The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Site Additions in 2021

On this page:

See also New on Our Site for current additions.

December 2021

Devember 23, 2021

NUREG/KM-0017
Seismic Hazard Evaluations for U.S. Nuclear Power Plants: Near-Term Task Force Recommendation 2.1 Results

Devember 17, 2021

NUREG/CR-7293
The Price-Anderson Act: 2021 Report to Congress, Public Liability Insurance and Indemnity Requirements for an Evolving Commercial Nuclear Industry Office

Devember 15, 2021

NUREG-2220, Volume 5
Fiscal Year 2021 – Agency Financial Report

Devember 2, 2021

NUREG-1415, Volume 35, No. 2
Office of the Inspector General Semiannual Report to Congress: April 1, 2021 – September 30, 2021

Devember 1, 2021

NUREG-1737, Supplement 2
Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Oconee Nuclear Station, Units 1, 2 & 3 - Final Report

November 2021

November 24, 2021

NUREG-1885, Revision 14
Report to Congress on the Security Inspection Program for Operating Commercial Power Reactors and Category I Fuel Cycle Facilities: Results and Status Update - Annual Report for Calendar Year 2020

November 24, 2021

NUREG-1437, Supplement 23, Second Renewal
Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Point Beach Nuclear Plant, Units 1 and 2 - Draft Report for Comment

November 22, 2021

NUREG-1434, Volume 1 & 2, Revision 5
Standard Technical Specifications – General Electric BWR/6 Plants

November 01, 2021

NUREG-1433, Volume 1 & 2, Revision 5
Standard Technical Specifications — General Electric Plants (BWR/4)

November 01, 2021

NUREG/IA-0470, Volume 2
Nuclear Regulatory Authority Experimental Program to Characterize and Understand High Energy Arcing Fault (HEAF) Phenomena: Basic Arc Test Experimental Data

October 2021

October 29, 2021

NUREG-1350, Volume 33
Information Digest, 2021–2022

October 28, 2021

NUREG/CR-2907, Volume 25
Radioactive Effluents from Nuclear Power Plants: Annual Report 2019

October 27, 2021

NUREG-1432, Volume 1 & 2, Revision 5.0
Standard Technical Specifications — Combustion Engineering Plants

October 20, 2021

NUREG-1431, Volume 2, Revision 5.0
Standard Technical Specifications – Westinghouse Plants: Bases

October 19, 2021

NUREG-0750, Volume 92
Nuclear Regulatory Commission Issuances, July 1, 2020 – December 31, 2020

October 13, 2021

NUREG-1431, Volume 1, Revision 5.0
Standard Technical Specifications Westinghouse Plants: Specifications

October 8, 2021

NUREG-1430, Volume 1 & 2, Revision 5.0
Standard Technical Specifications — Babcock and Wilcox Plants

October 6, 2021

NUREG/CR-7285
Nonradiological Health Consequences from Evacuation and Relocation

September 2021

September 28, 2021

NUREG/CR-3021
Regional Tectonics and Seismicity of Southwestern Iowa

September 27, 2021

NUREG-2159, Revision 1
Acceptable Standard Format and Content for the Fundamental Nuclear Material Control Plan Required for Special Nuclear Material of Moderate Strategic Significance: Draft Report for Comment

September 27, 2021

NUREG/CR-7278
Technical Basis for the use of Probabilistic Fracture Mechanics in Regulatory Applications: Draft Report for Comment

September 23, 2021

NUREG-1614, Volume 8
Strategic Plan: Fiscal Years 2022-2026: Draft Report for Comment

September 23, 2021

NUREG/KM-0015
Considerations for Estimating Site-Specific Probable Maximum Precipitation at Nuclear Power Plants in the United States of America: Final Report

September 22, 2021

NUREG-1021, Revision 12
Operator Licensing Examination Standards for Power Reactors

September 21, 2021

NUREG/IA-0527
Analysis of Main Steam Line Break Accident for 3-Loop PWR with RELAP5/MOD3.3 Code

September 21, 2021

NUREG/IA-0526
Simulation of Total Loss of Feedwater LOFT LP-FW-1 Test using RELAP5/MOD3.3

September 21, 2021

NUREG/IA-0525
TRACE VVER-1000/V-320 Model Cross-Code Validation

September 09, 2021

NUREG-2247
Extremely Low Probability of Rupture Version 2 Probabilistic Fracture Mechanics Code

August 2021

August 30, 2021

NUREG/CR-7281
Radiation Evaluation Methodology for Concrete Structures

August 30, 2021

NUREG/CR-7283
Phenomena Identification Ranking Tables for Accident Tolerant Fuel Designs Applicable to Severe Accident Conditions

August 30, 2021

NUREG/CR-7282
Review of Accident Tolerant Fuel Concepts with Implications to Severe Accident Progression and Radiological Releases

