Skip to main content

Alert

The NRC is shutdown due to the lapse in appropriations. Exempted activities to maintain critical health and safety activities and progress on critical activities, including activities outlined in Executive Order 14300, as described in the OMB Approved NRC Lapse Plan will continue.

Publications Available in the Agencywide Documents Access and Management System (ADAMS) – 2025

Documents added in 2025

V = Volume | N = Number | R = Revision | P = Part | S = Supplement | Ch = Chapter | Add = Addendum | Sec = Section | DFC = Draft For Comment

PUBLICATION
NUMBER

TITLE

DATE OF
PUBLICATION

ADAMS
ACCESSION
NUMBER

NUREG-1885, R19

Report to Congress on the Security Inspection Program for Operating Commercial Power Reactors and Category I Fuel Cycle Facilities: Results and Status Update (Annual Report for Calendar Year 2024)

September 2025

ML25272A223

NUREG-1482, R4

Guidelines for Inservice Testing at Nuclear Power Plants: Inservice Testing of Pumps and Valves and Inservice Examination and Testing of Dynamic Restraints (Snubbers) at Nuclear Power Plants" Final Report

September 2025

ML25267A104

NUREG/BR-0309, R1

Serving on the Advisory Committee on the Medical Uses of Isotopes: A Member’s Guide

September 2025

ML25268A126

NUREG-1437, S17, Second Renewal

Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Dresden Nuclear Power Station, Units 2 and 3 - Final Report

September 2025

ML25233A275

NUREG/KM-0021

Development of Safety Goals and Implementation of the Safety Goal Policy: A Historical Perspective and the Role of the Advisory Committee on Reactor Safeguards

August 2025

ML25238A203

NUREG/KM-0020

Severe Accident Regulatory Decisions: A Historical Perspective and the Role of the Advisory Committee on Reactor Safeguards

August 2025

ML25238A202

NUREG-1885, R18

Report to Congress on the Security Inspection Program for Operating Commercial Power Reactors and Category I Fuel Cycle Facilities: Results and Status Update - Annual Report for Calendar Year 2024

August 2025

ML25233A269

NUREG-0980, V2, N12

Nuclear Regulatory Legislation: 117th Congress; 2nd Session

August 2025

ML25233A001

NUREG-1437, S10, Second Renewal, S1

Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Peach Bottom Atomic Power Station Units 2 and 3 - Final Report

August 2025

ML25191A237

NUREG-1437, S21, Second Renewal

Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal of Browns Ferry Nuclear Power Plant, Units 1, 2, and 3 - Final Report

August 2025

ML25230A077

NUREG-1437, S23, Second Renewal

Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 23, Second Renewal Regarding Subsequent License Renewal for Point Beach Nuclear Plant Units 1 and 2

August 2025

ML25191A238

NUREG-1437, S63
 

Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 63 Regarding License Renewal for Clinton Power Station, Unit 1

August 2025

ML25212A224

NUREG-1478, R3, DFC

Operator Licensing Examiner Standards for Research and Test Reactors

July 2025

ML25199A236

NUREG/CR-7306, R1

Fuel Assembly and Irradiation Parametric Study for Extended-Enrichment and High-Burnup Light-Water Reactor Spent Nuclear Fuel in Dry Storage Casks and Transportation Packages

July 2025

ML25206A004

NUREG/CR-7312

Irradiation Effects on Reinforced Concrete Structures – Experimental and Analytical Study on Irradiated Concrete – Steel Bonding, Modeling and Simulation of Structural Response

July 2025

ML25210A564

NUREG/IA-0557

TRACE Nodalization Performance in PSB-VVER SB-LOCA Benchmark

July 2025

ML25202A011

NUREG-2221, S1

Technical Bases for Changes in the Subsequent License Renewal Guidance Documents, NUREG–2191, Revision 1, and NUREG–2192, Revision 1, Supplement 1 - Final Report

July 2025

ML25113A024

NUREG-2192, R1

Standard Review Plan for Review of Subsequent License Renewal Applications for Nuclear Power Plants– Final Report

July 2025

ML25113A023

NUREG-2191, R1, V2

Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report – Final Report

July 2025

ML25113A022

NUREG-2191, R1, V1

Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report – Final Report

July 2025

ML25113A021

NUREG-0713, V45

Occupational Radiation Exposure at Commercial Nuclear Power Reactors and Other Facilities 2023: Fifty-Sixth Annual Report

July 2025

ML25191A324

NUREG/CR-6471, V1

Characterization of Flaws in U.S. Reactor Pressure Vessels: Density and Distribution in Flaw Indication in PVRUF

November 1998

ML20199L413

NUREG/CR-7310

Spent Fuel Storage and Transportation of Accident Tolerant Concepts: Cr-Coated Zirconium Alloy Cladding, FeCrAl Cladding, High Burnup and High Enrichment Fuel

June 2025

ML25174A009

NUREG/IA-0542

Multi-Scale Coupling of Trace and TrioCFD with the Interface for CodeCoupling (ICoCo)

June 2025

ML25163A061

NUREG-1437, S62

Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 62 Regarding License Renewal of Diablo Canyon Nuclear Power Plant, Units 1 and 2, Final Report

June 2025

ML25156A357

NUREG/IA-0556

TRACE/RELAP5 Calculation of NPP Krško SGTR Accident Under Realistic and SRP Conditions

June 2025

ML25163A053

NUREG/IA-0552

Analysis of CRDM Nozzle Break at the ATLAS Facility with 3D Components in MARS-KS and TRACE 

