Palo Verde Units 1, 2 and 3GE Hitachi Primary Contact Finger Surface Defect10/04/2019EN 54309
2019-29-00AZZ Nuclear GroupInitial 10 CFR Part 21 Notification - F10 Series MCC Cubicle Stab Alignment - Ref: P21-10042019-110/04/2019ML19305B576
2019-28-00Arkansas Nuclear OneITE/Gould J20M Coil Block Relay10/02/2019EN 54215
2019-27-01FlowserveFinal Report (Event # 54301) – ASME Section III – NC-4000, Base Material Acceptance Criteria Usage in lieu of Welding Acceptance Criteria for Valves with Temporary Attachments (i.e. – Lug removal areas).10/22/2019EN 54301
2019-27-00FlowserveUse of Base Material Acceptance Criteria in Lieu of Welding Acceptance Criteria for Valves with Temporary Attachments (i.e. – Lug Removal Areas).09/30/2019ML19281B133
2019-26-00Westinghouse Electric CompanyNSAL-19-2 Revision 0, "Contactors Failing to Release/Open When De-energized."09/24/2019ML19269B709
2019-25-00Rotork Controls, Inc.Part 21 Notification Concerning a Safety Related "Outer Clutch Ring", Part Number N40039.09/23/2019ML19290E236
2019-24-00Emerson Process Management, LLCFisher Information Notice: FIN 2019-01 – Mechanical Setting of Disk/Stem Taper Pins08/23/2019ML19239A124
2019-23-00Engine Systems, Inc.Report No 10CFR21-0126, Rev 0 – EMD Fuel Injector – Cracked Spray Tip, PIN 522925008/22/2019ML19246A102
2019-22-01Flowserve Flow Control DivisionNon-Destructive Examination Performance of Components by an Unqualified Employee (Final Report)09/06/2019ML19261A194
2019-22-00Flowserve Flow Control DivisionNon-Destructive Examination Performance of Components by an Unqualified Employee08/12/2019EN 54215
2019-21-01Columbia Generating StationPart 21 Written Notification - Spectrum Technologies Control Power Transformers (Micron model B150-2957-1)09/03/2019ML19247C581
2019-21-00Columbia Generating StationPart 21 Notification - Spectrum Technologies Control Power Transformers (Micron model B150-2957-1)08/08/2019EN 54206
2019-20-03ITT Engineered Valves, LLCRevised Final Report to the NRC of 10 CFR 21 Event 54118 Concerning #25 AM Diaphragm Valves08/20/2019ML19234A129
2019-20-02ITT Engineered Valves, LLCFinal Report to the NRC of 10 CFR 21 Event 54118 Concerning #25 AM Diaphragm Valves08/13/2019ML19228A122
2019-20-01ITT Engineered Valves, LLCPart 21 Written Report Concerning #25 Airmotor Diaphragm07/12/2019ML19197A049
2019-20-00ITT Engineered Valves, LLCPotential Part 21 Issue Concerning #25 Airmotor Diaphragm06/14/2019ML19171A033
2019-19-02Engine Systems, Inc.10CFR21 Reporting of Defects and Non-Compliance (Signal Converter Transmitter) (Rev. 1)10/11/2019ML19295D732
2019-19-01Engine Systems, Inc.10CFR21 Reporting of Defects and Non-Compliance (Signal Converter Transmitter)07/19/2019ML19207A056
2019-19-00Engine Systems, Inc.Interim Report 10CFR21 Reporting of Defects and Non-Compliance (Signal Converter Transmitter)06/05/2019ML19165A027
2019-18-01Ultra ElectronicsUpdated Interim Notification Per 10CFR21 (Foxboro Weed N-E11 & N-E13 Series transmitters)07/26/2019ML19213A025
2019-18-00Ultra ElectronicsInterim Notification Per 10CFR21 (Foxboro Weed N-E11 & N-E13 Series transmitters)05/31/2019ML19155A084
2019-17-02Curtiss-Wright SASUpdate to 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - CW SAS Initial Report No. 10CFR21-4807/11/2019ML19210D434
2019-17-01Curtiss-Wright SAS10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - CW SAS Initial Report No. 10CFR21-4806/07/2019ML19190A048
2019-17-00Paragon Energy Solutions LLC10 CFR Part 21 Report of Defect - GS2 Terry Turbine Introl Positioners05/31/2019ML19168A012
