Power Reactor
Facility: Comanche Peak
RX Type: [1] W-4-LP,[2] W-4-LP
Emergency Class: Non Emergency
Event Text NOTICE OF MISSED 24-HOUR NOTIFICATION PER 10 CFR 26.719(b)(1)
The following information was provided by the licensee via email:
"On 07/05/2023, at 0130 hours, a security officer found a 1 ounce bottle of vanilla extract in the protected area. Alcohol was identifie...
UNITED STATES
NUCLEAR REGULATORY COMMISSION
WASH INGTON, D.C. 20555-0001
Summary of NRC’s Review of the Recent Security Issues at
the Shearon Harris Nuclear Plant
This refers to the Nuclear Regulatory Commission’s (NRC) recent review of security activities at
the ...
Power Reactor
Facility: South Texas
RX Type: [1] W-4-LP,[2] W-4-LP
Emergency Class: Non Emergency
Event Text EN Revision Imported Date: 7/6/2021
EN Revision Text: CONTROLLED SUBSTANCE DISCOVERED WITHIN THE PROTECTED AREA
"On July 03, 2021, at approximately 1011 CDT, a Security Force Supervisor at South Texas Project Electric Generating Station (STPEGS) was informed by a s...
| April | September |This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.SeptemberPNO-III-24-00209/18/2024Preliminary Results of Steam Generator Inspections at Palisades Nuclear PlantAprilPNO-III-24-00104/01/2024Brai...
Saint Lucie 2
Initiating Events
Mitigating Systems
Significance: Sep 29, 2001
Identified By: Licensee
Item Type: NCV NonCited Violation
Failure to Maintain Control of Fire Alarm Computer Design Features Required by the NRC Approved Fire Protection Program
Operating...
Saint Lucie 2
Initiating Events
Mitigating Systems
Significance: Dec 30, 2000
Identified By: Licensee
Item Type: NCV NonCited Violation
TS 6.2.2.a Minimum Shift Complement Not Maintained When NWE Relieved ANPS
Requirements of TS 6.2.2.a for minimum operating shift ...
UNITED STATES
NUCLEAR REGULATORY COMMISSION
OFFICE OF NUCLEAR REACTOR REGULATION
WASHINGTON, D.C. 20555
March 11, 1991
Informatio...
Power Reactor
Facility: Comanche Peak
RX Type: [1] W-4-LP,[2] W-4-LP
Emergency Class: Non Emergency
Event Text CONTROLLED SUBSTANCE FOUND IN PROTECTED AREA
The following information was provided by the licensee via email:
"On 11/03/2023 at 2231 CDT, a security officer found 2 bottles of vanilla extract in the protected area. One bottle was a 1.5 ounce size with a trace amou...
April 23, 2002
Mr. J. V. Parrish
Chief Executive Officer
Energy Northwest
P.O. Box 968; MD 1023
Richland, Washington 99352-0968
SUBJECT: COLUMBIA GENERATING STATION - INSPECTION REPORT 50-397/01-09
Dear Mr. Parrish:
On March 23, 2002, the NRC completed an inspection at ...
IN RESPONSE, PLEASE
REFER TO: M110208
February 18, 2011
MEMORANDUM TO: R. W. Borchardt
Executive Director for Operations
FROM: Richard J. Laufer, Acting Secretary /RA/
SUBJECT: STAFF REQUIREMENTS – BRIEFING ON THE
IMPLEMENTATION OF PART 26...
Report on Status of Public Petitions Under 10 CFR
2.206: June 30, 2001
June 18, 2001
MEMORANDUM TO: William D. Travers
Executive Director for Operations
FROM: Brian W. Sheron, Associate Director /RA/
for Project Licensing and Technical Analysis
Office of Nuclear Reactor R...
April 24, 1998EAs 97-351 & 97-422Mr. Harold W. Keiser Executive Vice President Nuclear Business Unit Public Service Electric and Gas Company Post Office Box 236 Hancocks Bridge, New Jersey 08038SUBJECT:NOTICE OF VIOLATION (NRC Office of Investigations Nos. 1-96-024 and 1-...
On this Page:Office of the Chief Information OfficerCyber and Information Security DivisionDivision of Resource Management and AdministrationData, Information Management, and Enterprise Governance DivisionIT Services Development and Operations DivisionOffice of the Chief Infor...
