Date Title
12/11/1975 Report on the Tyrone Energy Park, Unit 1
12/10/1975 Interim Report On Floating Nuclear Plant
12/10/1975 Report On Review Of Siting Policies for Licensing Nuclear Facilities
12/10/1975 Report on C.F. Braun Standard Turbine Island Design (Braun SAR)
11/14/1975 Interim Report on Pilgrim Nuclear Generating Station, Unit No. 2
10/17/1975 Alternatives to Staff Position Regarding Anticipated Transients Without Scram (ATWS)
10/16/1975 Report on the Sterling Power Project Nuclear Unit 1
10/16/1975 Report on the Wolf Creek Generating Station, Unit 1
10/14/1975 Report On Industrial Sabotage
10/14/1975 Proposed Amendment To General Design Criterion 50 - Working Paper C, Dated August 1, 1975
09/19/1975 Report on South Texas Project Units 1 and 2
09/18/1975 Report On Westinghouse Electric Corporation Reference Safety Analysis Report Resar-41
09/17/1975 Combustion Engineering Standard Safety Analysis Report - CESSAR-80
09/17/1975 Report on the Callaway Plant, Units 1
09/16/1975 Letter To Lee V. Gossick
09/15/1975 Report On Exxon Nuclear Company ECCS Evaluation Model For Reload cores In PWR's
07/16/1975 Report on Loft Facility
07/16/1975 Report on Rancho Seco Nuclear Generating Statio, Unit 1
07/15/1975 NRC Proposed Amendment To The Siting And Licensing Provisions Of The Atomic Energy Act Of 1954
07/15/1975 Report On Fast Flux Test Facility
06/12/1975 Report on Partial Review of Diablo Canyon Nuclear Power Station Units 1 and 2
06/12/1975 Report On Joseph M. Farley Nuclear Plant, Units No. 1 and No. 2
06/12/1975 Letter To Ralph V. Carlone
06/11/1975 Report on Washington Public Power Supply System Nuclear Power Stations WNP 1 and 4
06/10/1975 Report on St. Lucie Plant, Unit No. 1
06/09/1975 Safe End Welds on Beaver Valley, Unit 1
05/13/1975 Report on the Byron Station Units 1 and 2 and Braidwood Station Units 1 and 2
05/12/1975 Report on Perry Nuclear Power Plant, Units 1 and 2
04/16/1975 Report on Washington Public Power Supply System Nuclear Projects No. 3 and No. 5
04/14/1975 Review Of General Electric Mark III Containment design And Other BWR Containments
04/08/1975 Letter To The Honorable William A. Anders
04/08/1975 Report on Clinton Nuclear Power Plant, Units 1 and 2
04/08/1975 Reactor Safety Study, Wash-1400
04/08/1975 Emergency Planning
04/08/1975 Report On Fulton Generating Station Units 1 and 2
03/14/1975 General Electric Standard Safety Analysis Report (GESSAR-238)
03/12/1975 Report on Summit Power Station Units 1 and 2
03/12/1975 Status Of Generic Items Relating To Light-Water Reactors
03/10/1975 Emergency Core Cooling Systems Evaluation Model (ECCS-EM) For The Nonjet-Pump Boiling Water Reactor
02/14/1975 Crack Propagation Rate In Sensitized Stainless Steel
02/14/1975 Report on Salem Nuclear Generating Station Unit 1
02/08/1975 Report On Cracking In Boiling Water Reactor Piping
01/21/1975 Letter To The Honorable William A. Anders
01/14/1975 Letter To L. Manning Muntzing
01/14/1975 Locking Out Of ECCS Power Operated Valves
01/14/1975 Safety Research For Liquid-Metal Cooled Fast Breeder Reactors
01/14/1975 Report on the Site for Douglas Point Nuclear Generating Station