ACRS 1973 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title
12/11/1973 Report on Beaver Valley Power Station, Unit No. 2
12/11/1973 Report on Brunswick Steam Electric Plant, Units 1 and 2
12/11/1973 Report on Browns Ferry Nuclear Plant, Units 2 and 3
11/14/1973 Interim Report on Indian Point Nuclear Generating Station Unit No. 3
11/13/1973 Report on Catawba Nuclear Station Units 1 and 2
11/13/1973 Report On Relationships Of Earthquakes And Geology InWest Tennessee And Adjacent Area
10/18/1973 Report On The Atlantic Generating Station
10/17/1973 Interim Report on Donald C. Cook Nuclear Plant Unit No. 1 Operating License Review 1973-Oct-17
09/11/1973 ECCS Designs For Forked River Unit 1, San Onofre Units 2 and 3, and Waterford Unit 3 Nuclear Stations
09/11/1973 Letter To Honorable Dixy Lee Ray
09/11/1973 Report on Rancho Seco Nuclear Generating Station, Unit 1
09/10/1973 Report On Acceptance Criteria For Emergency Core Cooling Systems For Light-Water-Cooled Nuclear Power Reactors
08/14/1973 Instrumentation To Diagnose The Course Of A Serious Accident
08/14/1973 Report on Oconee Nuclear Station Units 2 and 3
08/14/1973 Report on Arkansas Nuclear One-Unit 1
08/14/1973 Report on Three Mile Island Nuclear Station Unit 1
07/17/1973 Report on Nine Mile Point Nuclear Station Unit 2
07/17/1973 Supplemental Report on Newbold Island Nuclear Generating Station Units Nos. 1 and 2
06/12/1973 Interim Report on Calvert Cliffs Nuclear Power Plant, Units 1 and 2
06/12/1973 Report on Kewaunee Nuclear Power Plant
06/12/1973 Interim Report on the Edwin I. Hatch Nuclear Plant, Unit 1
05/18/1973 Report On Fast Flux Test Facility
05/17/1973 Report on Zion Station Units 1 and 2
05/16/1973 Report On Seismic Research
04/18/1973 Report on Cooper Nuclear Station
04/18/1973 Report on Prairie Island Nuclear Generating Plant Units 1 and 2
04/18/1973 Report On Turbine Missiles
04/16/1973 Letter To L. Manning Muntzing
03/13/1973 Report on Duane Arnold Energy Center
03/13/1973 Report on North Anna Power Station, Units No.3 and No. 4
03/13/1973 Arkansas Nuclear One, Unit 2 - Proposed Modifications to the Safety Injection Tank System
01/17/1973 Report On Boiling Water Reactor Mark III Containment Concept
01/17/1973 Report on Waterford Steam Electric Station Unit No. 3
01/17/1973 Report on Shearon Harris Nuclear Power Plant, Units 1, 2, 3, and 4

Page Last Reviewed/Updated Friday, July 25, 2025