The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

2024 Inspection Reports

The purpose of inspection reports is to document the inspection scope, observation, and findings of inspections conducted by the NRC. The NRC performs inspections to oversee the commercial nuclear industry to determine whether its requirements are being met by licensees and their contractors. The NRC performs inspections to verify the quality and suitability of vendor products, licensee-vendor interface, and review of equipment problems found during operation and their corrective action.

For inspections and related vendor inspections conducted by Region II for the Mixed Oxide Fuel Fabrication Facility, please reference the Meetings About Mixed Oxide Fuel page.

Prior to December 1999, the NRC issued NUREG-0040, "Licensee Contractor and Vendor Inspection Status Report," (The White Book) to document the results of inspections performed by the NRC's Quality Assurance, Vendor Inspection, Maintenance and Allegations Branch that were distributed to the inspected organizations. As of November 1999, these inspection reports are available electronically in the NRC's record retrieval system, ADAMS. The following inspections have been conducted since May 2005:

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Inspection
Report Date
Description
TDB Framatome Inc., Lynchburg, VA, to review implementation of Safeguards Information (SGI) Protection Program in accordance with Part 73 related to new reactor designs.
12/31/2024 Sulzer Pumps (US) Inc., Chattanooga, TN, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to activities conducted for NRC’s regulated facilities.
12/20/2024  United Controls International, Norcross, GA, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to activities conducted for NRC’s regulated facilities.
12/09/2024 Conval Inc., Enfield, CT, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to activities conducted for NRC’s regulated facilities.
11/08/2024 Framatome Fuel Fabrication, Richland, WA, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to activities conducted for NRC’s regulated facilities.
10/23/2024 Fisher Controls International, LLC, Marshalltown, IA, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to activities conducted for NRC’s regulated facilities.
10/08/2024
 
Analysis & Measurement Services Corporation, Knoxville, TN, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to activities conducted for NRC’s regulated facilities.
09/30/2024 Bentley Systems, Incorporated, San Diego, CA, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to activities conducted for NRC’s regulated facilities.
08/26/2024 Energy Steel and Supply Company, Rochester Hills, MI, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to activities conducted for NRC’s regulated facilities.
07/31/2024 Paragon Energy Solutions, LLC, Fort Worth, TX, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to activities conducted for NRC’s regulated facilities.
07/08/2024 Doosan Enerbility, Changwon, Gyeongnam, Korea, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to activities conducted for NRC’s regulated facilities.
06/28/2024 ASCO L.P., Aiken, SC, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to activities conducted for NRC’s regulated facilities.
06/18/2024 Westinghouse Electric Company (WEC), Cranberry Township, PA, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, as they pertain to activities conducted at their facility related to the design and engineering services of safety-related structures, systems and components for NRC’s regulated facilities.
05/15/2024 TE Connectivity, Fuquay-Varina, NC, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to activities conducted for NRC’s regulated facilities.
05/01/2024 Integrated Power Services, Shreveport, LA, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to activities conducted for NRC’s regulated facilities.
04/01/2024 Westinghouse Electric Company, Hopkins, SC, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to activities conducted for NRC’s regulated facilities.
03/14/2024 Consolidated Power Supply, Birmingham, AL, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to activities conducted for NRC’s regulated facilities.
03/11/2024 Hanna Cylinders, Pleasant Prairie, WI, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to activities conducted at their facility related to the quality activities associated with the design, fabrication, assembly, and testing of valves, actuators, actuator accessories, replacement parts and/or appurtenances being supplied to US Nuclear Power Plants.
03/08/2024 Korea Hydro & Nuclear Power Co,  Vienna, VA, to review implementation of Safeguards Information (SGI) Protection Program in accordance with Part 73 related to new reactor designs.