Skip to main content

Part 21 Reports: 2023

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Log No.

Notifier

Description

Report Date

Event No. / Accession No.

2023-31-01

Tennessee Valley Authority 

Final Report of a Deviation Associated with a Lube Oil Scavenging and Fuel Oil Engine Driven Pump 

02/14/2024

ML24046A025

2023-31-00

Tennessee Valley Authority

Interim Report of a Deviation Associated with an Lube Oil Scavenging and Fuel Oil Engine Driven Pump 

12/28/2023

ML24002A711

2023-30-00

Valcor Engineering Corporation

Interim Report of a Defect Associated with Valcor Solenoid Valves V52600-5890-1 

12/22/2023

ML23363A146

2023-29-00 

VC Summer 

Interim Report of a Deviation Associated with the Design of an Emergency Diesel Generator Fuel Oil Piping System 

12/21/2023

ML26048A141

2023-28-01

Paragon Energy Solutions

Final Report of a Deviation Associated with Detroit Diesel/MTU Fuel Injectors PN R5229660 Cat ID# 0001390618  

01/17/2024

ML24018A036

2023-28-00

Paragon Energy Solutions

Interim Report of a Deviation Associated with Detroit Diesel/MTU Fuel Injectors PN R5229660 Cat ID# 0001390618 

12/19/2023

ML23354A094

2023-27-01

TVA (Tennessee Valley Authority)

Final Report of a Deviation Associated with Starter Contactors for the BFN Unit 1 High Pressure Coolant Injection Suppression Pool Inboard Suction Valve 

02/01/2024

ML24032A476

2023-27-00

TVA (Tennessee Valley Authority)

Interim Report of a Deviation Associated with Starter Contactors for the BFN Unit 1 High Pressure Coolant Injection Suppression Pool Inboard Suction Valve

12/14/2023

ML23348A394

2023-26-02

Tioga Pipe, Inc

Final Report of a Deviation Associated with Buttweld 90 Degree Elbows  

02/02/2024

ML24037A020

2023-26-01

Flowline Inc.

Interim Report of a Deviation Associated with Buttweld 90 Degree Elbows  

12/12/2023

ML24004A209

2023-26-00

Tioga

Interim Report of a Deviation Associated with Buttweld 90 Degree Elbows

12/08/2023

ML23352A238

2023-25-01

Sequoyah

Final Report of a Deviation Associated with Siemens 6.9kV, 1200A Vacuum Circuit Breaker Defects 

01/10/2024

ML24010A213

2023-25-00

Sequoyah

Interim Report of a Deviation Associated Siemens 6.9kV, 1200A Vacuum Circuit Breaker Defects 

12/13/2023

ML26048A138

2023-24-01

Tennessee Valley Authority

Final Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump 

01/23/2024

ML24023A280

2023-24-00

Tennessee Valley Authority

Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump

12/01/2023

ML23335A072

2023-23-01

Enertech

Final Report of a Deviation Associated with P/N D2060S Potentiometer 

12/07/2023

ML23352A246

2023-23-00

Enertech

Interim Report of a Deviation Associated with P/N D2060S Potentiometer

10/27/2023

ML23306A072

2023-22-02

MISTRAS Group, Inc

Final Report Notification Pursuant to 10 CFR Part 21.21, Regarding a Deviation in the Calibration Certificates for An Acoustic Emission Instrument

11/10/2023

ML23317A291

2023-22-01

MISTRAS Group, Inc

Deviation in the Calibration Certificates for An Acoustic Emission Instrument

10/31/2023

ML26048A137

2023-22-00

MISTRAS Group, Inc

Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding a Deviation in the Calibration Certificates for an Acoustic Emission Instrument

10/20/2023

ML23296A086

2023-21-01

DC Cook Nuclear Plant

Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding an issue with an Emergency Diesel Generator (EDG) Digital Reference Unit (DRU) supplied by Engine Systems Incorporated

11/08/2023

ML23312A231

2023-21-00

DC Cook Nuclear Plant

Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding an issue with an Emergency Diesel Generator (EDG) Digital Reference Unit (DRU) supplied by Engine Systems Incorporated

10/12/2023

ML26048A136

2023-20-02

Browns Ferry Nuclear Plant  

Final Report of a Deviation Associated with a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump  

01/16/2024

ML24016A304

2023-20-01

Browns Ferry Nuclear Plant

Interim Report of a Deviation Associated with a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump 

11/16/2023

ML23320A254

2023-20-00

Browns Ferry Nuclear Plant

Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump

10/06/2023

ML23282A002

2023-19-01

Flowserve Limitorque Actuators 

Final Report of a Deviation Associated with a SMB-1 Geared Limit Switch Assembly 

11/17/2023 

ML23324A377

2023-19-00

Flowserve Limitorque Actuators

Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding a Deviation Associated With a SMB-1 Geared Limit Switch Assembly

09/28/2023

ML23276A641

2023-18-01

Paragon Energy Solutions

Final Report Notification Pursuant to 10 CFR Part 21.21, Regarding Potential Defect with Eaton JD and HJD Series Molded Case Circuit Breakers

10/05/2023

ML23279A061

2023-18-00

Paragon Energy Solutions

Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Potential Defect with Eaton JD and HJD Series Molded Case Circuit Breakers