June 2025

ML25163A045

NUREG/IA-0551

Assessments of 3D Components in System Codes Against Separate Effect Tests

June 2025

ML25128A007

NUREG-1100, V41

Congressional Budget Justification: Fiscal Year 2026

June 2025

ML25160A154

NUREG-0090, V47

Report to Congress on Abnormal Occurrences Fiscal Year 2024

May 2025

ML25150A343

NUREG-1437, S17, Second Renewal

Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Dresden Nuclear Power Station, Units 2 and 3 - Draft Report for Comment

May 2025

ML25132A151

NUREG-1437, S21 Second Renewal

Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal of Browns Ferry Nuclear Power Plant, Units 1, 2, and 3 - Draft Report for Comment 

May 2025

ML25133A156

NUREG-1437, S10, Second Renewal, S1, DFC

Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Peach Bottom Atomic Power Station Units 2 and 3 - Draft Report for Comment

May 2025

ML25111A147

NUREG-1437, S15, Second Renewal

Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Virgil C. Summer Nuclear Station - Final Report 

May 2025

ML25128A160

NUREG-0980, V1, N12

Nuclear Regulatory Legislation: 117th Congress; 2nd Session

April 2025

ML25120A424

NUREG-1437, S61

Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding License Renewal of Perry Nuclear Power Plant, Final Report 

April 2025

ML25113A032

NUREG/CR-7311

Determination of Bias and Bias Uncertainty for Criticality Safety Computational Methods 

April 2025

ML25120A337

NUREG-0711, R2

Human Factors Engineering Program Review Model 

February 2004

ML040770540

NUREG-0711, R1

Human Factors Engineering Program Review Model 

May 2002

ML021560629

NUREG-0711, R0

Human Factors Engineering Program Review Model 

June 1996

ML20072D914

NUREG-0700, R1, V3

Human-System Interface Design Review Guideline: Review Software and User's Guide 

June 1996

ML20134N403

NUREG-0700, R1, V2

Human-System Interface Design Review Guideline: Reviewer’s Checklist

June 1996

ML20134N356

NUREG-0700, R1, V1

Human-System Interface Design Review Guideline: Process and Guidelines

June 1996

ML20134N366

NUREG-0700, R0

Guidelines for Control Room Design Reviews

September 1981

ML20010H660

NUREG-0750, V100

Nuclear Regulatory Commission Issuances, July 1, 2024 - December 31, 2024

April 2025

ML25111A263

NUREG-1437, S23, Second Renewal, DFC

Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Point Beach Nuclear Plant, Units 1 and 2 - Draft Report for Comment

April 2025

ML25069A710

NUREG-1437 S63, DFC

Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding License Renewal for Clinton Power Station, Unit 1 – Draft Report for Comment

April 2025

ML25072A105

NUREG/CR-7308

Sensitivity/Uncertainty Methods for Nuclear Criticality Safety Validation

April 2025

ML25099A002

NUREG-1379, R4

NRC Editorial Style Guide 

April 2025

ML25098A236

NUREG/CR-7309

Validation Studies for High Burnup and Extended Enrichment Fuels in Burnup Credit Criticality Safety Analyses

April 2025

ML25093A004

NUREG/BR-0254, R14

Payment Methods

March 2025

ML25072A290

NUREG-1482, DFC, R4

Guidelines for Inservice Testing at Nuclear Power Plants: Inservice Testing of Pumps and Valves and Inservice Examination and Testing of Dynamic Restraints (Snubbers) at Nuclear Power Plants - Draft Report for Comment

February 2025

ML24277A142

NUREG-1350, V35

Information Digest, 2024–2025

February 2025

ML25051A094

NUREG-0750,
83 – 92, Indexes

Nuclear Regulatory Commission Issuances, NRCI Indexes, January 2016 through December 2020

February 2025

ML25052A232

NUREG/BR-0533

Atomic Fission: The Breakup of the Atomic Energy Commission and the Energy Reorganization Act of 1974 

February 2025

ML25044A364

NUREG/IA-0555

Kuosheng BWR Decommissioning SBO Analysis with RELAP5/MOD 3.3

February 2025

ML25043A358

NUREG/IA-0554

TRACE simulations of LOCAs Together with the Complete Loss of One Emergency Core Cooling Function in Two-Loop PWR 

February 2025

ML25042A074

NUREG-1830, V21

Office of Investigations Annual Report Fiscal Year 2024 

February 2025

ML25041A010

NUREG/BR-0531, R1

NRC Safeguards Information Program: Helpful Resources for Applicants and Preapplicants

February 2025

ML25038A063

NUREG-1307, R20

Report on Waste Burial Charges: Changes in Decommissioning Waste Disposal Costs at Low-Level Waste Burial Facilities — Final Report 

February 2025

ML25037A226

NUREG-1437, S2, Second Renewal

Site-Specific Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Oconee Nuclear Station Units 1, 2, and 3 - Final Report

January 2025

ML25031A307

NUREG-1028

Ruptured Cesium-137 Well-Logging Source at Shelwell Services, Inc., Hebron, Ohio

April 1984

ML20090J115

NUREG/IA-0553

Study on the Effect of Dissolved Air During Hydroaccumulator Injection 

January 2025

ML25015A134

NUREG/BR-0532

NRC Facility Security Clearance Program: Helpful Resources For Licensees, Applicants, And Other Entities 

January 2025

ML25010A266

Page Last Reviewed/Updated Tuesday, September 30, 2025

Page Last Reviewed/Updated Tuesday, September 30, 2025