The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Publications Available in the Agencywide Documents Access and Management System (ADAMS) – 2019
| Documents added in 2019 | |||
|---|---|---|---|
| V = Volume | N = Number | R =Revision | P = Part | S = Supplement | Ch = Chapter | Add = Addendum | Sec = Section | DFC = Draft For Comment | |||
| PUBLICATION NUMBER |
TITLE | DATE OF PUBLICATION |
ADAMS ACCESSION NUMBER |
| NUREG-0654, R2 | Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants: Final Report | December 2019 | ML19347D139 |
| NUREG-1908, V4 | Information Technology/Information Management Strategic Plan: Fiscal Years 2020 – 2024 | November 2019 | ML19323D858 |
| NUREG/CR-2907, V23 | Radioactive Effluents from Nuclear Power Plants: Annual Report 2017 | November 2019 | ML19317E480 |
| NUREG-2223, V2 | Safety Evaluation Report: Related to the License Renewal of South Texas Project Units 1 and 2, Docket Nos. 50-498 and 50-499, South Texas Project Nuclear Operating Company | November 2019 | ML19316C155 |
| NUREG-2223, V1 | Safety Evaluation Report: Related to the License Renewal of South Texas Project Units 1 and 2, Docket Nos. 50-498 and 50-499, South Texas Project Nuclear Operating Company | November 2019 | ML19316C085 |
| NUREG-1415, V33, N2 | Office of the Inspector General Semiannual Report to Congress: April 1, 2019 – September 30, 2019 | October 2019 | ML19331A150 |
| NUREG/CR-7258 | Technical Manual and User’s Guide for MILDOS, Version 4.1 | November 2019 | ML19325C903 |
| NUREG/CR-7259 | MILDOS Version 4.1 Computational Verification Report | November 2019 | ML19325C464 |
| NUREG-2155, R2, DFC | Implementation Guidance for 10 CFR Part 37, "Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material" – Draft Report for Comment | October 2019 | ML19298A303 |
| NUREG-2220, V3 | Fiscal Year 2019 – Agency Financial Report | November 2019 | ML19322A345 |
| NUREG/CR-7245 | State-of-the-Art Reactor Consequence Analyses (SOARCA) Project: Sequoyah Integrated Deterministic and Uncertainty Analyses | October 2019 | ML19296B786 |
| NUREG-1437, S6, Second Renewal | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Surry Power Station, Units 1 and 2 - Draft Report for Comment | October 2019 | ML19274C676 |
| NUREG-1650, R7 | The United States of America National Report for the Convention on Nuclear Safety: Eighth National Report, October 2019 | October 2019 | ML19289D687 |
| NUREG-1437, S5, Second Renewal | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4 – Final Report | October 2019 | ML19290H346 |
| NUREG/CR-2907, V22 | Radioactive Effluents from Nuclear Power Plants: Annual Report 2016 | April 2019 | ML19275J127 |
| NUREG/CR-7263 | NDE Reliability Issues for the Examination of CASS Components | September 2019 | ML19255J814 |
| NUREG/BR-0514, R1 | Internal Control | September 2019 | ML19254C119 |
| NUREG-1885, R12 | Report to Congress on the Security Inspection Program for Commercial Nuclear Power Reactors and Category I Fuel Cycle Facilities: Results and Status Update (Annual Report for Calendar Year 2018) | September 2019 | ML19254C759 |
| NUREG/IA-0515 | Analyses of an Unmitigated Station Blackout Transient in a Generic PWR–900 with ASTEC, MAAP and MELCOR Codes | March 2019 | ML19248C697 |
