Date |
Subject |
Other Correspondence |
02/14/23 |
Vogtle Electric Generating Plant, Unit 3 – Integrated Inspection Report 05200025/2022007 |
N/A |
02/09/23 |
Vogtle Electric Generating Plant, Unit 4 – NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2022008 |
N/A |
02/09/23 |
Vogtle Electric Generating Plant, Unit 3 – NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200025/2022008 |
N/A |
02/07/23 |
Vogtle Electric Generating Plant, Unit 4 – NRC Integrated Inspection Report 05200026/2022007 |
N/A |
11/14/22 |
Vogtle Electric Generating Plant, Unit 3 – Integrated Inspection Report 05200025/2022010 |
N/A |
11/10/22 |
Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Reports 05200025/2022005, 05200026/2022005 |
N/A |
11/08/22 |
Vogtle Electric Generating Plant, Unit 3 – NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200025/2022011 |
N/A |
11/08/22 |
Vogtle Electric Generating Plant, Unit 4 - NRC Initial Test Program And Operational Programs Integrated Inspection Report 05200026/2022006 |
N/A |
08/22/22 |
Vogtle Electric Generating Plant, Unit 3 - NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200025/2022006 |
N/A |
07/13/22 |
Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Reports 05200025/2022003, 05200026/2022003 and Second Quarter Assessment Follow-Up Letter |
N/A |
07/12/22 |
Vogtle Electric Generating Plant, Units 3 and 4 – NRC Initial Test Program and Operational Programs Integrated Inspection Reports 05200025/2022004, 05200026/2022004 |
N/A |
05/11/22 |
Vogtle Electric Generating Plant, Units 3 & 4 - Integrated Inspection Reports 05200025/2022001, 05200026/2022001 |
N/A |
04/19/22 |
Vogtle Electric Generating Plant, Unit 3 – Supplemental Inspection Report 05200025/2022010 and Assessment Follow-Up Letter |
N/A |
04/01/22 |
Vogtle Electric Generating Plant, Units 3 And 4 – NRC Initial Test Program and Operational Programs Integrated Inspection Reports 05200025/2022002, 05200026/2022002 |
N/A |
02/11/22 |
Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Reports 05200025/2021007, 05200026/2021007 |
N/A |
02/10/22 |
Vogtle Electric Generating Plant, Units 3 and 4 – NRC Initial Test Program and Operational Programs Integrated Inspection Reports 05200025/2021008, 05200026/2021008 |
N/A |
11/17/21 |
Vogtle Electric Generating Plant, Units 3 Final Significance Determination of a Preliminary White Finding, A Preliminary Greater Than Green Finding, Notice of Violation, and Assessment Follow-Up Letter; NRC Special Inspection Report 05200025/2021011 |
N/A |
11/12/21 |
Vogtle Electric Generating Plant, Units 3 and 4 – NRC Initial Test Program and Operational Programs Integrated Inspection Reports 05200025/2021005, 05200026/2021005 |
N/A |
11/10/21 |
Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Reports 05200025/2021006, 05200026/2021006 |
N/A |
08/26/21 |
Vogtle Electric Generating Plant, Units 3 And 4 - NRC Special Inspection Reports 05200025/2021010, 05200026/2021010 And – Preliminary White And Greater Than Green Findings For Unit 3 |
N/A |
08/12/21 |
Vogtle Electric Generating Plant, Units 3 and 4 – NRC Initial Test Program and Operational Programs Integrated Inspection Reports 05200025/2021004, 05200026/2021004 |
N/A |
08/06/21 |
Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Reports 05200025/2021003, 05200026/2021003 |
N/A |
05/13/21 |
Vogtle Electric Generating Plant, Units 3 and 4 – NRC Initial Test Program and Operational Programs Integrated Inspection Reports 05200025/2021002, 05200026/2021002 |
N/A |
05/13/21 |
Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Reports 05200025/2021001, and 05200026/2021001 |
N/A |
02/10/21 |
Vogtle Electric Generating Plant, Units 3 and 4 – NRC Initial Test Program and Operational Programs Integrated Inspection Reports 05200025/2020010, 05200026/2020010 |
N/A |
02/10/21 |
Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Reports 05200025/2020004, and 05200026/2020004 |
N/A |
01/25/21 |
Vogtle Electric Generating Plant, Units 3 and 4 – NRC Confirmatory Follow-Up and Safety Conscious Work Environment Inspection Reports 05200025/20200012, and 05200026/2020012 |
N/A |
12/10/20 |
Vogtle Electric Generating Plant, Unit 3 – Withdrawal of Non-Cited Violation 05200025/2016004-02, Failure to Qualify WPS in Accordance with Applicable Code |
N/A |
11/18/20 |
