Log No. Notifier Description Report Date Event No. / Accession No.
2025-22-01 Tennessee Valley Authority 10 CFR Part 21 Report – Final Evaluation of a Deviation or Failure to Comply Associated with a Contactor in the Unit 2 Reactor Core Isolation Cooling System 04/01/2026 ML26091A047
2025-22-00 Tennessee Valley Authority 10 CFR Part 21 Notification: Interim Report of a Deviation or Failure to Comply Associated with a Contactor in the Unit 2 Reactor Core Isolation Cooling System  12/18/2025 ML25352A186
2025-21-01 Peach Bottom Atomic Power Station Units 2 & 3  10 CFR 21 Notification for Emergency Diesel Generator Cylinder Chrome Delamination – RE EN# 58091  01/15/2026 ML26015A114
2025-21-00 Peach Bottom Atomic Power Station Units 2 & 3  10 CFR 21 Notification for Emergency Diesel Generator Cylinder Chrome Delamination  12/17/2025 ML25352A029
2025-20-00 Rosemount Nuclear Instruments, Inc.  Notification under 10 CFR Part 21 for Rosemount Model 3154 Pressure Transmitters with Select Wire Wound Resistor Lots  11/25/2025 ML25330A126
2025-19-00 Engine Systems, Inc Initial 10 CFR Part 21 Notification for a Power Driver Potentiometer with loose relay sockets, P/N ES150258 10/15/2025 ML25317A676
2025-18-02 Paragon Energy Solutions 10 CFR Part 21 Notification: P21-10112025-FN Rev 0 - Positive Post Corrosion Failures in Stryten (formerly GNB) N&M Series Flooded Batteries Installed in 24VDC, 48VDC, 125VDC and 250VDC Station Battery Strings 12/15/2025 ML25350B492
2025-18-01 Paragon Energy Solutions 10 CFR Part 21 Interim Notification: P21-10112025-INT Rev 0 Potential Deviation related to Stryten (formally GNB) N&M Series Flooded Batteries Installed in 24VDC, 48VDC, 125VDC and 250VDC Station Battery Strings  10/31/2025 ML25317A768
2025-18-00 Paragon Energy Solutions 10 CFR Part 21 Initial Notification: P21-10112025-IN, Rev. 0 - Potential Deviation related to Stryten (formally GNB) N&M Series Flooded Batteries Installed in 24VDC, 48VDC, 125VDC and 250VDC Station Battery Strings  10/11/2025 ML25317A675
2025-17-00 Hanna Cylinders Notification of Potential Part 21 Regarding Solenoid Valve Assemblies Hanna Cylinders P/N: N606-00200-000  09/29/2025 ML25317A658
2025-16-00 DC Cook Nuclear Plant Initial Report Notification Pursuant to 10 CFR Part 21.21 Concerning Thermal Overload of Voltage Regulators 07/29/2025 ML25211A162
2025-15-02 Curtiss-Wright Nuclear Division  Final Part 21 Notification Report on CW Supplied Namco Limit Switches PN: EA700-80926, Date Code: 0425 11/20/2025 ML25325A210
2025-15-01 Curtiss-Wright Nuclear Division  Interim Notification Report for Potential Part 21 Update - Curtiss Wright (CW) supplied NAMCO Limit Switches PN: EA700-80926, Date Code: 0425  09/23/2025 ML25272A241
2025-15-00 Curtiss-Wright Nuclear Division  Interim Notification Report for Potential Part 21 - Curtiss Wright (CW) supplied NAMCO Limit Switches PN: EA700-80926, Date Code: 0425 07/25/2025 ML25210A055
2025-14-00 Ametek Magnetrol USA, LLC Notification of Potential Defect - 10 CFR Part 21 - Magnetrol Displacer Level Switch A103F-3X-Y-MPG-TDM-SMD4DC 07/02/2025 ML25198A165
2025-13-01 Tennessee Valley Authority Final Report of a Deviation or Failure to Comply Associated with a Valve in the Unit 3 Diesel Generator Starting Air System 09/16/2025 ML25259A159
2025-13-00 Tennessee Valley Authority Interim Report of a Deviation or Failure to Comply Associated with a Valve in the Unit 3 Diesel Generator Starting Air System 07/18/2025 ML25199A064
2025-12-01 Westinghouse Electric Co Closure of Westinghouse 10 CFR Part 21 Interim Report Log No. 2025-12-00  09/29/2025 ML25272A157
