(a) Design, construction, and alteration. New facilities shall be designed and constructed to be readily accessible to and usable by disabled persons. Alterations to existing facilities shall, to the maximum extent feasible, be designed and constructed to be readily accessible...
5/1/03 1
Bottom Mounted Instrument Guide Tube Condition
5/1/03 2
STP Participants
Tom Jordan VP, Engineering & Tech Services
Mark McBurnett Manager, Quality & Licensing
Steve Thomas Manager, Plant Design
Michael Lashley Test Engineering Supervisor
Bill Humble NSSS Super...
(a) Licensee schedule for completing inspections, tests, or analyses. The licensee shall submit to the NRC, no later than 1 year after issuance of the combined license or at the start of construction as defined at 10 CFR 50.10(a), whichever is later, its schedule for completin...
January 17, 2006Docket No. 03002578EA No. 05-214 License No. 29-13911-01Mr. Wayne Schiffner Chief Operating Officer South Jersey Healthcare 1505 W. Sherman Avenue Vineland, NJ 08360SUBJECT:NOTICE OF VIOLATIONDear Mr. Schiffner:This letter refers to the NRC inspection cond...
Campbell and Johnson Counties, WyomingDocket Number: 40-9067License: SUA-1597Licensee: Uranerz Energy CorporationFacility Type: In Situ Recovery (ISR)Site SummaryPending Licensing Actions: NoneFor additional detail, see the following related pages: Nichols Ranch Application D...
The U.S. Nuclear Regulatory Commission (NRC) regulates the construction and operation of new commercial nuclear power facilities. The NRC performs inspections and audits to oversee the commercial nuclear industry to determine whether its requirements are being met by licensees...
*Footnote (a) When an applicant has not supplied initially all of the technical information required to complete the application and support the issuance of a construction permit which approves all proposed design features, the Commission may issue a construction permit i...
(a) An application for amendment of a construction authorization shall be filed with the Commission fully describing any changes desired and following as far as applicable the format prescribed in § 60.21.(b) In determining whether an amendment of a construction authorization ...
The NRC assesses plant performance continuously, and communicates its assessment of plant performance in letters to licensees, typically semi-annually. The assessment letters also contain a summary of planned inspections. The assessment letters are available on the plant perfo...
The staff of the U.S. Nuclear Regulatory Commission (NRC) is currently performing a detailed review of the U.S. EPR design. The U.S. EPR is an evolutionary pressurized-water reactor (PWR), designed by AREVA NP, Inc. It is a four-loop plant with a rated thermal output of 4,500 ...
On this page:Process DescriptionOverviewBackgroundInputs to the Assessment ProcessNRC Response to Plant PerformanceConstruction Action Matrix DeviationsPlant Assessment & ResultsIndividual Plant Performance SummariesPerformance SummariesHistorical PerformanceProgram Evalua...
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information. Status UpdatesThis page lists, in chronological order, links to the status of the implementation of Project Aim. Starting in October 2016, the implement...
May 21, 2001EA-01-029Dr. B. Don Russell, Deputy Director
Texas Engineering Experiment Station/Texas A&M University System
1095 Nuclear Science Road
3575 TAMU
College Station, TX 77843-3575SUBJECT:NOTICE OF VIOLATION AND PROPOSED IMPOSITION OF CIVIL PENALTY- $2,400 AND ...
(a) In a construction authorization for a geologic repository operations area at the Yucca Mountain site, the Commission shall include any conditions it considers necessary to protect the health and safety of the public, the common defense and security, or environmental values...
(a) A construction authorization shall include such conditions as the Commission finds to be necessary to protect the health and safety of the public, the common defense and security, or environmental values.(b) The Commission will incorporate in the construction authorization...
(a) An application for amendment of a construction authorization must be filed with the Commission that fully describes any desired changes and follows, as far as applicable, the content requirements prescribed in § 63.21.(b) In determining whether an amendment of a constructi...
Project OverviewThe Idaho Nuclear Project involves deployment of a fission-based power plant. Initially, the plant will consist of one energy-generating unit comprising seven independent Aalo-1 nuclear microreactors (i.e., reactors and steam generators) operated through shared...
South Dakota is not an Agreement State. The State has jurisdiction over x-ray equipment, naturally occurring radioactive materials, and certain radioactive materials that are not produced in a reactor.The NRC's Regional Office in Arlington, Texas, (Region IV) is respo...
The State-of-the-Art Reactor Consequence Analyses (SOARCA) project incorporates the results of more than 25 years of research to analyze the realistic outcomes of postulated severe reactor accidents, even though it is considered highly unlikely that such accidents could occur....
On this page:Publication InformationAbstractDownload complete documentNUREG/CR-5117 (PDF - 12.92 MB)Publication InformationManuscript Completed: April 1990Date Published: May 1990Prepared by: R.J. Kurtz, R.A. Clark, E.R. Bradley, W.M. Bowen, P.G. Doctor, R.H. Ferris, F.A. Simo...
1.0 General Site InformationSite Location:Karnes County near Falls City, TXAgreement State License Number:R-01634Agreement State Contact:Hans Weger512-239-6564NRC Agreement State Site Monitor:Duncan WhiteDuncan.White@nrc.govNRC Site Monitor:Martha Poston-BrownMartha.Poston-Bro...
Project Target DatesFinal Safety Evaluation target issuance – 9/30/2024Request for Additional Information Extension Request (1/29/2024)Request for Additional Information Extension Request (2/29/2024)Request for Additional Information Extension Request for Question No. 2...
This page lists, in chronological order, the material, such as slides, transcripts, and background material, supporting public meetings held on Project Aim.This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.DateDesc...
October 12, 2000Dr. William D. Travers Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001Dear Dr. Travers:SUBJECT:PRESSURIZED THERMAL SHOCK TECHNICAL BASIS REEVALUATION PROJECTDuring the 476th meeting of the Advisory Committee on ...
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.While the NRC may license accident tolerant fuels (ATF), including, higher burnup and increased enrichment fuels, under the current regulatory structure, the staff ...