The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

News Releases - 2004

JanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberOctoberNovemberDecember

 

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

 

December 2004
Date Document Number Description
12/30/2004 04-167 NRC Restores Documents on LES, USEC and New Reactors to Public Availability
12/30/2004 04-166 NRC Renews License for Interim Spent Fuel Storage Installation at G.E. Morris Facility in Illinois
12/28/2004 I-04-058 NRC to Discuss Results of Special Inspection at Hope Creek Plant
12/22/2004 04-165 NRC Extends Public Comment Period on Proposed Uranium Enrichment Plant in New Mexico until Jan. 7
12/20/2004 04-164 NRC Issues Draft Safety Evaluation for North Anna Early Site Permit Application
12/17/2004 II-04-058 NRC Staff Seeks Input On Browns Ferry Nuclear Plant Draft Environmental Impact Statement For License Renewal
12/16/2004 I-04-057 NRC Finds Violations of Low Safety Significance at Vermont Yankee Nuclear Power Plant
12/16/2004 04-163 NRC Plans to Issue License Renewal Exemption for Oyster Creek Nuclear Station
12/15/2004 04-162 NRC Enhances Public Meeting Schedule on its Web Site
12/15/2004 04-161 NRC Expands Eligibility Categories for Seeking Access to Classified Information
12/15/2004 04-160 NRC to Hold 17th Annual Regulatory Information Conference March 8 - 10 in Rockville, MD
12/14/2004 04-159 NRC Meeting with PSEG Nuclear Dec. 17 Concerning Hope Creek Maintenance Issues
12/13/2004 04-158 NRC Advisory Subcommittee to Discuss Proposed MOX Facility Report Dec. 15-16 in Rockville, Maryland
12/10/2004 I-04-056 NRC Rejects License Renewal Applications for Pennsylvania Company
12/09/2004 II-04-057 NRC Staff to Meet with TVA to Discuss Browns Ferry Nuclear Plant License Renewal Inspection
12/09/2004 04-157 NRC Approves Evaluation Method for Analyzing Reactor Containment Sump Performance
12/09/2004 I-04-055 NRC to Hold Public Meetings Regarding Draft Environmental Report for Millstone Nuclear Plant License Renewal Application
12/09/2004 IV-04-046 NRC Assigns New Resident Inspector to Palo Verde Nuclear Generating Station
12/08/2004 04-156 NRC Approves 40-Year License Renewal for Independent Spent Fuel Storage Installation at Surry Nuclear Plant
12/08/2004 04-155 NRC Advisory Committee on Nuclear Waste to Meet Dec. 13-14 in Rockville, Maryland
12/07/2004 04-154 NRC to Hold Predecisional Enforcement Conference on Duke Amendment Request for Catawba Nuclear Station
12/07/2004 04-153 NRC Restores Online Availability of Large Number of Reactor-Related Documents
12/07/2004 04-152 NRC Seeks Public Input on North Anna Early Site Permit Application; Meeting to Be Held Jan. 19
12/07/2004 IV-04-045 NRC Staff to Meet with Entergy Operations, Inc. to Discuss Arkansas Nuclear One License Renewal Inspections
12/03/2004 II-04-056 NRC to Meet with U.S. Enrichment Corporation to Discuss Performance at Paducah Gaseous Diffusion Plant
12/02/2004 I-04-054 NRC Issues Two Inspection Reports on Vermont Yankee; Schedules Meeting
12/01/2004 04-151 NRC Announces Opportunity for Hearing on Application to Renew Operating Licenses for Brunswick Nuclear Power Plant
12/01/2004 04-150 NRC Licenses Spent Nuclear Fuel Storage Facility at Idaho National Engineering and Environmental Laboratory
12/01/2004 III-04-051 NRC to Discuss Final Decommissioning of Twin Cities Army Ammunition Plant
November 2004
Date Document Number Description
11/30/2004 III-04-050 NRC Davis-Besse Oversight Panel to Meet Dec. 6 in Ohio
11/29/2004 04-149 NRC Advisory Committee on Reactor Safeguards to Meet Dec. 2-4 in Rockville, Maryland
11/24/2004 I-04-053 NRC to Discuss Performance Improvement Actions at Salem and Hope Creek Nuclear Power Plants