Saint Lucie 2
Initiating Events
Mitigating Systems
Significance: Sep 29, 2001
Identified By: Licensee
Item Type: NCV NonCited Violation
Failure to Maintain Control of Fire Alarm Computer Design Features Required by the NRC Approved Fire Protection Program
Operating...
1
SCHEDULING NOTE
Title: BRIEFING ON THE IMPLEMENTATION OF PART 26 (Public)
Purpose: To provide the Commission with a discussion of the implementation
and requested changes to 10 CFR Part 26, Subpart I.
Scheduled: February 8, 2011
9:00am
Duration:...
Instructions for Completing Nuclear Material Transaction Reports (DOE/NRC Forms 741 and 740M) Final Draft Date: April 1, 2017 Office of Nuclear Material Safety and Safeguards NUREG/BR-0006, Rev. 8 iii NUREG/BR-0006, Rev. 8 ABSTRACT U.S. Nuclear Regulator...
Enclosure 4 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 222 TO FACILITY OPERATING LICENSE NO. DPR-80 AMENDMENT NO. 224 TO FACILITY OPERATING LICENSE NO. DPR-82 AMENDMENT NO. 4 TO SPECIAL NUCLEAR MATERIALS LICENSE NO. SNM-2511 PAC...
NUREG/BR-0007Revision 5Instructions for thePreparation andDistribution of MaterialStatus Reports(DOE/NRC Forms 742 and 742C)Effective Date: October 1, 2003Issued by theU.S. Nuclear Regulatory CommissionOffice of Nuclear Security and Incident ResponseWashington, DC 20555-0001AV...
NUREG/BR-0007 Revision 3Instructions for the Preparation and Distribution of Material Status Reports (DOE/NRC Forms 742 and 742C) Effective Date: February 1, 2000Issued by the U.S. Nuclear Regulatory Commission Office of Nuclear Material Safety and Safeguards Washington, DC 20...
FirstEnergy Nuclear Operating Company PERRY NUCLEAR POWER PLANT UNIT 1 & 2 ACKNOWLEDGMENT OF RECEIPT Title Emergency Plan Implementing Instruction (EPI-Al ), Rev. 2 C-1 Control No. 60 Letter No./Date PY-CEI/NRR-2564L / April 27, 2001Signature Title Return to:Perry Nuclear Powe...
VNUREG/BR-0007Revision 6Instructions for thePreparation andDistribution of MaterialStatus Reports(DOE/NRC Forms 742 and 742C)Effective Date: April 1, 2008Draft Report for CommentIssued by theU.S. Nuclear Regulatory CommissionOffice of Nuclear Material Safety and SafeguardsWash...
0Kennecott Uranium CompanySweetwater Uranium ProjectSource Material License SUA-1350License Condition 12.3 - Required Reporting18 February 2010* Semiannual 10 CFR 40.65 Report- Airborne Effluents 2009" ALARA Audit 2009" Land Use Survey 2009, Corrective Action Program Review 20...
April 27, 2004MEMORANDUM TO: Ellis W. MerschoffChief Information OfficerFROM: Roy P. Zimmerman, Director /RA/Office of Nuclear Security and Incident ResponseSUBJECT: PROJECT MANAGEMENT PLAN FOR THE SECURE VIDEOTELECONFERENCING PROJECTThe Project Management Plan for Secure V...
ENTERGY NUCLEAR OPERATIONS, INC. JAMES A. FITZPATRICK NUCLEAR POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE OFFSITE NOTIFICATIONS EAP--1.1 REVISION 46REVIEWED BY: PLANT OPERATING REVIEW COMMITTEEMEETING NO. N/A DATE:APPROVED BY:DATE: // f z.RE SPO ILEPROCEDURE OWNEREFFECT...
19S09 .. 601,'4 Y5'"yLF CREEK /E /4vY Ma,,.rd -'NUCLEAR OPERATING CO100CM1ON AKI 9: 12Pr1Aen. Yan, Eet O e President and Chief Executive OfficerrRULVE & DiR. BRANCH US NRC December 30, 1999WM 99-0071Mr. David L. Meyer Chief, Rules and Directives Branch Division of Administrati...