Vogtle Electric Generating Plant, Unit 3 – NRC Initial Cyber Security Inspection for Construction 05200025/2020401 |
N/A |
11/10/20 |
Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Reports 05200025/2020003, and 05200026/2020003 |
N/A |
11/10/20 |
Vogtle Electric Generating Plant, Units 3 and 4 – NRC Initial Test Program and Operational Programs Integrated Inspection Reports 05200025/2020009, 05200026/2020009 |
N/A |
08/12/20 |
Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Reports 05200025/2020002, and 05200026/2020002 |
N/A |
08/11/20 |
Vogtle Electric Generating Plant, Units 3 and 4 – NRC Initial Test Program and Operational Programs Integrated Inspection Reports 05200025/2020008, 05200026/2020008 |
N/A |
07/15/20 |
Vogtle Electric Generating Plant, Unit 3 – NRC Integrated Inspection Report 05200025/2019010 |
N/A |
05/07/20 |
Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Reports 05200025/2020001, and 05200026/2020001 |
N/A |
04/23/20 |
Vogtle Electric Generating Plant, Units 3 and 4 – NRC Initial Test Program And Operational Programs Integrated Inspection Reports 05200025/2020007, and 05200026/2020007 |
N/A |
02/11/20 |
Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Reports 05200025/2019004, and 05200026/2019004 |
N/A |
11/13/19 |
Vogtle Electric Generating Plant Units 3 and 4 U.S. Nuclear Regulatory Commission Security Baseline Inspection Report 05200025/2019402 and 05200026/2019402 |
N/A |
11/04/19 |
Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Reports 05200025/2019003 and 05200026/2019003 |
N/A |
08/08/19 |
Vogtle Electric Generating Plant, Units 3 & 4, NRC Security Baseline Inspection Report 05200025/2019401 and 05200026/2019401 |
N/A |
08/07/19 |
Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Report 05200025/2019002, and 05200026/2019002 |
N/A |
05/15/19 |
Vogtle Electric Generating Plant, Units 3 and 4 – NRC integrated Inspection Reports 05200025/2019001, 05200026/2019001 |
N/A |
02/14/19 |
Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Reports 05200025/2018004, 05200026/2018004 |
N/A |
01/31/19 |
Southern Nuclear Operating Company Vogtle Electric Generating Plant, Units 3 and 4 – U.S. Nuclear Regulatory Commission Security Baseline Inspection Report 05200025/2018413 and 05200026/2018413 (OUO Removed) |
N/A |
11/13/18 |
Vogtle, Units 3 and 4; NRC Integrated Inspection Reports 05200025/2018003, 05200026/2018003 |
N/A |
10/26/18 |
Southern Nuclear Operating Company Vogtle Electric Generating Plant, Units 3 ∓ 4 – U.S. Nuclear Regulatory Commission Security Integrated Inspection Report 05200025/2018412 and 05200026/2018412 (OUO Removed) |
N/A |
10/03/18 |
NRC Program Inspection for Corrective Action Program Implementation Inspection |
N/A |
08/14/18 |
Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Reports 05200025/2018002 |
N/A |
08/13/18 |
Vogtle Electric Generating Plant Units 3 and 4 – U.S. Nuclear Regulatory Commission Security Baseline Inspection Report 05200025/2018411 and 05200026/2018411 (OUO Removed) |
N/A |
05/14/18 |
Vogtle Electric Generating Plant, Units 3 And 4 – NRC Integrated Inspection Reports 05200025/2018001, 05200026/2018001 |
N/A |
05/09/18 |
Vogtle Electric Generating Plant Units 3 and 4 - NRC Security Inspection Reports 05200025/2018410, 05200026/2018410 (OUO REMOVED) |
N/A |
03/21/18 |
Vogtle Electric Generating Plant, Units 3 And 4 - NRC Inspection of Preoperational Factory Acceptance Testing, Reports 05200025/2017010, 05200026/2017010 |
N/A |
04/04/18 |
Errata For Vogtle Unit 3 Combined License, Vogtle Unit 4 Combined License NRC Integrated Reports 05200025/2017004, 05200026/2017004 |
N/A |
02/14/18 |
Vogtle Electric Generating Plant, Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2017004, 05200026/2017004 |
N/A |
02/08/18 |
Vogtle Electric Generating Plant Units 3 and 4 - NRC Security Inspection Reports 05200025/2017404, 05200026/2017404 (OUO REMOVED) |
N/A |
11/09/17 |
Vogtle Electric Generating Plant Units 3 And 4 - NRC Security Inspection Reports 05200025/2017403, 05200026/2017403 (OUO Removed) |
N/A |
11/09/17 |
Vogtle Electric Generating Plant, Units 3 And 4 - NRC Integrated Inspection Reports 05200025/2017003, 05200026/2017003 |
N/A |
09/20/17 |
Vogtle Unit 3 Combined License, Vogtle Unit 4 Combined License - NRC Integrated Inspection Reports 05200025/2017007, 05200026/2017007 |
N/A |