| NUREG-1556, V9, R3 | Consolidated Guidance About Materials Licenses: Program-Specific Guidance About Medical Use Licenses, Final Report | September 2019 | ML19256C219 |
| NUREG/IA-0514 | Customization of XTV Graphics Output in TRACE v5.0 Patches 5, 4 & 3 | February 2019 | ML19238A130 |
| NNUREG/CP-0312 | Proceedings of the Radon Barriers Workshop | August 2019 | ML19239A170 |
| NUREG-0750, V88 | Nuclear Regulatory Commission Issuances, July 1, 2018 – December 31, 2018 | September 2019 | ML19246A716 |
| NNUREG/CP-0152, V10 | Proceedings of the 13th NRC/ASME Symposium on Valves, Pumps, and Inservice Testing: Held at DoubleTree by Hilton Hotel Washington DC Silver Spring, MD July 17–18, 2017 | August 2019 | ML19219A165 |
| NUREG-2216, DFC | Standard Review Plan for Spent Fuel Transportation - Draft Report for Comment | July 2019 | ML19214A229 |
| NUREG/BR-0006, R9, DFC | Instructions for Completing Nuclear Material Transaction Reports: (DOE/NRC Forms 741 and 740M) - Draft Report for Comment | July 2019 | ML19214A180 |
| NUREG/BR-0007, R8, DFC | Instructions for the Preparation and Distribution of Material Status Reports (DOE/NRC Forms 742 and 742C) - Draft Report for Comment | July 2019 | ML19212A768 |
| NUREG/CP-0310 | Proceedings of the Public Meeting on Additive Manufacturing for Reactor Materials and Components | July 2019 | ML19214A205 |
| NUREG-2214 | Managing Aging Processes In Storage (MAPS) Report: Final Report | July 2019 | ML19214A111 |
| NUREG/CP-0311 | Proceedings of the Information-Sharing Workshop on High Energy Arcing Faults (HEAFS) | July 2019 | ML19212A150 |
| NUREG-1437, S10, Second Renewal, DFC | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Peach Bottom Atomic Power Station Units 2 and 3 – Draft Report for Comment | July 2019 | ML19210D453 |
| NUREG/CR-6525, R2 | SecPop Version 4: Sector Population, Land Fraction, and Economic Estimation Program: User Guide, Model Manual, and Verification Report | June 2019 | ML19182A284 |
| NUREG/CR-7257 | Paleoliquefaction Studies in Moderate Seismicity Regions with a History of Large Events | June 2019 | ML19182A337 |
| NUREG/IA-0510 | MELCOR-ASTEC Crosswalk of the Accident at Fukushima-Daiichi Unit 1: Phase I Analysis | June 2019 | ML19163A241 |
| NUREG/BR-0254, R9 | Payment Methods | June 2019 | ML19163A244 |
| NUREG/CR-7254 | Seismic Isolation of Nuclear Power Plants Using Sliding Bearings | May 2019 | ML19158A513 |
| NUREG-0090, V41 | Report to Congress on Abnormal Occurrences – Fiscal Year 2018 | June 2019 | ML19157A308 |
| NUREG/IA-0513 | Semiscale S-NC-02 and S-NC-03 Natural Circulation Tests Performed by RELAP5/MOD3.3 Patch05 | April 2019 | ML19128A339 |
| NUREG/CR-7260 | CFD Validation of Vertical Dry Cask Storage System | April 2019 | ML19123A127 |
| NUREG-1415, V33, N1 | Office of the Inspector General Semiannual Report to Congress | April 2019 | ML19149A535 |
| NUREG/IA-0512, R1 | Simulation of ROSA-2 Test 3 Counterpart with TRACE5 – Application to Nuclear Power Plant | April 2019 | ML19115A104 |
| NUREG/IA-0505, R1 | Assessment of TRACE 5.0 Against ROSA-2 Test 5, Main Steam Line Break with Steam Generator Tube Rupture | April 2019 | ML19114A236 |
