2025 Inspection Reports
The purpose of inspection reports is to document the inspection scope, observation, and findings of inspections conducted by the NRC. The NRC performs inspections to oversee the commercial nuclear industry to determine whether its requirements are being met by licensees and their contractors. The NRC performs inspections to verify the quality and suitability of vendor products, licensee-vendor interface, and review of equipment problems found during operation and their corrective action.
For inspections and related vendor inspections conducted by Region II for the Mixed Oxide Fuel Fabrication Facility, please reference the Meetings About Mixed Oxide Fuel page.
Prior to December 1999, the NRC issued NUREG-0040, "Licensee Contractor and Vendor Inspection Status Report," (The White Book) to document the results of inspections performed by the NRC's Quality Assurance, Vendor Inspection, Maintenance and Allegations Branch that were distributed to the inspected organizations. As of November 1999, these inspection reports are available electronically in the NRC's record retrieval system, ADAMS. The following inspections have been conducted since May 2005:
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Inspection
Report Date |
Description |
TBD |
Sargent & Lundy, LLC, Chicago, IL, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, as they pertain to activities conducted at the facility related to the supply of safety-related services for NRC’s regulated facilities.
|
TBD |
Westinghouse Electric Company, Cranberry Township, PA, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, as they pertain to activities conducted at the facility related to the supply of the Limerick Generating Station (LGS)’s digital plant protection system (PPS) for NRC’s regulated facilities.
|
TBD |
GE Hitachi Nuclear Energy, Wilmington, NC, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, as they pertain to activities conducted at the facility related to the supply of safety-related and balance-of-plant equipment and services e.g., commercial-grade dedication of electrical and mechanical components, engineering services, etc.) for NRC’s regulated facilities.
|
TBD |
Element Materials Technology, Huntsville, AL, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to safety-related testing activities conducted for NRC’s regulated facilities.
|
TBD |
Operation Technology, Incorporated, Irvine, CA, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, as they pertain to activities conducted at your facility related to the manufacture and testing of radiation monitoring equipment and in-core radiation detectors and instrumentation for NRC’s regulated facilities
|
05/23/2025 |
Flowserve Corporation Pump Division, Vernon, CA, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, as they pertain activities conducted at their facility related to the supply of ASME and non ASME safety-related pumps and replacement parts and/or appurtenances for NRC’s regulated facilities.
|
04/07/2025 |
Southwest Research Institute, San Antonio, TX, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, as they pertain to activities conducted at their facility related to the supply of testing and analysis services of safety-related components for NRC’s regulated facilities.
|
03/14/2025 |
Analysis & Measurement Services Corporation, Knoxville, TN, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, as they pertain to activities conducted at your facility related to the manufacture and testing of radiation monitoring equipment and in-core radiation detectors and instrumentation for NRC’s regulated facilities.
|
02/14/2025 |
Framatome Inc., Lynchburg, VA, to review implementation of Safeguards Information (SGI) Protection Program in accordance with Part 73 related to new reactor designs.
|