Safety & Security Culture
Commission Briefing
Shawn W. Seeley, Chair
Organization of Agreement States
March 30, 2010
• In favor of policy statement
• Regulation too formal
• Agreement States: co-regulator in process
• Workshop
– Overall a success
– Amazing proc...
RISK-INFORMING THE SRP - IMPROVING NEW REACTOR REVIEW EFFICIENCY
THROUGH APPLICATION OF RISK INSIGHTS
Last Update:
09/15/07
Lead NRO Division: DNRL
Supporting Division: DSRA
# NRO/DSRA MILESTONES DATE
(Target/Complete)
1 Form technical team to identify pos...
U.S. NUCLEAR REGULATORY COMMISSION0; REGULATORY GUIDE "OFFICE OF NUCLEAR REGULATORY RESEARCH REGULATORY GUIDE 1.180 (Draft was issued as DG-1029) GUIDELINES FOR EVALUATING ELECTROMAGNETIC AND RADIO-FREQUENCY INTERFERENCE IN SAFETY-RELATED INSTRUMENTATION AND CONTROL SYSTEMS A....
24336 Federal Register / Vol. 61, No. 94 / Tuesday, May 14, 1996 / Notices
1 Throughout this Policy Statement the terms
‘‘concerns,’’ ‘‘safety concerns’’ and ‘‘safety
problem’’ refer to potential or actual issues within
the Commission’s jurisdiction involving operations,
rad...
1-1 August 6, 2004
APPLICABILITY OF OLD AND NEW 10 CFR PART 2 TO NRC PROCEEDINGS*
The following table associates a variety or potential notice, licensing, and regulatory scenarios
with the applicable version of 10 CFR Part 2.
Proceeding Status Old Part 2 New Part 2
1. App...
1IEEE publications may be purchased from the IEEE Service Center, 445 Hoes Lane, Piscataway, NJ 08855-1331.Regulatory guides are issued to describe and make available to the public such information as methods acceptable to the NRC staff for implementing specificparts of the NR...
Initiative: Risk-Informing Digital Instrumentation and Control
Lead Office/Division: Task Working Group-3 (TWG-3) NRR/DRA
Supporting Offices/Divisions: RES, NRO and NRR
Description
The basis for the digital instrumentation and control initiative was derived from...
Regulatory guides are issued to describe and make available to the public such information as methods acceptable to the NRC staff for implementing specificparts of the NRC’s regulations, techniques used by the staff in evaluating specific problems or postulated accidents, and...
U.S. NUCLEAR REGULATORY COMMISSION REGULATORY GUIDE 1.180, REVISION 2 Issue Date: December 2019 Technical Lead: David Dawood Written suggestions regarding this guide or development of new guides may be submitted through the NRC’s public Web site in the NRC Library at https...
U.S. NUCLEAR REGULATORY COMMISSIONREGULATORY<**+GUIDEOFFICE OF NUCLEAR REGULATORY RESEARCHREGULATORY GUIDE 1.180(Draft was issued as DG.1029)GUIDELINES FOR EVALUATING ELECTROMAGNETIC ANDRADIO-FREQUENCY INTERFERENCEIN SAFETY-RELATED INSTRUMENTATION AND CONTROL SYSTEMSA. INTRODU...
This regulatory guide is being issued in draft form to involve the public in the early stages of the development of a regulatory position in this area. It hasnot received complete staff review or approval and does not represent an official NRC staff position.Public comments a...
U.S. NUCLEAR REGULATORY COMMISSIONt REGULATORY GUIDE # 'OFFICE OF NUCLEAR REGULATORY RESEARCH REGULATORY GUIDE 1.180 (Draft was issued as DG-1029) GUIDELINES FOR EVALUATING ELECTROMAGNETIC AND RADIO-FREQUENCY INTERFERENCE IN SAFETY-RELATED INSTRUMENTATION AND CONTROL SYSTEMS A...
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 25, 2017 MEMORANDUM TO: Brian E. Thomas, Director Division of Engineering Office of Nuclear Regulatory Research FROM: Ian C. Jung, Chief /RA/ Instrumentation, Controls, and Electrical ...