08/10/17 |
Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2017002, 05200026/2017002 |
N/A |
05/12/17 |
Vogtle Electric Generating Units 3 and 4 - NRC Integrated Inspection Reports 5200025/2017001, 05200026/2017001 |
N/A |
05/12/17 |
Vogtle Electric Generating Units 3 and 4 - NRC Security Inspection Reports 05200025/2017401, 05200026/2017401 and Notice of Violation (OUO REMOVED) |
N/A |
03/14/17 |
Vogtle Electric Generating Units 3 and 4 - NRC Inspection of the Preoperational Initial Test Program, Reports 05200025/2017006, 05200026/201700 |
N/A |
02/14/17 |
Vogtle Electric Generating Units 3 and 4 - NRC Security Inspection, Reports 05200025/2016404, 05200026/2016404 |
N/A |
01/31/18 |
Errata For Vogtle Unit 3 Combined License, Vogtle Unit 4 Combined License NRC Integrated Reports 05200025/2016004, 05200026/2016004 |
N/A |
02/13/17 |
Vogtle Electric Generating Plant, Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2016004, 05200026/2016004 |
N/A |
12/20/16 |
Vogtle Electric Generating Plant Units 3 and 4 - NRC Periodic Inspection of Quality Assurance Program, Reports 05200025/2016008, 05200026/2016008 |
N/A |
11/07/16 |
Vogtle Electric Generating Plant Units 3 And 4 - NRC Integrated Inspection Reports 05200025/2016003, 05200026/2016003 |
N/A |
10/26/16 |
Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 And 4 - U.S. Nuclear Regulatory Commission Security Baseline Inspection Report 05200025/2016403 and 05200026/2016403 |
N/A |
09/01/16 |
Vogtle, Unit 3 & 4 Combined License - NRC Program Inspection for Corrective Action Program Implementation Inspection, Reports 05200025/2016007, 05200026/2016007, July 18, 2016 through July 22, 2016 |
N/A |
07/28/16 |
Vogtle, Units 3 & 4 Combined License, NRC Integrated Inspection Report 05200025/2016002 and 05200026/2016002, April 1, 2016 through June 30, 2016 |
N/A |
12/19/17 |
Errata For Vogtle Unit 3 Combined License, Vogtle Unit 4 Combined License NRC Integrated Reports 05200025-2016001, 05200026-2016001 |
N/A |
05/10/16 |
Vogtle Electric Generating Plant, Units 3 and 4 NRC Integrated Inspection Reports 05200025/2016001, 05200026/2016001, January 1, 2016 through March 31, 2016 |
N/A |
01/29/16 |
Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2015004, and 05200026/2015004 |
N/A |
12/30/15 |
Vogtle Electric Generating Plant Units 3 and 4 - NRC Periodic Inspection of Quality Assurance Program Reports 05200025/2015008 and 05200026/2015008; 11/16/2015 - 11/19/2015 |
N/A |
10/28/15 |
Vogtle Electric Generating Plant Units 3 And 4 - NRC Integrated Inspection Reports 05200025/2015003, and 05200026/2015003 |
N/A |
08/11/15 |
Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2015002, and 05200026/2015002 |
N/A |
06/22/15 |
Vogtle Electric Generating Plant Units 3 and 4 - NRC Program Inspection for Management of Inspections, Tests, Analyses, and Acceptance Criteria and Corrective Action Program Implementation Inspection, Reports 05200025/2015007 and 05200026/2015007 |
N/A |
04/30/15 |
Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2015001 and 05200026/2015001 |
N/A |
04/25/15 |
Vogtle Electric Generating Plant Units 3 AND 4 - NRC Simulator Inspection Reports 05200025/2015301 and 05200026/2015301 |
N/A |
02/06/15 |
Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2014005 and 05200026/2014005 |
N/A |
11/07/14 |
Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2014004, 05200026/2014004; on 07/01/2014 through 09/30/2014 |
N/A |
10/30/14 |
Vogtle Unit 3 Combined License, Vogtle Unit 4 Combined License, Periodic Quality Assurance Inspection Reports 05200025/2014014, 05200026/2014014; on 10/06/2014 Through 10/10/2014 |
N/A |
08/06/14 |
Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2014-003, and 05200026/2014-003 |
N/A |
04/22/14 |
Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2014-002, and 05200026/2014-002 |
N/A |
03/28/14 |
Vogtle Electric Generating Plant Units 3 and 4 - NRC Program Inspection for Management of Inspections, Tests, Analyses, and Acceptance Criteria and Corrective Action Program, Reports 05200025/2014-008 and 05200026/2014-008 |
N/A |
01/24/14 |
Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2013-005 and 05200026/2013-005 |
N/A |
12/10/13 |
Southern Nuclear Operating Company, Vogtle Electric Generating Plant Units 3 and 4 - NRC Periodic Inspection of Quality Assurance Program, Reports 05200025/2013-009 and 05200026/2013-009 |
