Document Number |
Description |
Date |
SECY-12-0167 |
Closure of Petition for Rulemaking to Require Installation of Radiation Alarms for Rooms Housing Neutron Sources (Prm-73-15) |
01/11/2013 |
SECY-12-0166 |
Proposed Rule: Revisions to Transportation Safety Requirements and Harmonization with International Atomic Energy Agency Transportation Requirements (RIN 3150-AI11) |
02/15/2013 |
SECY-12-0160 |
Proposed Rule: Petition for Rulemaking Process (Rin 3150-AI30); Expanded Authority of Executive Director for Operations to Deny Petitions for Rulemaking Under Management Directive 6.3 |
03/22/2013 |
SECY-12-0157 |
Consideration of Additional Requirements for Containment Venting Systems for Boiling Water Reactors with Mark I and Mark II Containments |
03/19/2013 |
SECY-12-0145 |
Denial Of Petition For Rulemaking (Prm-70-9) – American Physical Society |
05/22/2013 |
SECY-12-0137 |
Implementation of the Cumulative Effects of Regulation Process Changes |
03/12/2013 |
SECY-12-0125 |
Interim Actions to Execute Commission Preemption Authority Under Section 161a of the Atomic Energy Act of 1954, as Amended |
11/21/2012 |
SECY-12-0118 |
Resource Estimates and Request for Final Rule Schedule Extension and Delegation of Signature Authority for the Enhanced Weapons Rulemaking |
10/31/2012 |
SECY-12-0112 |
Policy Statements on Agreement State Programs |
01/09/2013 |
SECY-12-0110 |
Consideration of Economic Consequences Within the U.S. Nuclear Regulatory Commission’s Regulatory Framework |
03/20/2013 |
SECY-12-0099 |
Final Rule: Distribution of Source Material to Exempt Persons and to General Licensees and Revision of General License and Exemptions (RIN 3150-AH15) |
10/23/2012 |
SECY-12-0097 |
Entergy Operations, Inc.’s Request to Relocate the River Bend Station Backup Emergency Operations Facility |
08/20/2012 |
SECY-12-0093 |
Closure Options for Generic Safety Issue - 191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance |
12/14/2012 |
SECY-12-0092 |
State-of-the-Art Reactor Consequence Analyses - Recommendation for Limited Additional Analysis |
12/06/2012 |
SECY-12-0091 |
Completeness and Quality of Integrated Safety Analyses |
10/09/2012 |
SECY-12-0081 |
Risk-Informed Regulatory Framework for New Reactors |
10/22/2012 |
SECY-12-0079 |
Partial Closure of Petition for Rulemaking (PRM-72-6) C-10 Research and Education Foundation, Inc. |
09/07/2012 |
SECY-12-0076 |
Plan for Retrospective Analysis of Existing Rules |
08/15/2012 |
SECY-12-0071 |
Final Rule: Domestic Licensing of Source Material - Amendments/Integrated Safety Analysis (RIN 3150-AI50) |
05/03/2013 |
SECY-12-0069 |
Process for Addressing Late-Breaking Issues During a Combined License Application Review |
06/25/2012 |
SECY-12-0066 |
Criminal Penalties for the Unauthorized Introduction of Weapons into Facilities Designated by the U.S. Nuclear Regulatory Commission and for Sabotage of Nuclear Facilities or Fuel |
06/18/2012 |
SECY-12-0064 |
Recommendations for Policy and Technical Direction to Revise Radiation Protection Regulations and Guidance |
12/17/2012 |
SECY-12-0063 |
Final Rule: Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating Licenses (10 CFR Part 51; RIN 3150–AI42) |
12/06/2012 |
SECY-12-0062 |
Renewal of Full-Power Operating License for Pilgrim Nuclear Power Station |
05/25/2012 |
SECY-12-0060 |
Proposed Changes to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Associated with Buried Piping |
06/13/2012 |
SECY-12-0053 |
Recommendations on Regulatory Changes for Permanent Implant Brachytherapy Programs |
08/13/2012 |
SECY-12-0047 |
Revisions to the Nuclear Regulatory Commission Enforcement Policy |
11/28/2012 |
SECY-12-0046 |
Options for Revising the Regulatory Approach to Ground Water Protection |
05/24/2012 |
SECY-12-0042 |
Colorado Alternative Standards; Implementation of the Alternative Standards Provision in Section 274o of the Atomic Energy Act of 1954, As Amended |
05/18/2012 |
SECY-12-0034 |
Proposed Rulemaking - 10 CFR 50.46c: Emergency Core Cooling System Performance During Loss-Of-Coolant Accidents (RIN 3150-AH42) |
01/07/2013 |
SECY-12-0032 |
Report to Congress on Abnormal Occurrences: Fiscal Year 2011 |
04/11/2012 |
SECY-12-0030 |
Final Rule: Requirements for Maintenance of Inspections, Tests, Analyses, and Acceptance Criteria (RIN 3150-AI77) |
05/11/2012 |
SECY-12-0027 |
Preemption Authority Pursuant to Section 161A, "Use of Firearms by Security Personnel," of the Atomic Energy Act of 1954, as Amended |
05/03/2012 |
SECY-12-0025 |
Proposed Orders and Requests for Information in Response to Lessons Learned from Japan's March 11, 2011, Great Tohoku Earthquake and Tsunami |
03/09/2012 |
SECY-12-0019 |
Denial of Petition for Rulemaking Requesting Amendments to 10 CFR Part 54 Regarding License Renewal Applications Submitted 20 Years Before Expiration of the Operating License (PRM-54-6) |
04/16/2012 |
SECY-12-0011 |
Data Collection Regarding Patient Release |
04/09/2012 |
SECY-12-0010 |
Engagement of Stakeholders Regarding the Events in Japan |
03/21/2012 |
SECY-12-0009 |
Final Rule: 10 CFR 73.37, "Physical Protection of Irradiated Fuel in Transit” (RIN 3150-AI64) |
06/07/2012 |
SECY-12-0008 |
Implementation Plan for the Safety Culture Policy Statement |
03/01/2012 |
SECY-12-0004 |
Final Rule – 10 CFR Parts 2, 12, 51, 54, and 61 "Amendments to Adjudicatory Process Rules and Related Requirements" (RIN 3150-AI43) |
06/29/2012 |
SECY-12-0003 |
Draft Final Policy Statement on Volume Reduction and Low-Level Radioactive Waste Management |
03/19/2012 |