11/24/2004 04-147 NRC Increases Civil Monetary Penalties to Reflect Inflation
11/23/2004 04-148 NRC Revises Regulations for Structures, Systems and Components for Nuclear Power Plants
11/19/2004 04-146 NRC Extends Comment Period for Environmental Impact Statement on Proposed Uranium Facility in New Mexico
11/18/2004 04-145 Dr. Michael T. Ryan and Allen G. Croff Elected to New Positions on NRC Advisory Committee
11/16/2004 04-144 NRC Restores Additional, Hearing-Related Documents to its Web Site
11/15/2004 04-143 NRC to Hold Public Meeting Nov. 22-23 on Analyzing Nuclear Power Plant Fire Hazards
11/10/2004 04-142 NRC Advisory Committee on Nuclear Waste to Meet Nov. 16-18 in Rockville, Maryland
11/09/2004 III-04-049 NRC to Meet with FirstEnergy on Nuclear Plant Performance
11/08/2004 04-141 NRC Seeks Public Comment on Implementation of Reactor Oversight Process
11/05/2004 I-04-052 NRC Postpones Two Meetings with Entergy Scheduled for Nov. 9 and Issues Preliminary Results for Engineering Inspection at VY
11/04/2004 04-140 NRC Restores Various Documents Removed from Web Site for Security Review
11/03/2004 II-04-055 NRC to Meet with U.S. Enrichment Corporation Officials November 9 to Discuss Performance at Portsmouth Gaseous Diffusion Plant
11/03/2004 I-04-051 NRC Staff to Meet with Entergy Nuclear Vermont Yankee to Discuss Preliminary Results of Two Inspections
October 2004
Date Document Number Description
10/28/2004 III-04-048 NRC Seeks Public Input on Environmental Impact Statement for Proposed D.C. Cook Nuclear Plant License Renewal
10/28/2004 I-04-050 Nuclear Gauge Reported Stolen in Virginia; Recovery of Device is Sought
10/28/2004 04-139 NRC Approves Stretch Power Uprate for Indian Point Unit 2
10/28/2004 04-138 NRC Renews Licenses for Dresden and Quad Cities Nuclear Power Plants for an Additional 20 Years
10/28/2004 04-137 Cornell University to Provide Neutral Mediators for NRC's Alternative Dispute Resolution Program
10/27/2004 II-04-054 NRC Staff Schedules Public Meeting for November 4 to Discuss License Renewal Process for Brunswick Nuclear Plant
10/27/2004 IV-04-044 NRC to Conduct Special Inspection at Humboldt Bay
10/26/2004 I-04-049 NRC Proposes $44,400 Civil Penalty for Baxter Healthcare Corp. over Irradiator Event at Puerto Rico Facility
10/26/2004 04-136 NRC Advisory Committee on Reactor Safeguards to Meet Nov. 4-6 in Rockville, Maryland
10/25/2004 04-135 NRC Initiates Additional Security Review of Publicly Available Documents; Temporarily Suspends Agency's On-line Library
10/25/2004 04-134 NRC Announces Availability of License Renewal Application for Brunswick Steam Electric Plant, Units 1 and 2
10/21/2004 IV-04-043 NRC Staff to Meet with Energy Northwest to Discuss Columbia Generating Station Issues
10/19/2004 III-04-047 NRC Staff to Meet Oct. 28 with FirstEnergy Officials to Review Performance Improvement Activities at Perry Nuclear Plant
10/19/2004 I-04-048 New Location Announced for Oral Arguments on Petitions Seeking Hearings on Proposed Vermont Yankee Power Uprate
10/18/2004 II-04-053 NRC to Meet with Framatome Nuclear Fuel Plant Officials October 28 to Discuss Facility Safety Performance
10/15/2004 04-133 NRC Extends Review Schedule for Vermont Yankee Nuclear Power Plant Uprate Request
10/15/2004 I-04-047 NRC, Dominion Nuclear to Discuss Inspections on Millstone License Renewal on October 20th
10/14/2004 I-04-046 NRC Begins Special Inspection at Hope Creek Nuclear Power Plant
10/14/2004 04-132 NRC to Hold Public Meeting on Proposed Rule on Requirements for Export or Import of Radioactive Materials
10/14/2004 04-131 NRC Advisory Committee on Nuclear Waste to Meet Oct. 19-21 in Rockville, Maryland
10/14/2004 IV-04-042 NRC Proposes $3,000 Fine Against Integrated Production Services, Inc.
