Date |
Title |
12/11/1975 |
Report on the Tyrone Energy Park, Unit 1 |
12/10/1975 |
Interim Report On Floating Nuclear Plant |
12/10/1975 |
Report On Review Of Siting Policies for Licensing Nuclear Facilities |
12/10/1975 |
Report on C.F. Braun Standard Turbine Island Design (Braun SAR) |
11/14/1975 |
Interim Report on Pilgrim Nuclear Generating Station, Unit No. 2 |
10/17/1975 |
Alternatives to Staff Position Regarding Anticipated Transients Without Scram (ATWS) |
10/16/1975 |
Report on the Sterling Power Project Nuclear Unit 1 |
10/16/1975 |
Report on the Wolf Creek Generating Station, Unit 1 |
10/14/1975 |
Report On Industrial Sabotage |
10/14/1975 |
Proposed Amendment To General Design Criterion 50 - Working Paper C, Dated August 1, 1975 |
09/19/1975 |
Report on South Texas Project Units 1 and 2 |
09/18/1975 |
Report On Westinghouse Electric Corporation Reference Safety Analysis Report Resar-41 |
09/17/1975 |
Combustion Engineering Standard Safety Analysis Report - CESSAR-80 |
09/17/1975 |
Report on the Callaway Plant, Units 1 |
09/16/1975 |
Letter To Lee V. Gossick |
09/15/1975 |
Report On Exxon Nuclear Company ECCS Evaluation Model For Reload cores In PWR's |
07/16/1975 |
Report on Loft Facility |
07/16/1975 |
Report on Rancho Seco Nuclear Generating Statio, Unit 1 |
07/15/1975 |
NRC Proposed Amendment To The Siting And Licensing Provisions Of The Atomic Energy Act Of 1954 |
07/15/1975 |
Report On Fast Flux Test Facility |
06/12/1975 |
Report on Partial Review of Diablo Canyon Nuclear Power Station Units 1 and 2 |
06/12/1975 |
Report On Joseph M. Farley Nuclear Plant, Units No. 1 and No. 2 |
06/12/1975 |
Letter To Ralph V. Carlone |
06/11/1975 |
Report on Washington Public Power Supply System Nuclear Power Stations WNP 1 and 4 |
06/10/1975 |
Report on St. Lucie Plant, Unit No. 1 |
06/09/1975 |
Safe End Welds on Beaver Valley, Unit 1 |
05/13/1975 |
Report on the Byron Station Units 1 and 2 and Braidwood Station Units 1 and 2 |
05/12/1975 |
Report on Perry Nuclear Power Plant, Units 1 and 2 |
04/16/1975 |
Report on Washington Public Power Supply System Nuclear Projects No. 3 and No. 5 |
04/14/1975 |
Review Of General Electric Mark III Containment design And Other BWR Containments |
04/08/1975 |
Letter To The Honorable William A. Anders |
04/08/1975 |
Report on Clinton Nuclear Power Plant, Units 1 and 2 |
04/08/1975 |
Reactor Safety Study, Wash-1400 |
04/08/1975 |
Emergency Planning |
04/08/1975 |
Report On Fulton Generating Station Units 1 and 2 |
03/14/1975 |
General Electric Standard Safety Analysis Report (GESSAR-238) |
03/12/1975 |
Report on Summit Power Station Units 1 and 2 |
03/12/1975 |
Status Of Generic Items Relating To Light-Water Reactors |
03/10/1975 |
Emergency Core Cooling Systems Evaluation Model (ECCS-EM) For The Nonjet-Pump Boiling Water Reactor |
02/14/1975 |
Crack Propagation Rate In Sensitized Stainless Steel |
02/14/1975 |
Report on Salem Nuclear Generating Station Unit 1 |
02/08/1975 |
Report On Cracking In Boiling Water Reactor Piping |
01/21/1975 |
Letter To The Honorable William A. Anders |
01/14/1975 |
Letter To L. Manning Muntzing |
01/14/1975 |
Locking Out Of ECCS Power Operated Valves |
01/14/1975 |
Safety Research For Liquid-Metal Cooled Fast Breeder Reactors |
01/14/1975 |
Report on the Site for Douglas Point Nuclear Generating Station |