Part 21 Reports - 2017

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Log NoNotifierDescriptionReport DateEvent No. / Accession No.
2017-57-00Curtiss-Wright Nuclear DivisionWestinghouse / Eaton Cutler Hammer Part Number KD2200U18 (with Trip Unit P/N KT200T)12/15/2017ML18023A407
2017-56-00Crane Nuclear, Inc.10 CFR Part 21 Notification of Defect on Weak Link Analysis for Chapman Gate Valve12/19/2017ML18003A260
2017-55-01SOR Inc.Final Report for Potential 10 CFR 21 Notification for SOR Qualification Test Report 9058-102 Revision 202/05/2018ML18039A293
2017-55-00SOR Inc.Interim Report for Potential 10 CFR 21 Notification for SOR Qualification Test Report 9058-102 Revision 212/15/2017ML18003A259
2017-54-00Engine Systems, Inc.Turbine Driven Auxiliary Feedwater Pump Control Panel Power Supply Failure11/21/2017ML17333A379
2017-53-01Ultra ElectronicsInterim Report Retraction – Review of Design Changes to the Commercially Purchased Schneider I/A Pressure Transmitter11/17/2017ML17332A005
2017-53-00Ultra ElectronicsInterim Report – Review of Design Changes to the Commercially Purchased Schneider I/A Pressure Transmitter10/27/2017ML17312A278
2017-52-00Fisher Controls InternationalFisher Type 461 Valve Plug Machining11/17/2017ML17324A979
2017-51-00Ametek Solidstate Controls.Potentially Defective Eaton Auxiliary Switch Installed in EG Frame Molded Case Circuit Breakers10/30/2017ML17311A907
2017-50-00Engine Systems, Inc.Speed Switch Issue Results in Emergency Diesel Generator Failure to Start10/26/2017ML17311A150
2017-49-01Palo Verde Nuclear Generating StationFinal Report on HPSI Motor Lead Insulation Gouged11/08/2017ML17312A842
2017-49-00Palo Verde Nuclear Generating StationHPSI Motor Lead Insulation Gouged10/18/2017EN 53023
2017-48-00National Technical Systems, Inc.Part 21 on Siemens 5-3AF-GER-350-1200-78 & 5-3AF-GEU-350-1200-78 Circuit Breakers10/11/2017ML17286A024
2017-47-01Paragon Energy SolutionsClosure of Interim Report of a Potential Defect of a Paragon Energy Solutions Provided Switch Assembly11/27/2017ML17354A026
2017-47-00Paragon Energy SolutionsInterim Report of a Potential Defect of a Paragon Energy Solutions Provided Switch Assembly10/06/2017ML17311A904
2017-46-01CallawayWritten Notification Regarding Cameron Barton Model 752B Differential Pressure Transmitters10/31/2017ML17304A947
2017-46-00CallawayPart 21 - Initial Notification - Cameron Model 752B Differential Pressure Transmitters10/03/2017EN 52998
2017-45-00XCEL Energy / Prairie Island Unit 2Initial Notification – EDG High Crankcase Pressure Switch Mounting Bracket Fastener System Failure09/14/2017ML17257A411
2017-44-00Nutherm International, Inc.Relay Failure Allen-Bradley Model 700DC08/30/2017ML17311A903
2017-43-00Fisher Controls International, Inc.Erroneous Rotary Seating Torque Calculation in FlowScanner 6.6 Software08/28/2017ML17243A136
2017-42-02Cooper Nuclear StationLicensee Event Report and Part 21 Written Notification – Defect of an Allen-Bradley Control Relay in a NuTherm Starter12/15/2017ML17354A149
2017-42-01Cooper Nuclear StationLicensee Event Report and Part 21 Written Notification - Defect of an Allen-Bradley Control Relay in a NuTherm Starter09/27/2017ML17279A111
2017-42-00Cooper Nuclear StationAllen-Bradley 700DC Relay Failure08/28/2017EN 52934
2017-41-01Elekta, Inc.Written Notification of a Defect: Oncentra Brachy Applicator Modeling Software when using a Measured Source Path09/22/2017ML17271A139
2017-41-00Elekta, Inc.Oncentra Software Problem may cause Unintended Step Size during Brachytherapy Treatment08/25/2017EN 52926
2017-40-01Columbia Generating StationPart 21 Notification: GE-Hitachi HMA124A2 Relay Back Plate Mounted Incorrectly09/06/2017ML17249A692