10/12/2004 04-130 NRC Approves Third License Amendment for Nuclear Fuel Services' Blended Low-Enriched Uranium Project
10/12/2004 I-04-045 ASLB to Hear Oral Arguments on Petitions Seeking Hearings on Proposed Vermont Yankee Power Uprate
10/07/2004 04-129 NRC Sets Schedule for Review of USEC Application; Offers Opportunity to Request Participation in Hearing
10/07/2004 04-128 NRC Proposes $9,600 Fine Against Virginia Firm in Whistleblower Case
10/06/2004 04-127 NRC Staff to Hold Public Meeting in Atlanta Oct. 13-15 on Fire Protection Standard, Inspections
10/06/2004 04-126 Dr. Richard S. Denning Appointed to NRC Advisory Committee
10/05/2004 04-125 NRC Chairman Discusses Nuclear Plant Security at Americas Nuclear Energy Symposium
10/04/2004 04-124 Public Meeting Oct. 14 in Eunice, N.M., to Discuss Draft Environmental Impact Statement for Proposed Uranium Plant
10/04/2004 IV-04-041 NRC Staff Seeks Public Comment on Draft Report that Finds ANO-2 License Renewal Environmentally Acceptable
10/01/2004 04-123 NRC Web Page Describes Process for Updating Guidance on Reactor License Renewal
10/01/2004 04-122 NRC Offers Opportunity for Hearing on Relicensing Application for NIST Test Reactor
September 2004
Date Document Number Description
09/30/2004 04-121 NRC Advisory Committee on Medical Uses of Isotopes to Hold a Teleconference Oct. 5
09/30/2004 04-120 NRC Annual Nuclear Safety Research Conference to Be Held Oct. 25-27 in Washington, D.C.
09/28/2004 II-04-052 NRC Cites Oconee Nuclear Plant for Inspection Finding of Low to Moderate Safety Significance
09/28/2004 IV-04-040 NRC Names John Hanna Senior Resident Inspector at Fort Calhoun Nuclear Plant
09/24/2004 04-119 NRC Advisory Committee on Reactor Safeguards to Meet Oct. 7-9 in Rockville, Maryland
09/22/2004 III-04-046 NRC Davis-Besse Oversight Panel to Meet Sept. 28 in Ohio
09/22/2004 04-118 NRC to Hold Public Meeting Sept. 30 to Discuss Certain Fiscal Year 2005 Emphasis Areas
09/21/2004 II-04-050 NRC Staff to Meet with Southern Nuclear to Discuss Second Farley Plant License Renewal Inspection
09/21/2004 II-04-051 NRC Staff and Duke Energy to Discuss Corrective Actions for Two Oconee Nuclear Plant White Findings
09/20/2004 I-04-044 NRC, Exelon to Discuss Apparent Violation at Oyster Creek Plant
09/20/2004 04-117 Note to Editors: NRC Issues Preliminary Risk Analysis of the Combined Safety Issues at Davis-Besse
09/17/2004 II-04-049 NRC to Meet with Honeywell Officials on September 30 to Discuss Long-Term Improvement Plans for Metropolis Plant
09/17/2004 II-04-048 NRC Cites Surry Nuclear Power Plant for Inspection Findings of Low to Moderate Safety Significance
09/17/2004 IV-04-039 NRC to Meet with Pacific Gas & Electric to Discuss Radioactive Material Control Program at Humboldt Bay Nuclear Plant
09/17/2004 IV-04-038 NRC to Discuss Safety Significance of Inspection Finding at Cooper Nuclear Station
09/16/2004 04-116 NRC Advisory Committee on Nuclear Waste to Meet Sept. 22-23 in Las Vegas, Nevada
09/16/2004 I-04-043 NRC, FPL to Discuss Apparent Violation at Seabrook Nuclear Plant
09/15/2004 IV-04-037 NRC Dispatches Staff in Preparation for Hurricane Ivan
09/15/2004 04-115 NRC Proposes Tougher Export-Import Requirements for High-Risk Radioactive Materials
09/14/2004 04-113 NRC Testifies on Nuclear Power Plant Security Before Congressional Subcommittee
09/14/2004 IV-04-036 NRC Assigns New Resident Inspector to Callaway Nuclear Plant
09/14/2004 04-114 NRC Issues Generic Letter Concerning Potential Reactor Containment Sump Issue
09/13/2004 04-111 Revised: NRC Modifies Availability of Security Information for All Nuclear Plants
09/13/2004 04-112 NRC Issues Final Safety Evaluation Report and Final Design Approval for Westinghouse AP1000 Advanced Reactor Design
