Part 21 Reports - 2002
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Log No | Notifier | Description | Report Date | Access No |
---|---|---|---|---|
2002-01-0 | Boeing | GTSTRUDL rigid body incidences command | 10/31/2001 | ML020090019 |
2002-01-1 | Boeing | GTSTRUDL calculate resultant command | 11/28/2001 | ML020090080 |
2002-01-2 | Boeing | GTSTRUDL print member properties command | 12/20/2001 | ML020220325 |
2002-02-0 | U.S. Geological Survey | dosimetry at Triga reactor | 11/21/2001 | ML020110184 |
2002-03-0 | ASCO Valve | Hydramotor® actuator limit switch | 12/21/2001 | ML020240230 |
2002-03-1 | ASCO Valve | Hydramotor® actuator limit switch | 01/14/2002 | ML020420376 |
2002-04-0 | Automatic Valve | air operated valve leakage | 01/25/2002 | ML021200032 |
2002-05-0 | General Electric | cutoff switch in AK-15, AK-25, and AKR-30S circuit breakers | 02/18/2002 | ML020650058 |
2002-06-0 | ABB | weight balance on CV-2 and CV-22 relays | 03/19/2002 | Event Notification 38781 |
2002-06-1 | ABB | weight balance on CV-2 and CV-22 relays | 05/08/2002 | ML021440028 |
2002-07-0 | General Electric | offset in instantaneous (magnetic) trip current on certain J-core molded case circuit breakers | 04/03/2002 | ML020990033 |
2002-08-0 | Wyle | incorrect irradiation dose units in hot cell work | 04/12/2002 | ML021060181 |
2002-08-1 | Wyle | incorrect irradiation dose units in hot cell work | 05/22/2002 | ML021570176 |
2002-09-0 | General Electric | missing lock washer on CR105X contactors | 04/12/2002 | ML021150567 |
2002-10-0 | Rockwell Automation | inadequate electric motor winding slot fill | 05/09/2002 | ML021360406 |
2002-10-1 | Rockwell | inadequate electric motor winding slot fill | 05/16/2002 | ML021790469 |
2002-10-2 | Rockwell Automation | inadequate electric motor winding slot fill | 06/07/2002 | ML021830510 |
2002-11-0 | General Electric | undersized washer in switch plate locking mechanism on differential pressure indicating switches | 05/10/2002 | ML021360140 |
2002-12-0 | ABB | failure of K-Line circuit breakers to charge at San Onofre | 05/14/2002 | Event Notification 38919 |
2002-13-0 | Solid State Controls | potential for loose fan blade in uninterruptible power systems | 05/15/2002 | ML021510295 |
2002-14-0 | Consumers Energy | lack of quality assurance maintenance on Midland Unit 2 reactor pressure vessel head | 05/23/2002 | ML021550411 |
2002-15-0 | Rotork Controls | potential for electric valve actuator control switches to reset or fail to operate | 06/10/2002 | ML021790313 |
2002-16-0 | ASCO | excessive recycling of pump needed to maintain valve actuator shaft in powered position during testing | 06/19/2002 | ML021830047 |
2002-16-1 | ASCO | excessive recycling of pump needed to maintain valve actuator shaft in powered position during testing | 07/19/2002 | ML022070455 |
2002-16-2 | ASCO | potential operational difficulties with certain pumps supplied in pump kits and intended for installation in NH95 Model B Hydramotor® actuators | 08/02/2002 | ML022210232 |
2002-16-3 | ASCO Valve Inc. | Excessive recycling of pump needed to maintain valve actuator shaft in powered position during testing | 12/17/2002 | ML023600354 |
2002-17-0 | Rosemount | inaccurate advice to Rochester Gas and Electric concerning calibration of Models 1152 and 1154 pressure transmitters with high line pressure | 07/24/2002 | Event Notification 39086 |
2002-18-0 | Engine Systems | EMD emergency diesel generator air start system pressure regulating valve may stick open | 07/30/2002 | ML022190534 |
2002-19-0 | Engine Systems | potential bearing cooling oil blockage from loose flashing material used in manufacture of EMD 645 engine pistons | 08/01/2002 | ML022200286 |
2002-20-0 | Rockbestos | incorrect lacquer applied to electrical cable could contribute to flame propagation | 08/09/2002 | ML022260608 |
