ACRS 1976 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title
12/17/1976 General Electric Standard Nuclear Steam Supply Systems (GESSAR-238 NSSS and GESSAR-251)
12/16/1976 Letter To Morris K. Udall
11/18/1976 Report On Proposed Qualification Criteria To Certify Packages For Air Transport Of Plutonium
11/18/1976 Unresolved Issues On The Draft Generic Liquid Pathway Study For The Floating Nuclear Plant
11/18/1976 Supplemental Report on Midland Plant Units 1 and 2
11/17/1976 Report On Proposed Revisions In 10 CFR 50 and 51 To Provide For Use Of Mixed Oxide Fuels
11/17/1976 Report On The Final Generic Environmental Statement On The Use Of Recycle Plutonium In Mixed Oxide
11/16/1976 Letter to Doctor G. Paulson
11/15/1976 Comments On Floating Nuclear Plant Subcommittee Meeting - Los Angeles, California, October 27-28
11/02/1976 Letter To G. R. Quittschreiber
10/26/1976 Report on Partial Review of North Anna Power Station Units 1 and 2
10/22/1976 Report on Three Mile Island Nuclear Station Unit 2
10/04/1976 Oyster Creek Nuclear Generating Station Docket No. 50-219 Anticipated Transient WO Scram-Recirculation Pump Trip
09/16/1976 Clarification Of August 17, 1976 ACRS Report On Design Provisions For Protection Against Sabotage
09/15/1976 Interim Report on Montague Power Station, Units 1 and 2
09/14/1976 Report On Westinghouse Electric Corporation's ECCS Upper Head Injection Evaluation Model
08/20/1976 Report On Hypothetical Core Disruptive Accident For Liquid Metal Fast Breeder Reactors
08/19/1976 Report on the Shippingport Atomic Power Station Light Water Breeder Reactor
08/18/1976 Report On SWESSAR-P1, Stone And Webster Engineering Corporation Balance-Of-Plant Design
08/17/1976 Design Provisions For Protection Against Sabotage
08/17/1976 Letter To Honorable Morris K. Udall
07/14/1976 Report OnWestinghouse Electric Corporation Reference Safety Analysis Report, RESAR-3S
07/14/1976 Letter To Honorable Morris K. Udall
07/13/1976 Letter to Honorable Les Aspin
06/11/1976 Report On SWESSAR-P1, Stone And Webster Engineering Corporation Balance-Of-Plant Design
06/09/1976 Report on Zion Station Units 1 and 2
06/07/1976 Interim Report On Floating Nuclear Plant
05/28/1976 Activities Of The Advisory Committee On Reactor Safeguards (ACRS)
05/19/1976 Report On Nuclear Reactor Inspection
05/13/1976 Report on Hartsville Nuclear Plants Units A-1, A-2, B-1, and B-2
05/12/1976 Report on Koshkonog Nuclear Plant, Units 1 and 2
04/16/1976 Status Of Generic Items Relating To Light-Water Reactors-Report No. 4
04/12/1976 Letter To George F. Murphy, JR.
03/12/1976 ACRS Review Of SWESSAR-P1 - CESSAR-80
03/12/1976 Report on Containment System Modifications, Vermont Yankee Nuclear Power Station
03/12/1976 Recirculation Pump Trip to Help Limit the Consequences of an ATWS Event in BWRs
03/11/1976 Report on Donald C. Cook Nuclear Plant Unit No. 1
03/11/1976 Report on Proposed Restoration and Operational Testing of Browns Ferry Nuclear Plant, Units 1 and 2
02/11/1976 Report On Stress Corrosion In Boiling Water Reactors
02/11/1976 Report On SWESSAR-P1, Stone And Webster Engineering Corporation Balance-Of-Plant Design
02/09/1976 Letter To Honorable William A. Anders
01/14/1976 Interim Report On Anticipated Transients Without Scram (ATWS)

Page Last Reviewed/Updated Monday, July 21, 2025