August 27, 2021

NUREG/CR-6918, Revision 4
VARSKIN+ 1.0: A Computer Code for Skin Contamination and Dosimetry Assessments

August 25, 2021

NUREG-1437
Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 7, Second Renewal Regarding Subsequent License Renewal for North Anna Power Station Units 1 and 2: Draft Report for Comment

August 23, 2021

NUREG/CR-7280
Review of Radiation-Induced Concrete Degradation and Potential Implications for Structures Exposed to High Long-Term Radiation Levels in Nuclear Power Plants

August 20, 2021

NUREG-2245
Technical Review of the 2017 Edition of ASME Code, Section III, Division 5, “High Temperature Reactors”: Draft Report for Comment

August 19, 2021

NUREG-1933
Containing the Atom: Nuclear Regulation in a Changing Environment, 1963-1971

August 19, 2021

NUREG-1610
Controlling the Atom: The Beginnings of Nuclear Regulation 1946-1962

August 06, 2021

NUREG-2248
Environmental Impact Statement for the License Renewal of the Columbia Fuel Fabrication Facility in Richland County, South Carolina – Draft Report for Comment

August 02, 2021

NUREG-2239
Environmental Impact Statement for Interim Storage Partners LLC's License Application for a Consolidated Interim Storage Facility for Spent Nuclear Fuel in Andrews County, Texas: Final Report

July 2021

July 16, 2021

NUREG-0750, Volume 91

Nuclear Regulatory Commission Issuances, January 1, 2020 – June 30, 2020

July 01, 2021

NUREG-1100, Volume 37

Congressional Budget Justification: Fiscal Year 2022

To top of page

June 2021

June 30, 2021

NUREG-2246
Fuel Qualification for Advanced Reactors: Draft Report for Comment

June 30, 2021

NUREG-2242
Replacement Energy Cost Estimates for Nuclear Power Plants: 2020-2030 – Final Report

June 10, 2021

Operating Reactor Analytics
This webpage provides a different view of several aspects of ROP oversight: Findings, Action Matrix, and Performance Indicators.

June 2, 2021

NUREG-0090, Volume 43
Report to Congress on Abnormal Occurrences – Fiscal Year 2020

June 1, 2021

NUREG-1415, Volume 35, No. 1
Office of the Inspector General Semiannual Report to Congress: October 1, 2020 – March 31, 2021
To top of page

May 2021

May 12, 2021

NUREG-2198
The General Methodology of An Integrated Human Event Analysis System (IDHEAS-G)

May 5, 2021

NUREG-2244
HABIT 2.2 Description of Models and Methods
To top of page

April 2021

April 07, 2021

NUREG/CR-7268, Volumes 1 & 2
User's Manual for RESRAD-OFFSITE Code Version 4

April 05, 2021

NUREG/IA-0524
TRACE VVER-440/V-213 Model Cross-Code Validation

Aril 02, 2021

NUREG/CR-7273
Developing a Technical Basis for Embedded Digital Devices and Emerging Technologies
To top of page

March 2021

March 22, 2021

NUREG/CR-7275
Jet Impingement in High-Energy Piping Systems

March 19, 2021

NUREG/KM-0016
Be riskSMART: Guidance for Integrating Risk Insights into NRC Decisions

March 11, 2021

NUREG/CR-6361
Criticality Benchmark Guide for Light-Water-Reactor Fuel in Transportation and Storage Packages
To top of page

February 2021

February 19, 2021

NUREG-1830, Volume 17
Office of Investigations - Annual Report FY 2020

February 17, 2021

NUREG/CR-7271
Application of Point Precipitation Frequency Estimates to Watersheds

February 09, 2021

NUREG/CR-7002, Revision 1
Criteria for Development of Evacuation Time Estimate Studies

February 09, 2021

NUREG/IA-0523
Evaluation for 4-Inch Cold Leg Top-Slot Break LOCA in ATLAS Facility with RELAP5 Mod3.3 Patch5

February 09, 2021

NUREG/IA-0522
RELAP5 and TRACE Constitutive Relations Comparison

February 05, 2021

NUREG-1164
Information on the Confinement Capability of the Facility Disposal Area at West Valley, New York
To top of page

January 2021

January 28, 2021

NUREG-1307, Revision 18
Report on Waste Burial Charges: Changes in Decommissioning Waste Disposal Costs at Low-Level Waste Burial Facilities, Final Report

January 08, 2021

NUREG/KM-0001, Supplement 2
Three Mile Island Accident of 1979 Knowledge Management Digest - The Cleanup Experience: A Literature Review

January 08, 2021

NUREG/BR-0520, Revision 2
State Programs at the U.S. Nuclear Regulatory Commission, Revision 2

To top of page

Page Last Reviewed/Updated Wednesday, February 26, 2025