2017-40-00Columbia Generating StationGE-Hitachi HMA124A2 Relay Back Plate Mounted Incorrectly08/17/2017EN 52913
2017-39-04Crane Nuclear, Inc.Closure of Interim Report Notification of XOMOX Plug Valve High Torsional Stress in Stem (Retraction)03/21/2018ML18087A002
2017-39-03Crane Nuclear, Inc.Interim Report Notification of XOMOX Plug Valve High Torsional Stress in Stem (Update)01/31/2018ML18078A536
2017-39-02Crane Nuclear, Inc.Interim Report Notification of XOMOX Plug Valve High Torsional Stress in Stem10/31/2017ML17311A909
2017-39-01Crane Nuclear, Inc.Notification of XOMOX Plug Valve High Torsional Stress in Stem (Update)08/29/2017EN 52857
2017-39-00Crane Nuclear, Inc.Notification of XOMOX Plug Valve High Torsional Stress in Stem07/14/2017ML17206A040
2017-38-01Curtiss-Wright Nuclear DivisionWritten Notification for Nova Machine Products Hex Cap Screws Produced from One Heat of Material08/09/2017ML17223A200
2017-38-00Curtiss-Wright Nuclear DivisionInitial Notification for Nova Machine Products Hex Cap Screws Produced from One Heat of Material07/13/2017ML17206A039
2017-37-00ITT Enidine, Inc.Potential Current to Pressure Transducer Component Defect06/26/2017ML17188A422
2017-36-00TE ConnectivityFailure of an Agastat Timing Relay06/16/2017ML17179A378
2017-35-02Susquehanna Steam Electric StationWritten Notification of a Deviation Related to the Failure of an Eaton/Cutler Hammer A200 Series Starter08/17/2017ML17229B267
2017-35-01Susquehanna Steam Electric StationInitial Notification of a Deviation Related to the Failure of an Eaton/Cutler Hammer A200 Series Starter07/21/2017ML17223A198
2017-35-00Susquehanna Steam Electric StationInterim Report of a Deviation Related to the Failure of an Eaton/Cutler Hammer A200 Series Starter06/09/2017ML17160A403
2017-34-00Engine Systems, Inc.Defective Motor Operated Potentiometer06/09/2017ML17165A407
2017-33-02WECTEC LLCClosure of Interim Report Regarding One PCCS Pipe Spool for V. C. Summer Unit 3 and one RCS Pipe Spool for V. C. Summer Unit 208/14/2017ML17251A839
2017-33-01WECTEC LLCUpdated Interim Report Regarding One PCCS Pipe Spool for V. C. Summer Unit 3 and one RCS Pipe Spool for V. C. Summer Unit 206/19/2017ML17251A841
2017-33-00WECTEC LLCInterim Report Regarding One PCCS Pipe Spool for V. C. Summer Unit 3 and One RCS Pipe Spool for V. C. Summer Unit 205/15/2017ML17145A278
2017-32-00Emerson Automation SolutionsBettis Brand Seismic Qualified G Series Spring Return Actuators05/18/2017ML17142A321
2017-31-03Curtiss-Wright Nuclear DivisionUpdated Final Findings Associated with a Potential Defect in Certain Lots of Grayboot Socket Contacts09/11/2017ML17311A905
2017-31-02Curtiss-Wright Nuclear DivisionUpdated Final Findings Associated with a Potential Defect in Certain Lots of Grayboot Socket Contacts06/09/2017ML17165A406
2017-31-01Curtiss-Wright Nuclear DivisionFinal Findings Associated with a Potential Defect in Certain Lots of Grayboot Socket Contacts05/31/2017ML17160A303
2017-31-00Curtiss-Wright Nuclear DivisionPotential Defect in Certain Lots of Grayboot Socket Contacts Supplied with EQ Qualified Grayboot Connector Kits05/15/2017ML17142A322
2017-30-01Tioga Pipe, Inc.Closure of Interim Report Regarding Supply Of 0.5" OD Stainless Steel Tubing09/22/2017EN 52745
2017-30-00Tioga Pipe, Inc.Interim Report Regarding Supply Of 0.5" OD Stainless Steel Tubing05/11/2017ML17142A323
2017-29-01Emerson Fisher Controls InternationalUpdated Interim Report Relating to a Potential Minimum Wall Thickness Issue on Certain Posi-Seal Valves06/09/2017ML17165A405
