Date |
Description |
12/14/10 - 12/15/10 |
Notice of Forthcoming Public & Closed Meetings with Mitsubishi Heavy Industries to Discuss Chapter 16 Design Control Document for United States - Advanced Pressurized Water Reactor Design.
|
12/10/10 |
Notice of Forthcoming Public & Closed Meetings with Mitsubishi Heavy Industries to Discuss Digital Instrumentation and Controls Review and Path Forward for United States - Advanced Pressurized Water Reactor Design.
|
11/03/10 |
Notice of Forthcoming United States - Advanced Pressurized Water Reactor Design Center Working Group Public and Closed Meeting with Mitsubishi Heavy Industries, LTD., Luminant Generation Company, LLC, and Dominion Virginia Power to Discuss Inspections, Tests, Analysis and Acceptance Criteria, Conceptual Design Interface, and Risk Managed Technical Specifications for the United States - Advanced Pressurizer Water Reactor Design
|
11/02/10 |
Notice of Forthcoming Public and Closed Meeting with Mitsubishi Heavy Industries, LTD. to Discuss the United States - Advanced Pressurized Water Reactor Chapter 10 Design Control Document
|
10/20/10 |
Notice of Forthcoming Public Teleconference Call with Mitsubishi Heavy Industries, LTD. to Discuss the United States - Advanced Pressurized Water Reactor Request for Additional Information 590-4753, Rev. 0, Response to the NRC staff Open Items for Standard Review Plan Section 16, "Technical Specifications"
|
10/04/10 |
Notice Of Forthcoming Public Follow-Up Teleconference Call With Mitsubishi Heavy Industries, Ltd. To Discuss United States - Advanced Pressurized Water Reactor Request For Additional Information 598-4754, Revision 2, Response To Standard Review Plan Section 10.2, "Turbine Generator"
|
09/30/10 |
Notice of Meeting With Mitsubishi Heavy Industries, Ltd., to Discuss United States - Advanced Pressurized Water Reactor Digital Instrumentation and Controls Review And Path Forward.
|
08/31/10 |
Notice of Forthcoming Conference Call With Mitsubishi Heavy Industries, LTD. to Discuss the United States - Advanced Pressurized Water Reactor Request for Additional Information 598-4754, Revision 2.
|
08/18/10 - 08/19/10 |
Notice of Public Meeting with Mitsubishi Heavy Industries, Ltd., to Discuss Key Issues Associated with the United States - Advanced Pressurized Water Reactor Digital Instrumentation and Controls.
|
08/05/10 - 08/06/10 |
Notice of Forthcoming Public & Closed Meetings with Mitsubishi Heavy Industries to Discuss Design of Piping Systems & Components for United States - Advanced Pressurized Water Reactor Design.
|
07/28/10 - 07/29/10 |
Forthcoming meeting with Mitsubishi Heavy Industries, Ltd. (MHI) to discuss RAI responses for the US-APWR Topical Reports MUAP-07001, "The Advanced Accumulator" and MUAP-07011, "Large Break LOCA Code Applicability Report for US-APWR."
|
07/27/10 |
Notice of Meeting with United States -Advanced Pressurized Water Reactor Design -Centered Working Group (DCWG).
|
07/27/10 |
Notice of Meeting with Mitsubishi Heavy Industries, Ltd., to discuss Key Issues Associated with the United States - Advanced Pressurized water Reactor Digital Instrumentation and Controls
|
07/13/10 - 07/15/10 |
Notice of Public and Closed Meeting with Mitsubishi Heavy Industries, Ltd. To Discuss The Review Of The United States-Advanced Pressurized Water Reactor Probabilistic Risk Assessment And Severe Accident Evaluation.
|
07/13/10 - 07/14/10 |
Forthcoming meeting with Mitsubishi Heavy Industries, Ltd. (MHI) to discuss Open Items remaining from the NRC technical review of the non-loss-of-coolant accident Topical Report, MUAP-07010 and the MARVEL-M computer code.
|
04/07/10 - 04/09/10 |
Forthcoming meeting with Mitsubishi Heavy Industries, Ltd. (MHI) to discuss the impacts of the recent modification to the M-RELAP5 computer code to the US-APWR Design Control Document, associated Topical and Technical reports, and previous RAI responses.