| NUREG-0750, V87 | Nuclear Regulatory Commission Issuances, January 1, 2018 – June 30, 2018 | April 2019 | ML19130A239 |
| NUREG/IA-0509 | LBLOCA Uncertainty Analysis of Maanshan Nuclear Power Plant with RELAP5/SNAP and DAKOTA | April 2019 | ML19112A268 |
| NUREG-0750, 73 – 82, Indexes | Nuclear Regulatory Commission Issuances, NRCI Indexes, January 2011 through December 2015 | April 2019 | ML19123A342 |
| NUREG/CR-2907, V21 | Radioactive Effluents from Nuclear Power Plants: Annual Report 2015 | April 2019 | ML19099A385 |
| NUREG/CR-1621 | A Characterization of Faults in the Appalachian Foldbelt | September 1980 | ML19053A642 |
| NUREG/CR-7103, V4 | Pacific Northwest National Laboratory Investigation of Stress Corrosion Cracking in Nickel-Base Alloys: Behavior of Alloy 152 And 52 Welds | April 2019 | ML19099A200 |
| NUREG/IA-0508 | Validation of RELAP5/MOD3.3 Friction Loss and Heat Transfer Model for Narrow Rectangular Channels | March 2019 | ML19092A050 |
| NUREG-0713, V39 | Occupational Radiation Exposure at Commercial Nuclear Power Reactors and other Facilities 2017, Fiftieth Annual Report | March 2019 | ML19091A130 |
| NUREG/IA-0512 | Simulation of ROSA-2 Test 3 Counterpart with TRACE5 – Application to Nuclear Power Plant | March 2019 | ML19085A076 |
| NUREG/IA-0505 | Assessment of TRACE 5.0 Against ROSA-2 Test 5, Main Steam Line Break with Steam Generator Tube Rupture |
March 2019 | ML19085A036 |
| NUREG-1437, S5, Second Renewal | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4 | March 2019 | ML19078A330 |
| NUREG-2226, V2 | Environmental Impact Statement for an Early Site Permit (ESP) at the Clinch River Nuclear Site: Final Report | April 2019 | ML19073A109 |
| NUREG-2226, V1 | Environmental Impact Statement for an Early Site Permit (ESP) at the Clinch River Nuclear Site: Final Report | April 2019 | ML19073A099 |
| NUREG/KM-0013 | Credibility Assessment Framework for Critical Boiling Transition Models: A generic safety case to determine the credibility of critical heat flux and critical power models, Draft for Comment | March 2019 | ML19073A249 |
| NUREG-1556, V13, R2 | Consolidated Guidance About Materials Licenses: Program-Specific Guidance About Commercial Radiopharmacy Licenses, Final Report | March 2019 | ML19079A207 |
| NUREG-1100, V35 | Congressional Budget Justification: Fiscal Year 2020 | March 2019 | ML19065A279 |
| NUREG/BR-0117, N17-04 | NMSS Quarterly Newsletters – Spring 2017 | March 2019 | ML19071A021 |
| NUREG/IA-0502 | Post-Test Analysis of Cold Leg Small Break 4.1% at PSB-VVER Facility using TRACE V5.0 | March 2019 | ML19066A174 |
| NUREG/IA-0507 | Natural Circulation (Interruption) Analysis with MELCOR 2.2 during Asymmetric Cooldown Transients | March 2019 | ML19065A152 |
| NUREG/IA-0504 | Assessment of TRACE 5.0 Against ROSA-2 Test 3 Counterpart Test to PKL | March 2019 | ML19064B308 |
| NUREG/IA-0500 | Post-Test Calculation of the ROSA-2 Test 3 Using RELAP5/MOD3.3 | February 2019 | ML19064A676 |
| NUREG/IA-0501 | Investigation of the Loop Seal Clearing Phenomena for the ATLAS DVI Line and Cold Leg SBLOCA Tests Using MARS-KS and RELAP5/MOD3.3 | March 2019 | ML19064A244 |
