2010 Aircraft Impact Assessment (AIA) Inspection Reports

The purpose of inspection reports is to document the inspection scope, observation, and findings of inspections conducted by the NRC. The NRC performs inspections to oversee the commercial nuclear industry to determine whether its requirements are being met by applicants, licensees and their contractors. The NRC performs inspections to verify the quality and suitability of the aircraft impact assessment and review any issues identified during the analysis and the corrective actions associated with the issue.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Description
10/2010

Westinghouse Electric Company (WEC),amendment application to the design certification rule for the AP1000 - Inspection of the AIA to support the AP1000 DCR amendment application in accordance with the requirements of 10 CFR 50.150 at the WEC facilities in Cranberry Township, PA

10/2010

General Electric Hitachi (GEH) Nuclear Energy Corporation, ESBWR Design Certification Application - Inspection of the AIA to support the ESBWR DC application in accordance with the requirements of 10 CFR 50.150 at the GEH facilities in Wilmington, NC.

08/2010

South Texas Project Nuclear Operating Company, amendment application to the design certification rule for the U.S. Advance Boiling Water Reactor - Inspection of the AIA to support the STP ABWR application in accordance with the requirements of 10 CFR 50.150 at the STPOC facilities in Bay City, TX.

Page Last Reviewed/Updated Friday, September 16, 2022