|
03/18/10 |
Forthcoming Public Meeting with Mitsubishi Heavy Industries, Ltd. to Discuss Quality Assurance Issues, Hardware Lifecycle, and Recurring Hardware Dedication in the Safety Systems Digital Platform - Mitsubishi Electric Total Advanced Controller Topical Report
|
03/17/10 |
Forthcoming Public Meeting with Mitsubishi Heavy Industries, Ltd. to Discuss Chapter 18 of the US-APWR Gas Design Control Document
|
03/16/10 |
Forthcoming meeting with Mitsubishi Heavy Industries, Ltd. (MHI) to discuss information regarding Chapter 7 - Instrumentation and Controls, and Chapter 16 - the Technical Specifications associated with Instrumentation and Controls, as referenced in the US-APWR DCD.
|
02/03/10 |
Notice of Meeting with Mitsubishi Heavy Industries, to Discuss Safety Instrumentation & Controls & Safety Systems Digital Platform Meltac Topical Reports & US Advanced Pressurized Water Reactor Design Control Document Chapter 7.
|
12/08/09 |
Forthcoming public and closed meeting with Mitsubishi Heavy Industries, LTD. to discuss several Non-LOCA simulations utilizing the MARVEL-M computer code
|
11/16/09 |
Notice of Forthcoming Public and Closed Meeting with Mitsubishi Heavy Industries LTD to Discuss Chapter 3 of the United States - Advanced Pressurized Water Reactor Design Control Document
|
10/07/09 - 10/08/09 |
Forthcoming Meeting with Mitsubishi Heavy Industries, Ltd. to discuss the Review Changes and Requests for additional information for the US-APWR DCD Chapter 7 and Safety System Digital Platform - MELTAC Topical Reports
|
09/28/09 |
Forthcoming Public Meeting with Mitsubishi Heavy Industries, Ltd. to Discuss the US-APWR Technical Report, Qualification and Test Plan of Class 1E Gas Turbine Generator
|
08/06/09 |
Forthcoming Public Meeting with Mitsubishi Heavy Industries, Ltd. to Discuss the US-APWR Gas Turbine Generator Testing and Diversity as an Alternate AC Power Source
|
07/16/09 |
Forthcoming US-APWR Design Center Working Group (DCWG) Public Meeting with Mitsubishi Heavy Industries, Ltd., and Luminant Generation Company, LLC to discuss Combined License (COL) Holder Items
|
07/16/09 |
Forthcoming Public Meeting with Mitsubishi Heavy Industries, Ltd. to Discuss Revision 2 Modifications to the US-APWR Design Control Document
|
05/18/09 |
Forthcoming US-APWR Design Center Working Group Meeting with Mitsubishi Heavy Industries, Ltd., and Luminant Generation Company, LLC to discuss US-APWR Chapter 11 (Radioactive Waste Management Systems) Request for Additional Information
|
04/22/09 |
Forthcoming Meeting With Mitsubishi Heavy Industries, Ltd., Regarding Us-apwr Accident Analyses Topical Reports - Computer Codes And Confirmatory Analyses
|
04/14/09 - 04/15/09 |
Upcoming Meeting with Mitsubishi Heavy Industries to Discuss Level 1 PRA Internal/External Issues, Instrumentation and Control and Shutdown
|
04/13/09 |
Public Forthcoming Meeting with Mitsubishi Heavy Industries to Discuss US-APWR Gas Turbine Generator Reliability and Diversity as an Alternate AC Power Source
|
02/17/09 - 02/19/09 |
Public Meeting Regarding USAPWR Design Control Document, Chapter 19, Probabilistic Risk Assessment (Level 2 and Low Power Shutdown) and Severe Accident Evaluation
|
01/22/09 - 01/23/09 |
Public Meeting Regarding US-APWR Design Control Document, Ch 7 Draft Requests for Additional Information (RAI's) and Safety Instrumentation and Control (I&C) and Safety System Digital Platform - MELTAC Topical Reports RAI Applicant Responses
|
06/25/08 |
Public Meeting Regarding US-APWR Design Control Document revision 1, Chapter 3 Piping, Components and Systems, and In-Service Testing
|
04/18/08 |
Public Meeting Regarding the Gas Turbine Generator for the US-APWR Design Certification Application
|
04/15/08 |
Public Meeting Regarding on US-APWR Updated Design Certification Scheduling Information
|
03/25/08 |
Public Meeting Regarding US-APWR Design Certification Review Schedule
|
01/15/08
01/16/08 |
Public Meeting Regarding US-APWR Design Certification Orientation
|