09/09/2004 I-04-042 NRC Seeks Public Input on Environmental Impact Statement for Proposed Nine Mile Point Nuclear Plant License Renewal
09/09/2004 04-110 NRC Unveils New Emergency Preparedness and Incident Response Web Page
09/08/2004 04-109 NRC Seeks Public Comment on Decommissioning Plan for University of Michigan Research Reactor
09/08/2004 04-108 NRC Issues Third National Report for the Convention on Nuclear Safety
09/07/2004 04-107 NRC Releases York, Pa., Site for Unrestricted Use
09/02/2004 04-106 NRC Issues Mid-Cycle Assessments for All Nuclear Plants
09/01/2004 04-105 NRC Advisory Committee on Reactor Safeguards to Meet Sept. 9-11 in Rockville, Maryland
09/01/2004 04-104 Advisory Committee on the Medical Uses of Isotopes to Meet October 13 - 14 in Rockville, Maryland
09/01/2004 04-103 NRC Staff Issues Generic Letter on Nuclear Power Plant Steam Generator Inspections
August 2004
Date Document Number Description
08/31/2004 04-102 Note to Editors: New Public Affairs Officer in NRC Headquarters
08/31/2004 04-101 NRC Licensing Board Issues Decision on Adequacy of Doe Document Production Relating to Yucca Mountain Licensing Proceeding
08/30/2004 04-100 NRC to Meet with Local Residents Tuesday in Sioux Falls to Discuss Final Cleanup of Former Nuclear Reactor Site
08/30/2004 I-04-041

Nuclear Gauge Reported Stolen In New Jersey; Recovery is Sought

08/25/2004 II-04-047 NRC to Discuss Safety Significance of Inspection Finding at Oconee Nuclear Plant
08/24/2004 04-099 NRC Releases Cleaned-up Pennsylvania Site for Unrestricted Use
08/24/2004 I-04-040 NRC Proposes $7,500 Fine Against N.J. Firm for Alleged Nuclear Gauge Violations
08/23/2004 04-098 NRC Issues Policy Statement on Environmental Justice
08/20/2004 IV-04-035 NRC to Conduct Inspections at Palo Verde Nuclear Generating Station
08/20/2004 III-04-045 NRC Proposes $3,000 Fine Against Michigan Firm for Failing to Adequately Secure Nuclear Gauge
08/18/2004 04-097 NRC Approves Request by Utah to Amend its Agreement with Agency
08/13/2004 04-096 NRC Confirms Nuclear Plants' Operational Preparedness with Respect to Electric Grid Reliability
08/13/2004 II-04-046 NRC Says Florida Nuclear Power Plants Prepared for Hurricane Charley
08/12/2004 04-095 NRC to Hold Public Meeting August 17 on Planned Application for Advanced Candu Reactor Design
08/12/2004 III-04-044 NRC to Increase Regulatory Oversight of Perry Nuclear Plant
08/12/2004 04-094 NRC Revises Enforcement Policy to Include Alternative Dispute Resolution
08/12/2004 II-04-045 NRC Staff Seeks Input on Farley Nuclear Plant Draft Environmental Report for License Renewal
08/12/2004 04-093 NRC Issues New Strategic Plan
08/11/2004 I-04-039 NRC Assigns New Senior Resident Inspector to Susquehanna Steam Electric Station
08/11/2004 I-04-038 New NRC Senior Resident Inspector Assigned to Limerick Generating Station
08/09/2004 IV-04-034 NRC Assigns New Senior Resident Inspector to Columbia Generating Station
08/06/2004 04-092 NRC Announces Team, Schedule for Engineering Inspection at Vermont Yankee
08/06/2004 II-04-044 Zeiler Named NRC Senior Resident Inspector at Summer Nuclear Plant
08/06/2004 II-04-043 McCoy Named NRC Senior Resident Inspector at Vogtle Nuclear Plant
08/06/2004 II-04-042 Garrett Named NRC Senior Resident Inspector at Surry Nuclear Station
08/04/2004 04-091 NRC Modifies Availability of Security Information for All Nuclear Plants
08/02/2004 04-090 NRC to Hold Public Meeting August 17 on Issues Associated with Large Loss-of-Coolant Accidents
July 2004
Date Document Number Description
07/30/2004 04-089 NRC Staff Makes its Yucca Mountain Documents Available
07/30/2004 II-04-041 NRC Proposes $24,000 Fine Against Westinghouse for Alleged Violations at Commercial Nuclear Fuel Plant in Columbia, S.C.