Regulatory Guide Periodic Review Regulatory Guide Number 1.180, Revision 1 Title: Guidelines for Evaluating Electromagnetic and Radio-Frequency Interference in Safety-Related Instrumentation and Control Systems Office/division/branch: RES/DE/ICEEB Technical Lead: David Da...
R ES-00. ,5R.0,_ U.S. NUCLEAR REGULATORY COMMISSION March 2000 OFFICE OF NUCLEAR REGULATORY RESEARCH Division 1 Draft DG-1075 DRAFT REGULATORY GUIDE __Contact: R.L. Sullivan (301)415-1123 DRAFT REGULATORY GUIDE DG-1075 (Proposed Revision 4 to Regulatory Guide 1 .101) EMERGENC...
~Q~AN&NTS Report PR028559 RG 1.180Page 1 of 28NationalTechnicalSystems1701 East Piano PKWY Suite # 150Piano, Texas 75074Tel: 972- 509- 2566Fax: 972-509-0073REGULATORY GUIDE 1.180CS114 SUSCEPTIBILITY TESTSONUS NRC HFC-6000 Safety Qualification SystemPart Number: ERD111/ERD921Dr...
The U.S. Nuclear Regulatory Commission (NRC) issues regulatory guides to describe and make available to the public methods that the NRC staffconsiders acceptable for use in implementing specific parts of the agency’s regulations, techniques that the staff uses in evaluating sp...
REGULATORY ANALYSIS DRAFT REGULATORY GUIDE DG-1333 GUIDELINES FOR EVALUATING ELECTROMAGNETIC AND RADIO-FREQUENCY INTERFERENCE IN SAFETY-RELATED INSTRUMENTATION AND CONTROL SYSTEMS (Proposed revision 2 to RG 1.180, dated October 2003) 1. Statement of the Problem The cur...
U.S. NUCLEAR REGULATORY COMMISSION August 2014OFFICE OF NUCLEAR REGULATORY RESEARCH Revision 36REGULATORY GUIDE Technical LeadWallace Norris This regulatory guide lists the ASME Section III Code Cases that have been determined by the NRC to be acceptable alternatives to app...
Technical Basis for Revision of Regulatory Guide (RG) 1.180 – Guidelines for Evaluating Electromagnetic and Radio-Frequency Interference (EMI/RFI) in Safety-Related Instrumentation and Control Systems (I&C)David DawoodU.S. Nuclear Regulatory CommissionRichard WoodThe Universit...
This regulatory guide is being issued in draft form to involve the public in the early stages of the development of a regulatory position in this area. It has not received final staff review or approval and does not represent an official NRC final staff position. Public comm...
TitleDataset Last UpdatedDatasetAdvanced Reactor Integrated Schedule Data Source11/08/2021Cancelled U.S. Commercial Nuclear Power Reactors – Part 50: Domestic Licensing of Production and Utilization Facilities and Part 52 Licenses Certifi...
43' % U.S. NUCLEAR REGULATORY COMMISSION December 19,99 OFFICE OF NUCLEAR REGULATORY RESEARCH Division 1 Draft DG-1086 DRAFT REGULATORY GUIDE Contact: M. J. Davis, 301-415-1016 DRAFT REGULATORY GUIDE DG-1086 CRITERION FOR TRIGGERING A REVIEW UNDER 10 CFR 50.80 FOR NON-OWNER O...
North Anna Nuclear Power
Station Seismic Event
R. William Borchardt
Executive Director for Operations
October 21, 2011
Agenda
• NRC Initial Response
• Restart Requirements
• Technical Review
• Restart Inspection
• Path Forward
• Post Startup Activiti...
Risk-Informed Emergency
Core Cooling
Requirements
(10 CFR 50.46a)
March 24, 2011
Speakers and Topics
• Opening: Bill Borchardt, EDO
• Introduction: Eric Leeds, NRR
• Rule Concept and Staff Views:
William Ruland, NRR/DSS
• Background and Rule Requirements:
Ri...