2025-12-00 Westinghouse Electric Co Interim Report of the Evaluation of a Deviation Pursuant to 10 CFR 21.21(a)(2)  06/27/2025 ML25179A009
2025-11-01 Cooper Nuclear Station 10 CFR Part 21 Report Regarding Diesel Generator Jacket Water pump 07/15/2025 ML25196A354
2025-11-00 Cooper Nuclear Station Part 21 Report – Diesel Generator Jacket Water Pump Failure  06/20/2025 ML25174A178
2025-10-00 Framatome Inc. Notification of 10 CFR 21 Defect Associated with Control Rod Drive Mechanism Thermal Sleeves 06/11/2025 ML25162A273
2025-09-01 Framatome Inc. 10 CFR 21 Notification of Existence of a Defect Associated with Circuit Breaker Model 5-3AF-GEU-350-1200 05/29/2025 ML25155A034
2025-09-00 Framatome Inc.  Interim Report of a Deviation Associated with Circuit Breaker Defect, Model 5-3AF-GEU-350-1200  05/22/2025  ML26048A171
2025-08-01 James A FitzPatrick Nuclear Power Plant 10 CFR 21 Notification for GE Hitachi Molded Case Circuit Breakers Failed to Instantaneously Trip  05/29/2025  ML25149A233
2025-08-00 James A FitzPatrick Nuclear Power Plant  Interim Report of a Deviation Associated with GE Hitachi Molded Case Circuit Breakers - Part number DD148C6151P004 (Asea Brown Boveri (ABB) part number: TB13030BWE05)  05/08/2025 ML25128A328
2025-07-01 ASCO Valve, Inc (Emerson)  ASCO NP8321 Series Valves Do Not Shift or Partially Shift After Periods of Extended De-Energization  07/11/2025 ML25202A109
2025-07-00 ASCO Valve, Inc (Emerson)  Interim Report of a Deviation Associated with ASCO NP8321 Series Valves 04/24/2025 ML25118A026 
2025-06-01 Curtiss-Wright Nuclear Division Updated Interim Report of a Deviation Associated with GE Over/Under Voltage Time Delay Relay PN: 12|AV69A1A 04/09/2025 ML25100A099
2025-06-00 Curtiss-Wright Nuclear Division  Interim Report of a Deviation Associated with GE Over/Under Voltage Time Delay Relay PN: 12|AV69A1A  04/08/2025 ML25099A160
2025-05-01 Southern Nuclear Operating Company Updated Interim Report of a Deviation Associated with an ETAP Software Error in Transient Stability Program  04/24/2025 ML25114A251
2025-05-00 Southern Nuclear Operating Company  Interim Report of a Deviation Associated with an ETAP Software Error in Transient Stability Program  03/26/2025 ML25085A382
2025-04-01 Curtiss-Wright Nuclear Division Final Report of a Deviation Associated with Generation 3 QDCs Produced from Curtiss-Wright Middleburg Heights  05/06/2025 ML25127A255
2025-04-00  Curtiss-Wright Nuclear Division Interim Report of a Deviation Associated with Generation 3 QDCs Produced from Curtiss-Wright Middleburg Heights 03/12/2025 ML25072A045
2025-03-01 Duke Energy, Inc. Updated Interim Report of a Deviation Associated with Love Controllers Identified with Limpet Supplier Part Number 54-834-838-8187-8160-8134-8174 03/20/2025 ML25079A082
2025-03-00 Duke Energy, Inc. Interim Report of a Deviation Associated with Love Controllers Identified with Limpet Supplier Part Number 54-834-838-8187-8160-8134-8174  02/19/2025 ML25051A030 
2025-02-01 Prairie Island Nuclear Generating Plant  Closure of Interim Report of a Deviation Associated with an Edward Model 15004T5 2-inch Globe Valve 02/28/2025 ML25059A074
2025-02-00  Prairie Island Nuclear Generating Plant  Interim Report of a Deviation Associated with an Edward Model 15004T5 2-inch Globe Valve  01/24/2025 ML25027A099
2025-01-01 Flowserve US, Inc  Final Report of a Deviation Associated with Limitorque SMB-00 Torque Switch Assemblies  02/14/2025  ML25050A042
2025-01-00 Flowserve US, Inc  Interim Report of a Deviation Associated with Limitorque SMB-00 Torque Switch Assemblies 01/02/2025 ML25006A165