Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

ACRS 1975 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title
12/11/1975 Report on the Tyrone Energy Park, Unit 1
12/10/1975 Interim Report On Floating Nuclear Plant
12/10/1975 Report On Review Of Siting Policies for Licensing Nuclear Facilities
12/10/1975 Report on C.F. Braun Standard Turbine Island Design (Braun SAR)
11/14/1975 Interim Report on Pilgrim Nuclear Generating Station, Unit No. 2
10/17/1975 Alternatives to Staff Position Regarding Anticipated Transients Without Scram (ATWS)
10/16/1975 Report on the Sterling Power Project Nuclear Unit 1
10/16/1975 Report on the Wolf Creek Generating Station, Unit 1
10/14/1975 Report On Industrial Sabotage
10/14/1975 Proposed Amendment To General Design Criterion 50 - Working Paper C, Dated August 1, 1975
09/19/1975 Report on South Texas Project Units 1 and 2
09/18/1975 Report On Westinghouse Electric Corporation Reference Safety Analysis Report Resar-41
09/17/1975 Combustion Engineering Standard Safety Analysis Report - CESSAR-80
09/17/1975 Report on the Callaway Plant, Units 1
09/16/1975 Letter To Lee V. Gossick
09/15/1975 Report On Exxon Nuclear Company ECCS Evaluation Model For Reload cores In PWR's
07/16/1975 Report on Loft Facility
07/16/1975 Report on Rancho Seco Nuclear Generating Statio, Unit 1
07/15/1975 NRC Proposed Amendment To The Siting And Licensing Provisions Of The Atomic Energy Act Of 1954
07/15/1975 Report On Fast Flux Test Facility
06/12/1975 Report on Partial Review of Diablo Canyon Nuclear Power Station Units 1 and 2
06/12/1975 Report On Joseph M. Farley Nuclear Plant, Units No. 1 and No. 2
06/12/1975 Letter To Ralph V. Carlone
06/11/1975 Report on Washington Public Power Supply System Nuclear Power Stations WNP 1 and 4
06/10/1975 Report on St. Lucie Plant, Unit No. 1
06/09/1975 Safe End Welds on Beaver Valley, Unit 1
05/13/1975 Report on the Byron Station Units 1 and 2 and Braidwood Station Units 1 and 2
05/12/1975 Report on Perry Nuclear Power Plant, Units 1 and 2
04/16/1975 Report on Washington Public Power Supply System Nuclear Projects No. 3 and No. 5
04/14/1975 Review Of General Electric Mark III Containment design And Other BWR Containments
04/08/1975 Letter To The Honorable William A. Anders
04/08/1975 Report on Clinton Nuclear Power Plant, Units 1 and 2
04/08/1975 Reactor Safety Study, Wash-1400
04/08/1975 Emergency Planning
04/08/1975 Report On Fulton Generating Station Units 1 and 2
03/14/1975 General Electric Standard Safety Analysis Report (GESSAR-238)
03/12/1975 Report on Summit Power Station Units 1 and 2
03/12/1975 Status Of Generic Items Relating To Light-Water Reactors
03/10/1975 Emergency Core Cooling Systems Evaluation Model (ECCS-EM) For The Nonjet-Pump Boiling Water Reactor
02/14/1975 Crack Propagation Rate In Sensitized Stainless Steel
02/14/1975 Report on Salem Nuclear Generating Station Unit 1
02/08/1975 Report On Cracking In Boiling Water Reactor Piping
01/21/1975 Letter To The Honorable William A. Anders
01/14/1975 Letter To L. Manning Muntzing
01/14/1975 Locking Out Of ECCS Power Operated Valves
01/14/1975 Safety Research For Liquid-Metal Cooled Fast Breeder Reactors
01/14/1975 Report on the Site for Douglas Point Nuclear Generating Station

Page Last Reviewed/Updated Monday, July 21, 2025

Page Last Reviewed/Updated Monday, July 21, 2025