07/21/2004 04-088 NRC Announces Opportunity for Hearing on Application to Renew Nine Mile Point Operating Licenses
07/16/2004 III-04-043 NRC Special Inspection into Causes of Reactor Shutdown and Associated Equipment Problems at Clinton
07/15/2004 I-04-037 NRC Updates Public on Indian Point Spent Fuel Storage Plans
07/15/2004 04-087 NRC Approves Power Uprate for Palisades
07/15/2004 04-086 NRC Names Allen G. Croff to Advisory Committee on Nuclear Waste
07/14/2004 04-085 NRC Advisory Committee on Nuclear Waste to Meet July 20 - 22 in Rockville, Maryland
07/13/2004 III-04-042 NRC to Hold Public Meeting July 21 on Decommissioning Plans for Thorium-Contaminated Sites Near Bay City, Michigan
07/09/2004 04-084 Atomic Safety and Licensing Board to Hold Hearing on Use of Mixed-Oxide Fuel at Catawba
07/08/2004 III-04-041 NRC to Meet with Detroit Firm on Apparent Transportation and Storage Violations
07/08/2004 04-083 NRC Finds No Significant Environmental Impacts from Extended Operation of Dresden and Quad Cities Nuclear Plants
07/07/2004 04-082 NRC Names Pre-License Application Presiding Officer to Resolve Disputes on Submittal of Yucca Mountain Documents
07/07/2004 III-04-040 NRC Davis-Besse Oversight Panel to Meet July 13 in Ohio
07/06/2004 I-04-036 NRC to Meet with Public to Discuss Spent Fuel Storage at Indian Point
07/01/2004 I-04-035 NRC to Meet with Public in New York on Nine Mile Point License Renewal
07/01/2004 04-081 NRC Announces Opportunity for Hearing on Application to Increase Power Output of Vermont Yankee
07/01/2004 IV-04-033 NRC to Meet with Pacific Gas & Electric to Discuss Diablo Canyon Issues
07/01/2004 IV-04-032 NRC to Discuss Findings of Palo Verde Augmented Inspection
June 2004
Date Document Number Description
06/30/2004 04-080 NRC Advisory Committee on Reactor Safety to Meet July 7 - 9 in Rockville, Maryland
06/29/2004 IV-04-031 NRC to Discuss Performance of San Onofre Nuclear Generating Station July 29
06/29/2004 IV-04-030 Diablo Canyon Meeting to Be Rescheduled
06/28/2004 04-079 NRC Updates Vermont Public Service Board on Status of Vermont Yankee Uprate Review
06/25/2004 04-078 NRC Atomic Safety and Licensing Board to Hold Prehearing Conference June 30 on Proposed Millstone License Renewal
06/24/2004 IV-04-027 NRC to Discuss Performance of Grand Gulf on July 22
06/24/2004 IV-04-028 NRC to Discuss Performance of Comanche Peak July 15
06/24/2004 IV-04-029 NRC to Discuss Performance of Columbia Generating Station July 22
06/24/2004 I-04-034 NRC Proposes $7,500 Fine Against Connecticut Company
06/23/2004 IV-04-026 NRC to Discuss Performance of Waterford 3 Nuclear Plant July 22
06/23/2004 04-077 NRC Receives Awards for Excellence in Performance and Accountability Reporting
06/22/2004 IV-04-025 NRC Staff to Meet with Pacific Gas & Electric to Discuss Diablo Canyon Issues
06/21/2004 III-04-039 NRC Proposes $19,200 Fine Against U.S. Inspection Services for a Radiation Overexposure to Worker
06/17/2004 I-04-033 License Termination Plan for Yankee Nuclear Power Plant to Be Discussed at Public Meeting on June 24
06/17/2004 04-076 NRC Publishes Alternative Fire Protection Rule
