Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

ACRS 1979 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title
12/13/1979 Report on TMI-2 Lessons Learned Task Force Final Report
12/13/1979 Identification Of NRC Regulatory Requirements Which Need Changing
12/11/1979 Interim Low Power Operation of Sequoyah Nuclear Power Plant, Unit 1
12/11/1979 Comments On The Pause In Licensing
12/11/1979 Letter To The Honorable John F. Ahearne
12/10/1979 Letter To Honorable Morris K. Udall
12/10/1979 Recommendations Of President's Commission Regarding ACRS Activities
11/14/1979 ACRS Action On Proposed Revisions Of Regulatory Guides
11/14/1979 NUREG-0600 Investigation into the Three Mile Island Accident by Office of Inspection and Enforcement
11/14/1979 Letter to Honorable Peter A. Bradford
10/12/1979 Systems Interactions Study For Indian Point Nuclear Generatiing Unit No. 3
10/12/1979 Systems Interactions Study for Indian Point Nuclear Generating Unit No. 3
10/11/1979 Systematic Evaluation Program
10/10/1979 Letter To Honorable Morris K. Udall
10/09/1979 Letter To Honorable Victor Gilinsky
09/21/1979 Boiling Water Reactor Design, BWR-6
08/16/1979 Pipe Cracking In Light Water Reactors
08/15/1979 Letter To Honorable Morris K. Udall
08/14/1979 Studies To Improve Reactor Safety
08/13/1979 Short-Term Recommendations of TMI-2 Lessons Learned Task Force
07/19/1979 Research Request Requirements
07/18/1979 Research To Improve Reactor Safety
07/16/1979 Bailly Generating Station, Nuclear 1
06/19/1979 ACRS Action On Proposed Revisions Of Regulatory Guides
06/18/1979 Power Level Increase at Millstone Nuclear Power Station Unit 2
05/16/1979 Interim Report No. 3 on Three Mile Island Nuclear Station Unit 2
05/16/1979 Interim Report No. 2 on Three Mile Island Nuclear Station Unit 2
05/15/1979 ACRS Review Of Proposed Rules On Shipment Of Spent Fuel
04/20/1979 Letter to Honorable Victor Gilinsky
04/10/1979 ACRS Action On Proposed Revisions Of Regulatory Guides
04/07/1979 Interim Report on Recent Accident at the Three Mile Island Nuclear Station Unit 2
03/14/1979 Combination Of Dynamic Loads As A Regulatory Design Basis
03/13/1979 Transportation Of Radioactive Materials
03/13/1979 Report on William H. Zimmer Nuclear Power Station, Unit 1
03/12/1979 ACRS Action On Proposed Revisions Of Regulatory Guides
02/16/1979 Report On The Fluor Power Services Incorporated (BOPSSAR) - Babcock-205 Standard Nuclear Steam Supply System
02/15/1979 Report on Salem Nuclear Generating Station Unit 2
01/09/1979 ACRS Action On Proposed Revisions Of Regulatory Guides