2017-29-00Emerson Fisher Controls InternationalInterim Report Relating to a Potential Minimum Wall Thickness Issue on Certain Posi-Seal Valves05/09/2017ML17142A325
2017-28-03Lake Engineering Corp.Closure of Interim Notification Related to Potentially Degraded Snubber SF-1154 Hydraulic Fluid12/05/2017ML17355A139
2017-28-02Lake Engineering Corp.Third Interim Notification Related to Potentially Degraded Snubber SF-1154 Hydraulic Fluid11/03/2017ML17313A471
2017-28-01Lake Engineering Corp.Second Interim Notification Related to Potentially Degraded Snubber SF-1154 Hydraulic Fluid07/24/2017ML17128A465
2017-28-00Lake Engineering Corp.Interim Notification Related to Potentially Degraded Snubber SF-1154 Hydraulic Fluid05/01/2017ML17128A465
2017-27-01Ametek Solidstate ControlsFinal Notification of Potential Defect on X202 Crest Factor Printed Circuit Board (80-9213516-90)06/01/2017ML17160A302
2017-27-00Ametek Solidstate ControlsInterim Notification of Potential Defect on X202 Crest Factor Printed Circuit Board (80-9213516-90)05/08/2017ML17135A310
2017-26-00Summerill Tube Corp.Interim Report Related to Unqualified Source Material for Nuclear Applications05/05/2017ML17135A314
2017-25-00Emerson Process Management / TopWorxPotential Nonconformance Related to Certain TopWorx C8, M8, and H8 Series Switches05/04/2017ML17135A311
2017-24-01Xcel Energy / MonticelloClosure of Interim Report of a Deviation Related to a new GE Relay Coil07/31/2017ML17213A025
2017-24-00Xcel Energy / MonticelloInterim Report of a Deviation Related to a new GE Relay Coil04/20/2017ML17110A244
2017-23-01CB&I LaurensClosure of Interim Report Regarding Indeterminate NDE Test Reports for Summer 2 & 3 and Vogtle 3 & 4 AP1000 Projects05/26/2017ML17159A510
2017-23-00CB&I LaurensInterim Report Regarding Indeterminate NDE Test Reports for Summer 2 & 3 and Vogtle 3 & 4 AP1000 Projects04/10/2017ML17109A325
2017-22-01WECTEC LLCClosure of Interim Part 21 Report Regarding 5/8 inch Stainless Steel Tubing for V.C. Summer Unit 2 and 3 AP1000 Project05/23/2017ML17156A502
2017-22-00WECTEC LLCInterim Part 21 Report Regarding 5/8 inch Stainless Steel Tubing for V.C. Summer Unit 2 and 3 AP1000 Project03/15/2017ML17109A327
2017-21-01GE-Hitachi Nuclear EnergyFinal Report: Control Rod Drive Mechanisms (CRDM) Contaminated with Chlorides07/11/2017ML17193A256
2017-21-00GE-Hitachi Nuclear EnergyInterim Report Notification: Control Rod Drive Mechanisms (CRDM) Contaminated with Chlorides04/19/2017ML17109A072
2017-20-01CB&I AREVA MOX ServicesClosure of Interim Report Related to Undersized Vendor Welds on Gloveboxes Supplied by Robatel03/21/2017ML18080A024
2017-20-00CB&I AREVA MOX ServicesInterim Report Related to Undersized Vendor Welds on Gloveboxes Supplied by Robatel04/12/2017ML17107A133
2017-19-00Emerson Fisher Controls InternationalType 546NS Electro-Pneumatic Transducer and Associated Standard Mounting Bracket Seismic Qualification04/13/2017ML17104A288
2017-18-00ABB Inc.Part 21 Notification of a Deviation – GKT Relay04/13/2017ML17114A071
2017-17-01AMETEK Solidstate ControlsPotential Failure of Vishay Diodes (Corrected Serial Number)04/06/2017ML17101A366
2017-17-00AMETEK Solidstate ControlsPotential Failure of Vishay Diodes04/03/2017ML17096A269
2017-16-00Engine Systems, Inc.Manufacturing Defect in Allen-Bradley Diode Surge Suppressor (P/N 199-FSMZ-1) Supplied by ESI03/27/2017ML17090A398
2017-15-01Columbia Generating StationDefect in Size 1 Freedom Series Starters with nominal 120 VAC Coils Manufactured by AZZ/NLI (Written Report)04/13/2017ML17103A545
2017-15-00Columbia Generating StationDefect in Size 1 Freedom Series Starters with nominal 120 VAC Coils Manufactured by AZZ/NLI03/17/2017ML17081A454