06/16/2004 III-04-038 NRC to Discuss Perry Inspection Findings with FirstEnergy Officials
06/15/2004 IV-04-024 NRC Sends Augmented Inspection Team to Palo Verde
06/15/2004 04-075 NRC Seeks Topics for Upcoming 17th Annual Regulatory Information Conference
06/14/2004 04-074 NRC to Hold Public Meeting June 17 to Discuss Risk-Informed Approach to Reactor Containment Sump Issue
06/14/2004 04-073 NRC Advisory Committee on Nuclear Waste to Meet June 22-24 in Rockville, Maryland
06/10/2004 04-072 NRC Staff Approves Transfer of Operating License for Kewaunee
06/10/2004 04-071 NRC Board to Hold Prehearing Conference June 21 - 23 in Rockville, Md., on Early Site Permit Applications
06/10/2004 04-070 NRC Establishes Additional Requirements for Electronic Submission of Documents on Yucca Mountain
06/09/2004 I-04-032 NRC to Discuss Performance, Work Environment Assessments of Hope Creek and Salem Nuclear Power Plants
06/08/2004 III-04-037 NRC to Hold Public Meeting June 15 on Proposed License Renewal of Point Beach Nuclear Plant
06/07/2004 04-069 NRC to Hold Public Meeting June 23 in Piketon, Ohio, to Discuss Licensing Process for Proposed Uranium Enrichment Facility
06/04/2004 04-068 Atomic Safety and Licensing Board to Hear Arguments June 15 - 16 in Hobbs, N.M., on Proposed Uranium Enrichment Facility
06/04/2004 04-067 NRC Staff Approves Transfer of Operating License for R.E. Ginna Nuclear Power Plant
06/03/2004 04-066 NRC Staff Issues Bulletin to Nuclear Power Plants on Inspecting Certain Reactor Piping Components
06/02/2004 III-04-036 NRC to Meet with Nuclear Management Company to Discuss Performance of Prairie Island Nuclear Plant
06/01/2004 II-04-040 Atomic Safety And Licensing Board to Hear Public Statements on Use of Mixed Oxide Fuel at Catawba
May 2004
Date Document Number Description
05/28/2004 04-065 NRC Announces Availability of License Renewal Application for Nine Mile Point Nuclear Station, Units 1 and 2
05/27/2004 I-04-031 New NRC Resident Inspector Assigned to Indian Point 3 Nuclear Plant
05/27/2004 04-064 NRC to Conduct Pilot Inspection Program Focused on Nuclear Plant Engineering and Design Issues
05/26/2004 IV-04-023 NRC to Discuss Performance of South Texas Project Nuclear Plant June 3
05/25/2004 III-04-035 NRC to Meet with Nuclear Management Company to Discuss Performance of Kewaunee Nuclear Plant
05/24/2004 04-063 Nuclear Regulatory Commission Honors Employees on May 27 in Rockville, MD
05/24/2004 III-04-034 NRC Begins Special Inspection of Pump Failure at Perry Nuclear Plant
05/20/2004 04-062 NRC Advisory Committee on Reactor Safeguards to Meet June 2 - 4 in Rockville, Maryland
05/19/2004 04-061 NRC Renews License for R.E. Ginna Nuclear Power Plant, for an Additional 20 Years
05/19/2004 IV-04-022 NRC to Hold Two Public Meetings on Issues Regarding Diablo Canyon Power Plant
05/19/2004 04-060 NRC Updates Construction Inspection Procedures for Possible New Nuclear Plants
05/18/2004 04-059 NRC to Hold Public Meeting May 25 to Discuss a Risk-Informed Approach to Reactor Containment Sump Issue