2019-16-00SSM Industries, Inc.Notification of Potential Defect Applicable to Hytork XL 1126 Pneumatic Actuator05/22/2019ML19154A207
2019-15-04Lake Engineering Co.Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch ZJS1518 Final Report per 10 CFR Part 2111/07/2019ML19325C094
2019-15-03Lake Engineering Co.Third [Fourth] Interim Notification per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. ZJS151809/09/2019ML19263A666
2019-15-02Lake Engineering Co.Third Interim Notification per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. ZJS151807/05/2019ML19199A034
2019-15-01Lake Engineering Co.Second Interim Notification per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. ZJS151805/06/2019ML19136A044
2019-15-00Lake Engineering Co.Interim Notification per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. ZJS151803/05/2019ML19077A096
2019-14-00Flowserve Nuclear Products Operations (Vernon)Notification of Defect - Pressure Breakdown Sleeve, Part Number 09125139 installed in in Charging Pump Model - 2" RLIJ04/25/2019ML19119A085
2019-13-00AZZ NuclearInterim Report of Potential 10 CFR Part 21, EATON Size 1 and 2 A200 Series Starters/Contactors04/17/2019ML19120A106
2019-12-00Curtiss-Wright Nuclear Division, Enertech10 CFR Part 21 Notification for SF-1154 Hydraulic Fluid04/15/2019ML19121A155
2019-11-00AMETEK Solidstate ControlsNotification of Potential Defect - 10 CFR Part 2104/12/2019ML19106A106
2019-10-00Weir Valves & Controls USA, Inc.Part 21 Report - Residual Heat Removal System Motor Operated Globe Valve Experienced Stem Failures04/04/2019ML19101A097
2019-09-00Weir Valves & Controls USA, Inc.10 CFR Part 21 Report: 24" Class 150 Globe Failed to fully Open due to the Failure of the Anti-Rotation Key03/11/2019ML19087A251
2019-08-00Curtis-Wright Flow Control Co.Target Rock Solenoid Valve 810000-X Positioner Circuit Failure May Cause Undesired Position03/06/2019ML19072A063
2019-07-00FlowserveSpring Deflection Causing Potential Hang-Up of the Flapper (Disc), Worcester Series 4402/20/2019ML19064A231
2019-06-00Xcel Energy / Monticello"C" Outboard Main Steam Line Isolation Valve Delayed Closure Due to Foreign Material in the Air Valve (LER and Part 21 Report)02/14/2019ML19046A002
2019-05-02AZZ NuclearReport of Potential 10 CFR Part 21, EATON A200 Series Starters/Contactors08/29/2019ML19253A053
2019-05-01AZZ NuclearUpdated Part 21 Notification of Potential 10 CFR Part 21, EATON A200 Series Starters/Contactors03/08/2019ML19080A059
2019-05-00AZZ NuclearPart 21 Initial Notification of Potential 10 CFR Part 21, EATON A200 Series Starters/Contactors02/08/2019ML19053A499
2019-04-00SOR Inc.Part 21 Notification of Deviation SOR R-Series Housing with Terminal Block02/01/2019ML19053A500
2019-03-01Engine Systems Inc.10 CFR 21 Reportable Notification on Excitation Transformers for Vickers Voltage Regulator System03/21/2019ML19087A252
2019-03-00Engine Systems Inc.Part 21 Report - Saturable Reactor (Magnetic Amplifier) for Vickers Voltage Regulator System, P/N 8408218-ESI01/25/2019ML19042A080
2019-02-00Weschler InstrumentsNotification of a Potential Defect in Weschler KX-241 axial, VX-252 and VC-252 Instrument Models01/17/2019ML19024A163
2019-01-00AMETEK Solidstate ControlsDedication Testing not performed on Safety-Related Operational Spare Parts Kits01/07/2019ML19024A164

 

Page Last Reviewed/Updated Saturday, September 12, 2026

Page Last Reviewed/Updated Saturday, September 12, 2026