2014 Aircraft Impact Assessment (AIA) Inspection Reports

The purpose of inspection reports is to document the inspection scope, observation, and findings of inspections conducted by the NRC. The NRC performs inspections to oversee the commercial nuclear industry to determine whether its requirements are being met by applicants, licensees and their contractors. The NRC performs inspections to verify the quality and suitability of the aircraft impact assessment and review any issues identified during the analysis and the corrective actions associated with the issue.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Description
03/19/14

Mitsubishi Nuclear Energy Systems, Inc. (Mitsubishi), Arlington, VA, inspection of the U.S. Advanced Pressurized-Water Reactor Aircraft Impact Assessment. The purpose of the inspection is to assess Mitsubishi's compliance with the provisions of Title 10 of the Code of Federal Regulations (10 CFR) 50.150, "Aircraft Impact Assessment."

Page Last Reviewed/Updated Friday, September 16, 2022