Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

ACRS 1972 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title
12/18/1972Status Of Generic Items Relating to Light-Water Reactors
12/18/1972Report on the Power Burst Facility
12/15/1972Report on Power Burst Facility (PBF) Test Program
12/15/1972Report On James A. Fitzpatrick Nuclear Power Plant
11/15/1972Platform Mounted Nuclear Plant
11/15/1972Report on Virgil C. Summer Nuclear Station, Unit 1
10/27/1972Acceptance Criteria For Emergency Core Cooling Systems For LWC Nuclear Power Reactors (Docket No. RM-50-1)
10/19/1972Report on Hanford No. 2 Nuclear Power Plant
10/19/1972Report on Monticello Nuclear Generating Plant, Unit No. 1
10/09/1972Report on McGuire Nuclear Station, Units 1 and 2
09/21/1972Report on Peach Bottom Atomic Power Station Units No. 2 and 3
09/21/1972Report on Browns Ferry Nuclear Plant, Unit 1
09/21/1972Report on Watts Bar Nuclear Plant, Units 1 and 2
09/21/1972Boiling Water Reactor Design, BER-6
08/17/1972Report on Kewaunee Nuclear Power Plant
08/17/1972Report on Zion Station Units 1 and 2
08/17/1972Report On Forked River Nuclear Nuclear Generating Station Unit 1
07/21/1972Report on San Onofre Nuclear Generating Station, Units 2 and 3
07/21/1972High Temperature Gas-Cooled Reactor Safety Research
07/21/1972Report on General Electric Company - Midwest Fuel Recovery Plant
07/21/1972Report On Omaha Public Power District - Fort Calhoun Station Unit No. 1
05/10/1972Letter To Honorable James R. Schlesinger
04/14/1972AEC Proposed Discretionary ACRS Review Legislation H.R. 9285 And S. 2151 (Identical Bills)
04/13/1972Report on Susquehanna Steam Electric Station, Units 1 and 2
04/04/1972Report on Plum Brook Facility (NASA)
03/08/1972Report on Shearon Harris Nuclear Power Plant
02/10/1972Report on Edwin I. Hatch Nuclear Power Plant Unit 1
02/10/1972Report On Water Reactor Safety Research
02/10/1972Report on Arkansas Nuclear One, Unit 2
01/13/1972Report On Fast Flux Test Facility
01/10/1972ACRS Participation In Rule-Making Hearing
01/07/1972Report On Interim Acceptance Criteria For Emergency Core Cooling Systems For Light-Water Power Reactions
01/13/1972Report on Maine Yankee Atomic Power Station

Page Last Reviewed/Updated Friday, July 25, 2025

Page Last Reviewed/Updated Friday, July 25, 2025