The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

ACRS 1976 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title
12/17/1976 General Electric Standard Nuclear Steam Supply Systems (GESSAR-238 NSSS and GESSAR-251)
12/16/1976 Letter To Morris K. Udall
11/18/1976 Report On Proposed Qualification Criteria To Certify Packages For Air Transport Of Plutonium
11/18/1976 Unresolved Issues On The Draft Generic Liquid Pathway Study For The Floating Nuclear Plant
11/18/1976 Supplemental Report on Midland Plant Units 1 and 2
11/17/1976 Report On Proposed Revisions In 10 CFR 50 and 51 To Provide For Use Of Mixed Oxide Fuels
11/17/1976 Report On The Final Generic Environmental Statement On The Use Of Recycle Plutonium In Mixed Oxide
11/16/1976 Letter to Doctor G. Paulson
11/15/1976 Comments On Floating Nuclear Plant Subcommittee Meeting - Los Angeles, California, October 27-28
11/02/1976 Letter To G. R. Quittschreiber
10/26/1976 Report on Partial Review of North Anna Power Station Units 1 and 2
10/22/1976 Report on Three Mile Island Nuclear Station Unit 2
10/04/1976 Oyster Creek Nuclear Generating Station Docket No. 50-219 Anticipated Transient WO Scram-Recirculation Pump Trip
09/16/1976 Clarification Of August 17, 1976 ACRS Report On Design Provisions For Protection Against Sabotage
09/15/1976 Interim Report on Montague Power Station, Units 1 and 2
09/14/1976 Report On Westinghouse Electric Corporation's ECCS Upper Head Injection Evaluation Model
08/20/1976 Report On Hypothetical Core Disruptive Accident For Liquid Metal Fast Breeder Reactors
08/19/1976 Report on the Shippingport Atomic Power Station Light Water Breeder Reactor
08/18/1976 Report On SWESSAR-P1, Stone And Webster Engineering Corporation Balance-Of-Plant Design
08/17/1976 Design Provisions For Protection Against Sabotage
08/17/1976 Letter To Honorable Morris K. Udall
07/14/1976 Report OnWestinghouse Electric Corporation Reference Safety Analysis Report, RESAR-3S
07/14/1976 Letter To Honorable Morris K. Udall
07/13/1976 Letter to Honorable Les Aspin
06/11/1976 Report On SWESSAR-P1, Stone And Webster Engineering Corporation Balance-Of-Plant Design
06/09/1976 Report on Zion Station Units 1 and 2
06/07/1976 Interim Report On Floating Nuclear Plant
05/28/1976 Activities Of The Advisory Committee On Reactor Safeguards (ACRS)
05/19/1976 Report On Nuclear Reactor Inspection
05/13/1976 Report on Hartsville Nuclear Plants Units A-1, A-2, B-1, and B-2
05/12/1976 Report on Koshkonog Nuclear Plant, Units 1 and 2
04/16/1976 Status Of Generic Items Relating To Light-Water Reactors-Report No. 4
04/12/1976 Letter To George F. Murphy, JR.
03/12/1976 ACRS Review Of SWESSAR-P1 - CESSAR-80
03/12/1976 Report on Containment System Modifications, Vermont Yankee Nuclear Power Station
03/12/1976 Recirculation Pump Trip to Help Limit the Consequences of an ATWS Event in BWRs
03/11/1976 Report on Donald C. Cook Nuclear Plant Unit No. 1
03/11/1976 Report on Proposed Restoration and Operational Testing of Browns Ferry Nuclear Plant, Units 1 and 2
02/11/1976 Report On Stress Corrosion In Boiling Water Reactors
02/11/1976 Report On SWESSAR-P1, Stone And Webster Engineering Corporation Balance-Of-Plant Design
02/09/1976 Letter To Honorable William A. Anders
01/14/1976 Interim Report On Anticipated Transients Without Scram (ATWS)

Page Last Reviewed/Updated Monday, July 21, 2025