N/A |
11/07/13 |
Vogtle, Unit 3 & 4, Routine Integrated Inspection Report, IR 05200025-13-004, 05200026-13-004; 07/01/2013 through 09/30/2013 |
N/A |
07/26/13 |
Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2013-003 and 05200026/2013-003 |
N/A |
07/23/13 |
Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Periodic Inspection of Quality Assurance Program, Reports 05200025/2013-008 and 05200026/2013-008 |
N/A |
05/07/13 |
Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2013-002 and 05200026/2013-002 |
N/A |
09/20/16 |
Errata For Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Inspection Of Corrective Action Program, Report 05200025/2013-007, 05200026/2013-007 and Notice of Violation |
N/A |
03/12/13 |
Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Inspection of Corrective Action Program, Reports 05200025/2013-007, 05200026/2013-007 and Notice of Violation |
Licensee Response
NRC Acknowledgement |
01/30/13 |
Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2012-005 and 05200026/2012-005 (EA-12-230) |
N/A |
11/14/12 |
Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2012-004, 05200026/2012-004, and Notice of Violation |
Licensee Response
NRC Acknowledgement |
08/07/12 |
Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2012-003, 05200026/2012-003 |
N/A |
06/19/12 |
Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC ITAAC Inspection - Inspection Reports 05200025/2012-009, 05200026/2012-009, and Notice of Violation |
Licensee Response
NRC Acknowledgement |
06/19/12 |
Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Inspection of Corrective Action Program, Reports 05200025/2012-006, 05200026/2012-006, and Notice of Violation |
Licensee Response
Licensee Response
NRC Acknowledgement |
05/18/12 |
Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 - NRC ITAAC Inspection Report No. 05200025/2012-008 and Notice of Violation |
Licensee Response
NRC Acknowledgement
Licensee Response
NRC Acknowledgement |
08/14/13
05/11/12 |
Errata - Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2012-002 and 05200026/2012-002
Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2012-002, 05200026/2012-002 |
N/A |
02/14/12 |
Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200011/2011-004, 05200025/2011-006, 05200026/2011-004 |
N/A |
11/09/11 |
Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200011/2011-003, 05200025/2011-005, 05200026/2011-003 |
N/A |
09/16/11 |
Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Inspection Report 05200011/2011-009 and Notice of Violation |
Applicant Response
NRC Acknowledgement |
08/24/11 |
Vogtle Electric Generating Plant Unit 3 - NRC Inspection Report No. 05200025/2011-007; Equipment qualification activities at Wyle Laboratories' testing facility |
N/A |
08/11/11 |
Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200011/2011-002, 05200025/2011-004, 05200026/2011-002 |
N/A |
08/03/11 |
Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Inspection Report 05200011/2011-007; Quality Assurance program |
N/A |
05/09/11 |
Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Report 05200011/2011001, 05200025/2011002, 05200026/2011001 |
N/A |
02/14/11 |
Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Report 05200011/2010-008; 05200025/2010-002; 05200026/2010-001 and Notice Of Violation |
Applicant Response
NRC Acknowledgment |
12/22/10 |
Vogtle Electric Generating Plant ESP Site - NRC Inspection Report 05200011/2010004; Quality Assurance Program |
N/A |
10/08/10 |
Southern Nuclear Operating Company Vogtle Electric Generating Plant ESP Site - NRC Integrated Inspection Report 05200011/2010-007 |
N/A |
10/07/10 |
Southern Nuclear Operating Company Vogtle Electric Generating Plant ESP Site - NRC Security Baseline Inspection Report 05200011/2010003 and Notice of Violation |
Non-Public |
06/17/10 |
Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Inspection Report 05200011/2010-002 |
N/A |
05/04/10 |
Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 - NRC Inspection Report 05200011/2010-001 |
N/A |
04/16/10 |
NRC Inspection Report Nos. 05200025/2009-201 and 05200026/2009-201 and Notice of Violation |
Applicant Response
NRC Acknowledgment |
12/16/09 |
Vogtle Electric Generating Plant - Security Inspection Report 05200011/2009001 |
N/A |