09/06/2023

ML23254A024

2023-17-01

Curtis-Wright Nuclear Division

Final Report Notification Pursuant to 10 CFR Part 21.21, Regarding Tyco (Agastat) Relay Failures

10/05/2023

ML23293A051

2023-17-00

Curtis-Wright Nuclear Division

Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Tyco (Agastat) Relay Failures

08/17/2023

ML23233A169

2023-16-01

Cooper Nuclear Station

Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Certain GE-Hitachi HGA Relays

09/06/2023

ML23249A112

2023-16-00

Cooper Nuclear Station

Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Certain GE-Hitachi HGA Relays

08/15/2023

ML26048A134

2023-15-01

Paragon Energy Solutions

Final Report Notification Pursuant to 10 CFR Part 21.21, Regarding Defect with Eaton/Cutler Hammer Size 4 and 5 Freedom Series Contactors

08/25/2023

ML23241A002

2023-15-00

Paragon Energy Solutions

Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Defect with Eaton/Cutler Hammer Size 4 and 5 Freedom Series Contactors

08/03/2023

ML23221A370

2023-14-01

GE Hitachi Nuclear Energy

Part 21 Final Report Notification: Failure of the CRD Collet Retainer Tube/Outer Tube Weld

7/26/2023

ML23207A198

2023-14-00

GE Hitachi Nuclear Energy

Updated - Part 21 60-Day Interim Report Notification: Failure of the CRD Collet Retainer Tube/Outer Tube Weld

08/31/2023

ML23243B004

2023-13-01

River Bend Station

Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Motor Driven Relay Failed Testing

08/24/2023

ML23236A246

2023-13-00

River Bend Station

Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Motor Driven Relay Failed Testing

07/26/2023

ML26048A131

2023-12-01

Summer

10 CFR Part 21 Report Emergency Feedwater Check Valve Socket Head Capscrew

07/31/2023

ML23212A954

2023-12-00

Summer

Initial Report Notification Pursuant to 10 CFR Part 21.21, Regarding Cap Screw Improper Length

07/07/2023

ML26044A211

2023-11-00

Engine Systems, INC

Initial Report Notification Pursuant to 10 CFR Part 21.21, Regarding Voltage Regulator Chassis – Bus Bar Installation

06/30/2023

ML23192A062

2023-10-01

Paragon Energy Solutions

Retraction of Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Potential Defect with Trane External Auto/Stop and Emergency Stop Relay Card PN: X13650728-06

07/14/2023

ML23207A076

2023-10-00

Paragon Energy Solutions

Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Potential Defect with Trane External Auto/Stop and Emergency Stop Relay Card PN: X13650728-06

06/05/2023

ML23159A005

2023-09-01

DTE Electric Company, Fermi 2

Final Report Notification Pursuant to 10 CFR Part 21.21, Regarding Mechanical Draft Cooling Tower Fan Brakes Design Flaw

06/23/2023

ML23177A043

2023-09-00

DTE Electric Company, Fermi 2

Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Mechanical Draft Cooling Tower Fan Brakes Design Flaw

05/26/2023

ML23159A004

2023-08-00

Engine Systems, INC

Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Woodward EGB-35P Governor

05/24/2023

ML23146A001

2023-07-00

Flowserve Limitorque Actuators

Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Limitorque Actuator Motor Pinion Installation

05/19/2023

ML23142A174

2023-06-00

Tennessee Valley Authority

Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Deviation or Failure to Comply Associated with a GE HFA Relay

05/01/2023

ML23121A325

2023-05-00

Framatome Inc.

Initial Report Notification Pursuant to 10 CFR Part 21.21, Regarding DS-206DC/416/632/II-516 Breakers – Erroneous Change of State (Eaton Corporation Breakers)

04/07/2023

ML23100A107

2023-04-00

Trillium Flow Technologies

Initial Report Notification Pursuant to 10 CFR Part 21.21 Regarding Inconsistent Crimping of Motor Leads to Ring Terminal Connectors - Evaluation I211003

03/06/2023

ML23082A112

2023-03-01

Paragon Energy Solutions

Final Report Notification Pursuant to 10 CFR Part 21.21 Defect identified in Automatic Transfer Switch PN: NLI-ATS480A400X1

03/31/2023

ML23094A137

2023-03-00

Paragon Energy Solutions

Initial Report Notification Pursuant to 10 CFR Part 21.21 Defect identified in Automatic Transfer Switch PN: NLI-ATS480A400X1

03/06/2023

ML23065A196

2023-02-00

Sequoyah Nuclear Plant

Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Siemens Medium Voltage Circuit Breakers

01/25/2023

ML23025A253

2023-01-02

Sequoyah Nuclear Plant

Retraction of Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Deviation or Failure to Comply Associated with a Limitorque Actuator

05/04/2023

ML23124A018

2023-01-01

Sequoyah Nuclear Plant

Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Deviation or Failure to Comply Associated with a Limitorque Actuator

03/01/2023

ML23060A041

2023-01-00

Sequoyah Nuclear Plant

Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Deviation or Failure to Comply Associated with a Limitorque Actuator

01/24/2023

ML23024A029

To top of page

Page Last Reviewed/Updated Thursday, February 19, 2026

Page Last Reviewed/Updated Thursday, February 19, 2026