| NUREG/IA-0511 | Simulation of ROSA-2 Test-2 Experiment: Application to Nuclear Power Plant | March 2019 | ML19063B345 |
| NUREG/CR-7255 | Seismic Isolation of Nuclear Power Plants using Elastomeric Bearings | March 2019 | ML19063A541 |
| NUREG/IA-0503 | Post-Test Analysis of ROSA-2 Test 2 (IBLOCA) with TRACE | February 2019 | ML19057A271 |
| NUREG-1100, V35 | Congressional Budget Justification: Fiscal Year 2020 Summary | March 2019 | ML19065A278 |
| NUREG/IA-0496 | The Analysis and Study of ELAP Event and Mitigation Strategies Using TRACE Code for Maanshan PWR | February 2019 | ML19056A357 |
| NUREG/IA-0497 | IBLOCA Analysis for Vandellòs-NPP Using RELAP5/MOD3.3. Sensitivity Calculations to EOP Actions | February 2019 | ML19056A201 |
| NUREG/IA-0499 | Post-Test Calculation of the PKL-2 Test G7.1 Using RELAP5/MOD3.3 | February 2019 | ML19056A075 |
| NUREG/CR-7253 | Technical Considerations for Seismic Isolation of Nuclear Facilities | February 2019 | ML19050A422 |
| NUREG/IA-0491 | Assessment of the Wall Film Condensation Model with Non-condensable Gas in RELAP5 and TRACE for Vertical Tube and Plate Geometries | February 2019 | ML19039A013 |
| NUREG-1830, V15 | Office of Investigations – Annual Report FY 2018 | February 2019 | ML19039A014 |
| NUREG-1307, R17 | Changes in Decommissioning Waste Disposal Costs at Low-Level Waste Burial Facilities | February 2019 | ML19037A405 |
| NUREG/IA-0495 | Assessment of NEPTUN Reflooding Experiments 5050 and 5052 with TRACE V5.0 Patch 5 | February 2019 | ML19035A429 |
| NUREG/IA-0493 | The Ultimate Response Guideline Simulation and Study for Lungmen (ABWR) Nuclear Power Plant Using RELAP5/SNAP | February 2019 | ML19035A005 |
| NUREG/KM-0011 | Critical Heat Flux Data Used to Generate the 2006 Groeneveld Lookup Tables | January 2019 | ML19029B306 |
| NUREG-1885, R11 | Report to Congress on the Security Inspection Program for Commercial Power Reactors and Category I Fuel Cycle Facilities: Results and Status Update – Annual Report for Calendar Year 2017 | July 2018 | ML19029A036 |
| NUREG-1650, R6, S1 | Answers to Questions from the Peer Review by Contracting Parties on the United States of America Seventh National Report for the Convention on Nuclear Safety | January 2019 | ML19022A327 |
| NUREG/CR-7244 | Response of Nuclear Power Plant Instrumentation Cables Exposed to Fire Conditions | January 2019 | ML19022A293 |
| NUREG/IA-0489 | RELAP5 Model of a CANDU-6 (Embalse) Nuclear Power Plant: Application to a Turbine Trip Event | January 2019 | ML19022A011 |
| NUREG/IA-0488 | Simulation of the LSTF-PKL Counterpart G7.1 Test at PKL Facility Using TRACE 5 | January 2019 | ML19017A012 |
| NUREG/IA-0487 | Simulation of the PKL-G7.1 Experiment in a Westinghouse Nuclear Power Plant Using RELAP5/Mod3.3 | January 2019 | ML19015A027 |
| NUREG/IA-0506 | Using SNAP/RADTRAD and HABIT to Establish the Analysis Methodology for Maanshan PWR | January 2019 | ML19009A407 |
| NUREG/CR-7249 | Overview of Nuclear Data Uncertainty in Scale and Application to Light Water Reactor Uncertainty Analysis | December 2018 | ML19009A313 |
Page Last Reviewed/Updated Tuesday, September 08, 2026
Page Last Reviewed/Updated Tuesday, September 08, 2026