2017-14-01WECTEC LLCClosure of Interim Part 21 Report Regarding a Pipe Support for V. C. Summer Unit 2 AP1000 Project05/08/2017ML17138A206
2017-14-00WECTEC LLCInterim Part 21 Report Regarding a Pipe Support for V. C. Summer Unit 2 AP1000 Project03/02/2017ML17072A049
2017-13-01WECTEC LLCClosure of Interim Part 21 Report Regarding Two Embedment Plates for V. C. Summer Unit 3 AP1000 Project05/08/2017ML17138A206
2017-13-00WECTEC LLCInterim Part 21 Report Regarding Two Embedment Plates for V. C. Summer Unit 3 AP1000 Project02/16/2017ML17068A125
2017-12-00Continental Disc CorporationPotential Safety Hazard Regarding Installation Torque Instructions for Rupture Discs and Associated Holders02/21/2017ML17056B885
2017-11-00United Controls InternationalPart 21 Notification for P/N: 005650-01 Terminal Boxes Supplied by United Controls International02/24/2017ML17075A277
2017-10-01WECTEC LLCClosure of Interim Report Regarding Pressurizer Upper Support Ring Girder Strut Lugs Test Coupon Nonconformance for AP1000 Projects07/05/2017ML17193A203
2017-10-00WECTEC LLCInterim Report Regarding Pressurizer Upper Support Ring Girder Strut Lugs Test Coupon Nonconformance for AP1000 Projects01/26/2017ML17047A213
2017-09-01CB&I AREVA MOX ServicesUpdated Interim Report Regarding Sintering Furnace Nozzles and Cooling Channel Compliance with ASME Section VIII06/28/2017ML17179A038
2017-09-00CB&I AREVA MOX ServicesInterim Report Regarding Sintering Furnace Nozzles and Cooling Channel Compliance with ASME Section VIII02/09/2017ML17040A098
2017-08-00Emerson – Fisher Controls InternationalValve Assembly Nonconformance02/08/2017ML17040A424
2017-07-01WECTEC LLCClosure of Interim Report Regarding a Piping Spool Weld Nonconformance for Vogtle Unit 3 AP1000 Project03/02/2017ML17072A050
2017-07-00WECTEC LLCInterim Report Regarding a Piping Spool Weld Nonconformance for Vogtle Unit 3 AP1000 Project01/05/2017ML17026A142
2017-06-01C&D TechnologiesRetraction of Interim Report Regarding Battery Jar Dedication Sampling03/20/2017ML17081A453
2017-06-00C&D TechnologiesInterim Report Regarding Battery Jar Dedication Sampling01/20/2017ML17026A414
2017-05-01Xcel Energy / MonticelloFollow-up to Interim Report of a Deviation or Failure to Comply Related to a Bench Test Failure of a Commercially Dedicated Contactor03/02/2017ML17061A581
2017-05-00Xcel Energy / MonticelloInterim Report of a Deviation or Failure to Comply Related to a Bench Test Failure of a Commercially Dedicated Contactor01/17/2017ML17017A501
2017-04-01Curtiss-Wright Electro-Mechanical CorporationClosure of the Potential Substantial Safety Hazard Exists in the Casing for the AP 1000 Reactor Coolant Pump (RCP)06/29/2017ML17188A421
2017-04-00Curtiss-Wright Electro-Mechanical CorporationPotential Substantial Safety Hazard Exists in the Casing for the AP 1000 Reactor Coolant Pump (RCP)01/13/2017ML17019A389
2017-03-01FitzpatrickRetraction of Interim Report Related to the Failure of Foxboro Power Supplies to Meet Voltage Stability Specifications03/23/2017ML17086A022
2017-03-00FitzpatrickInterim Report Related to the Failure of Foxboro Power Supplies to Meet Voltage Stability Specifications01/10/2017ML17026A413
2017-02-00Engine Systems, Inc.Seizure of Fuel Injector on Emergency Diesel Generator01/06/2017ML17019A351
2017-01-02Bellefonte Unit 2Containment Vertical Tendon (V281) Failure – A 50.55(e) Third Interim Report.10/30/2017ML17303A875
2017-01-01Bellefonte Unit 2Containment Vertical Tendon (V281) Failure – A 50.55(e) Second Interim Report06/07/2017ML17158B336
2017-01-00Bellefonte Unit 2Containment Vertical Tendon (V281) Failure – A 50.55(e) First Interim Report01/06/2017ML17006A212

 

 

 