2002-20-1 | Rockbestos | Cable failed to comely with the vertical tray flame test when subjected to the requirements | 08/09/2002 | ML022900277 |
2002-21-0 | General Electric | inadequate vibratory loads on main steam isolation valves with one main steam isolation valve out of service | 08/23/2002 | ML022380417 |
2002-21-1 | General Electric | Main Steam Line Valve Out-of-Service Final Report | 08/23/2002 | ML022810290 |
2002-22-0 | ABB | test failure of a power shield trip device manufactured before March 1991 | 08/26/2002 | ML022410017 |
2002-22-1 | ABB | Power Shield Transformer Saturation | 08/26/2002 | ML022740451 |
2002-23-0 | Rosemount | failures of capacitors in damping circuits of certain Models 1153 and 1154 | 08/30/2002 | ML022620057 |
2002-24-0 | Rosemount | certain Model 1153 differential pressure transmitters and space sensor modules may not meet the published temperature effect specification | 09/09/2002 | ML022620059 |
2002-25-0 | ALCo (Fairbanks Morse) | Fuel injector pump found to be leaking excessively through a nameplate rivet hole | 09/18/2002 | Event Notification 39197 |
2002-25-1 | ALCo (Fairbanks Morse) | Fuel injector pump found to be leaking excessively through a nameplage rivet hole | 10/11/2002 | ML022960351 |
2002-26-0 | Fitzpatrick | Trip device over current sensor failed during bench testing | 09/26/2002 | Event Notification 39218 |
2002-26-1 | Fitzpatrick | Trip device over current sensor failed during bench testing | 10/02/2002 | ML022890175 |
2002-27-0 | General Electric | Potentially delayed reactor scram because of the period based detection algorithm (PBDA) | 10/04/2002 | ML022830278 |
2002-27-1 | General Electric | Final Report, Stability Option III: Possible Successive COnfirmation Count Resets | 11/18/2002 | ML023290162 |
2002-28-0 | General Electric | Technical Specification safety limit for minimum critical power ratio (MCPR) may be exceeded in BWR/6 plant using newer fuel designs | 10/04/2002 | ML022820162 |
2002-29-0 | C & D Technologies | A series of welds for a fuel rack joining horizontal cross beams were not welded correctly during fabrication and may effect seismic qualifications | 10/11/2002 | ML022900283 |
2002-30-0 | Engineer Systems | Seal within engine driven water pump assembly failed prematurely resulting in leakage of primary cooling water and lubricating oil from weep hole in EDG | 10/04/2002 | ML022900613 |
2002-31-0 | General Electric | Stability Option III Period Based Detection Algorithm T-min Specification Has a Defect | 11/22/2002 | ML023310569 |
2002-32-0 | Framatome | The MCPR calculation using the SPCB correlation in the MICROBURN-B2 and MICROBURN-B codes and associated POWERPLEX monitoring software contains an erroPower Shield Transformer Saturation | 11/22/2002 | ML023310566 |
2002-33-0 | Spectrum Technologies | Class 1E safety related Cutler-hammer A200 NEMA Size 1 starter found to be faulty | 11/25/2002 | ML023330442 |
2002-33-1 | Spectrum Technologies | Class 1E safety related Cutler-hammer A200 NEMA Size 1 starter found to be faulty | 12/20/2002 | ML023600023 |
2002-35-0 | ABB | Broken solder joints (crack in solder joint) on some pins on the tap blocks of Power shield trip devices | 11/20/2002 | ML030160169 |
2002-36-0 | Caboline | Premature gellation or significant thickening prior to the end of the 12-month shelf life expiration date of Carbonize 11 SG | 12/06/2002 | ML023500215 |
2002-37-0 | Framatome | Location of fuel assemblies in BWR/6 reactors with the POWRPLEX incore monitoring system may affect their orifice pressure loss coefficients | 12/10/2002 | ML023470352 |
2002-38-0 | Boeing Company | Errors associated with the computer codes "ANSYS" and "GTSTRUDL" | 11/19/2002 | ML023360088 |
Page Last Reviewed/Updated Tuesday, March 09, 2021
Page Last Reviewed/Updated Tuesday, March 09, 2021