ACRS 1978 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title
11/08/1978 Report On Fast Flux Test Facility
11/07/1978 Diablo Canyon Nuclear Power Station Units 1 and 2 - Report on Comments of ACRS Consultant
10/10/1978 ACRS Action On Proposed Revisions Of Reg. Guides and Amendments To The Code Of Federal Regulations
08/25/1978 Report On ACRS Activities May - August, 1978
08/10/1978 Report On Westinghouse Electric Corporation Reference Safety Analysis Report, RESAR-414
08/08/1978 NRC Office Of Nuclear Regulatory Research Recommendations On ECC Bypass Research
08/08/1978 Evaluation Of Alternative Sites For Those With High Population Densities
07/13/1978 Report on Indian Point Nuclear Generating Unit No. 3
07/13/1978 Report on New England Power Company Nuclear Units, NEP 1 and 2
06/08/1978 Letter To Honorable Morris K. Udall
06/07/1978 Report on Maine Yankee Atomic Power Station
05/09/1978 Liquid Pathway Generic Study
04/18/1978 Report On ACRS Activities December 1977 Through April 1978
04/12/1978 Report on McGuire Nuclear Station, Units 1 and 2
04/12/1978 Report on Arkansas Nuclear One, Unit 2 Nuclear Power Plant
03/16/1978 Monitoring of Microearthquakes in the Vicinity of the North Anna Power Station
03/15/1978 Report On Decommissioning Of Nuclear Facilities
03/14/1978 ACRS Action On Proposed Regulatory Guides and Amendments To The Code Of Federal Regulations
03/14/1978 Westinghouse Critical Heat Flux Correlation And Thermal Design Procedure
03/13/1978 Proposed Research On Systems To Improve Safety
02/16/1978 Report on Edwin I. Hatch Nuclear Plant, Unit No. 2
02/14/1978 Report On Qualification Of The Plutonium Air Transportable Package, Model No. Pat-1
01/27/1978 Letter To Honorable Walter F. Mondale - Thomas P. O'Neill
01/14/1978 Report on Diablo Canyon Nuclear Power Station Units 1 and 2
01/13/1978 Report on Yellow Creek Nuclear Plant, Units 1 and 2
01/13/1978 Report On SWESSAR-P1, Stone And Webster Engineering Corporation Balance-Of-Plant Design
01/12/1978 Report on Pebble Springs Nuclear Plant, Units 1 and 2

Page Last Reviewed/Updated Thursday, July 17, 2025