United States Nuclear Regulatory Commission - Protecting People and the Environment

Site Additions in 2019

On this page:

See also New on Our Site for current additions.

April

April 30, 2019

NUREG/CR-7103, Volume 4
Pacific Northwest National Laboratory Investigation of Stress Corrosion Cracking in Nickel-Base Alloys: Behavior of Alloy 152 And 52 Welds

April 18, 2019

NUREG/IA-0508
Validation of RELAP5/MOD3.3 Friction Loss and Heat Transfer Model for Narrow Rectangular Channels

April 16, 2019

NUREG-0713, Volume 39
Occupational Radiation Exposure at Commercial Nuclear Power Reactors and other Facilities 2017, Fiftieth Annual Report

NUREG/IA-0512
Simulation of ROSA-2 Test 3 Counterpart with TRACE5 – Application to Nuclear Power Plant

April 15, 2019

NUREG/IA-0505
Assessment of TRACE 5.0 Against ROSA-2 Test 5, Main Steam Line Break with Steam Generator Tube Rupture

April 4, 2019

NUREG-1437, Supplement 5, Second Renewal
Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4

April 3, 2019

NUREG-2226, Volumes 1 & 2
Environmental Impact Statement for an Early Site Permit (ESP) at the Clinch River Nuclear Site: Final Report

To top of page

March

March 26, 2019

NUREG/KM-0013
Credibility Assessment Framework for Critical Boiling Transition Models: A generic safety case to determine the credibility of critical heat flux and critical power models, Draft for Comment

NUREG-1556, Volume 13, Revision 2
Consolidated Guidance About Materials Licenses: Program-Specific Guidance About Commercial Radiopharmacy Licenses, Final Report

March 18, 2019

NUREG-1100, Volume 35
Congressional Budget Justification: Fiscal Year 2020

March 15, 2019

NUREG/BR-0117, No. 17-04
NMSS Quarterly Newsletters – Spring 2017

NUREG/IA-0502
Post-Test Analysis of Cold Leg Small Break 4.1% at PSB-VVER Facility using TRACE V5.0

NUREG/IA-0507
Natural Circulation (Interruption) Analysis with MELCOR 2.2 during Asymmetric Cooldown Transients

NUREG/IA-0504
Assessment of TRACE 5.0 Against ROSA-2 Test 3 Counterpart Test to PKL

March 14, 2019

NUREG/IA-0500
Post-Test Calculation of the ROSA-2 Test 3 Using RELAP5/MOD3.3

March 14, 2019

NUREG/IA-0501
Investigation of the Loop Seal Clearing Phenomena for the ATLAS DVI Line and Cold Leg SBLOCA Tests Using MARS-KS and RELAP5/MOD3.3

March 14, 2019

NUREG/IA-0511
Simulation of ROSA-2 Test-2 Experiment: Application to Nuclear Power Plant

March 14, 2019

NUREG/CR-7255
Seismic Isolation of Nuclear Power Plants using Elastomeric Bearings

March 14, 2019

NUREG/IA-0503
Post-Test Analysis of ROSA-2 Test 2 (IBLOCA) with TRACE

March 11, 2019

NUREG-1100, Volume 35
Congressional Budget Justification: Fiscal Year 2020 Summary

To top of page

February

February 28, 2019

NUREG/IA-0496
The Analysis and Study of ELAP Event and Mitigation Strategies Using TRACE Code for Maanshan PWR

NUREG/IA-0497
IBLOCA Analysis for Vandellòs-NPP Using RELAP5/MOD3.3. Sensitivity Calculations to EOP Actions

NUREG/IA-0499
Post-Test Calculation of the PKL-2 Test G7.1 Using RELAP5/MOD3.3

February 22, 2019

NUREG/CR-7253
Technical Considerations for Seismic Isolation of Nuclear Facilities

February 15, 2019

NUREG/IA-0491
Assessment of the Wall Film Condensation Model with Non-condensable Gas in RELAP5 and TRACE for Vertical Tube and Plate Geometries

February 14, 2019

NUREG-1830, Volume 15
Office of Investigations – Annual Report FY 2018

February 7, 2019

NUREG-1307, Revision 17
Report on Waste Burial Charges: Changes in Decommissioning Waste Disposal Costs at Low-Level Waste Burial Facilities, Final Report

NUREG/IA-0495
Assessment of NEPTUN Reflooding Experiments 5050 and 5052 with TRACE V5.0 Patch 5

February 6, 2019

NUREG/IA-0493
The Ultimate Response Guideline Simulation and Study for Lungmen (ABWR) Nuclear Power Plant Using RELAP5/SNAP

NUREG/KM-0011
Critical Heat Flux Data Used to Generate the 2006 Groeneveld Lookup Tables

NUREG-1885, Revision 11
Report to Congress on the Security Inspection Program for Commercial Power Reactors and Category I Fuel Cycle Facilities: Results and Status Update – Annual Report for Calendar Year 2017

To top of page

January

January 29, 2019

NUREG-1650, Revision 6, Supplement 1
Answers to Questions from the Peer Review by Contracting Parties on the United States of America Seventh National Report for the Convention on Nuclear Safety

January 28, 2019

NUREG/CR-7244
Response of Nuclear Power Plant Instrumentation Cables Exposed to Fire Conditions

NUREG/IA-0489
RELAP5 Model of a CANDU-6 (Embalse) Nuclear Power Plant: Application to a Turbine Trip Event

January 22, 2019

NUREG/IA-0488
Simulation of the LSTF-PKL Counterpart G7.1 Test at PKL Facility Using TRACE 5

January 18, 2019

NUREG/IA-0487
Simulation of the PKL-G7.1 Experiment in a Westinghouse Nuclear Power Plant Using RELAP5/Mod3.3

NUREG/IA-0506
Using SNAP/RADTRAD and HABIT to Establish the Analysis Methodology for Maanshan PWR

January 17, 2019

NUREG/CR-7249
Overview of Nuclear Data Uncertainty in Scale and Application to Light Water Reactor Uncertainty Analysis

January 10, 2019

NUREG/CR-7252
Validation of keff Calculations for Extended BWR Burnup Credit

To top of page

Page Last Reviewed/Updated Friday, June 07, 2019