Date |
Title |
12/17/1976 |
General Electric Standard Nuclear Steam Supply Systems (GESSAR-238 NSSS and GESSAR-251) |
12/16/1976 |
Letter To Morris K. Udall |
11/18/1976 |
Report On Proposed Qualification Criteria To Certify Packages For Air Transport Of Plutonium |
11/18/1976 |
Unresolved Issues On The Draft Generic Liquid Pathway Study For The Floating Nuclear Plant |
11/18/1976 |
Supplemental Report on Midland Plant Units 1 and 2 |
11/17/1976 |
Report On Proposed Revisions In 10 CFR 50 and 51 To Provide For Use Of Mixed Oxide Fuels |
11/17/1976 |
Report On The Final Generic Environmental Statement On The Use Of Recycle Plutonium In Mixed Oxide |
11/16/1976 |
Letter to Doctor G. Paulson |
11/15/1976 |
Comments On Floating Nuclear Plant Subcommittee Meeting - Los Angeles, California, October 27-28 |
11/02/1976 |
Letter To G. R. Quittschreiber |
10/26/1976 |
Report on Partial Review of North Anna Power Station Units 1 and 2 |
10/22/1976 |
Report on Three Mile Island Nuclear Station Unit 2 |
10/04/1976 |
Oyster Creek Nuclear Generating Station Docket No. 50-219 Anticipated Transient WO Scram-Recirculation Pump Trip |
09/16/1976 |
Clarification Of August 17, 1976 ACRS Report On Design Provisions For Protection Against Sabotage |
09/15/1976 |
Interim Report on Montague Power Station, Units 1 and 2 |
09/14/1976 |
Report On Westinghouse Electric Corporation's ECCS Upper Head Injection Evaluation Model |
08/20/1976 |
Report On Hypothetical Core Disruptive Accident For Liquid Metal Fast Breeder Reactors |
08/19/1976 |
Report on the Shippingport Atomic Power Station Light Water Breeder Reactor |
08/18/1976 |
Report On SWESSAR-P1, Stone And Webster Engineering Corporation Balance-Of-Plant Design |
08/17/1976 |
Design Provisions For Protection Against Sabotage |
08/17/1976 |
Letter To Honorable Morris K. Udall |
07/14/1976 |
Report OnWestinghouse Electric Corporation Reference Safety Analysis Report, RESAR-3S |
07/14/1976 |
Letter To Honorable Morris K. Udall |
07/13/1976 |
Letter to Honorable Les Aspin |
06/11/1976 |
Report On SWESSAR-P1, Stone And Webster Engineering Corporation Balance-Of-Plant Design |
06/09/1976 |
Report on Zion Station Units 1 and 2 |
06/07/1976 |
Interim Report On Floating Nuclear Plant |
05/28/1976 |
Activities Of The Advisory Committee On Reactor Safeguards (ACRS) |
05/19/1976 |
Report On Nuclear Reactor Inspection |
05/13/1976 |
Report on Hartsville Nuclear Plants Units A-1, A-2, B-1, and B-2 |
05/12/1976 |
Report on Koshkonog Nuclear Plant, Units 1 and 2 |
04/16/1976 |
Status Of Generic Items Relating To Light-Water Reactors-Report No. 4 |
04/12/1976 |
Letter To George F. Murphy, JR. |
03/12/1976 |
ACRS Review Of SWESSAR-P1 - CESSAR-80 |
03/12/1976 |
Report on Containment System Modifications, Vermont Yankee Nuclear Power Station |
03/12/1976 |
Recirculation Pump Trip to Help Limit the Consequences of an ATWS Event in BWRs |
03/11/1976 |
Report on Donald C. Cook Nuclear Plant Unit No. 1 |
03/11/1976 |
Report on Proposed Restoration and Operational Testing of Browns Ferry Nuclear Plant, Units 1 and 2 |
02/11/1976 |
Report On Stress Corrosion In Boiling Water Reactors |
02/11/1976 |
Report On SWESSAR-P1, Stone And Webster Engineering Corporation Balance-Of-Plant Design |
02/09/1976 |
Letter To Honorable William A. Anders |
01/14/1976 |
Interim Report On Anticipated Transients Without Scram (ATWS) |