05/14/2004 04-058 NRC Advisory Committee on Nuclear Waste to Meet May 25 - 27 in Rockville, Maryland
05/13/2004 III-04-033 NRC to Meet with Nuclear Management Company to Discuss Performance of Monticello Nuclear Plant
05/12/2004 04-057 NRC Establishes Web Page for Information on Current Technical Issues at Vermont Yankee
05/12/2004 04-056 NRC Approves Testing of Full-Scale Rail Cask for Transportation of Spent Fuel
05/11/2004 I-04-030 NRC Seeks Public Input on Environmental Impact Statement for Proposed Millstone Nuclear Plant License Renewal
05/11/2004 II-04-039 NRC Staff Cites Honeywell Illinois Plant for Violating NRC Regulations
05/11/2004 I-04-029 NRC to Discuss Annual Performance Assessment of Nine Mile Point 1 and 2 Nuclear Power Plants
05/10/2004 I-04-028 NRC to Discuss Annual Performance Assessment of Three Mile Island 1 Nuclear Power Plant
05/07/2004 II-04-038 NRC Schedules Regulatory Conference to Discuss Inspection Finding at Brunswick Nuclear Plant
05/07/2004 II-04-037 NRC Staff to Hold Public Meeting with Southern Nuclear May 14 to Discuss Initial Farley Plant License Renewal Inspection
05/07/2004 I-04-027 NRC Proposes $7,500 Fine Against New Jersey Firm for Failing to Maintain Control of Nuclear Gauge
05/06/2004 III-04-032 NRC Begins Special Inspection of Shutdown at Dresden Nuclear Plant
05/06/2004 III-04-031 Meeting to Discuss Results of a Special Inspection at D.C. Cook
05/06/2004 III-04-030 NRC Davis-Besse Oversight Panel to Meet May 13 in Ohio
05/05/2004 04-055 NRC Provides Update on Review Process for Vermont Yankee Uprate Request
05/04/2004 04-053 Note to Editors: NRC Issues Information on Studies Related to the Davis-Besse Reactor Head
05/04/2004 04-054 NRC Issues Review Standard for Early Site Permit Applications
05/04/2004 I-04-026 NRC Upgrades Inspection Team Looking Into Worker Exposures at Puerto Rico Irradiator Facility
05/03/2004 04-052 NRC to Host Open House on May 10 in Nevada
April 2004
Date Document Number Description
04/30/2004 III-04-029 NRC to Meet with Nuclear Management Co. to Discuss Performance of Palisades Nuclear Plant
04/30/2004 III-04-028 NRC to Meet with Exelon Generation Company to Discuss Performance of LaSalle Nuclear Plant
04/28/2004 04-051 NRC Advisory Committee on Reactor Safeguards to Meet May 6 - 8 in Rockville, Maryland
04/28/2004 IV-04-021 NRC Proposes $12,000 Fine for High Mountain Inspection Service
04/28/2004 IV-04-020 NRC Proposes $6,000 Fine Against All Tech Corp., of Pocatello, Idaho
04/27/2004 04-050 NRC Issues Regulatory Issue Summary Concerning Electric Grid Reliability
04/27/2004 I-04-025 NRC Begins Special Inspection at Irradiator Facility in Puerto Rico
04/27/2004 III-04-027 NRC to Meet with Exelon Generation Company to Discuss Performance of Dresden Nuclear Plant
04/26/2004 04-049 NRC to Discuss Quality of Yucca Mountain Information with DOE May 5 in Las Vegas
04/26/2004 04-048 NRC Amends Licensing, Inspection and Annual Fees Rule
04/26/2004 I-04-024 NRC to Discuss Annual Performance Assessment of Susquehanna Nuclear Power Plant
04/23/2004 II-04-036 NRC Names Widmann Senior Resident Inspector at North Anna Nuclear Station
04/23/2004 04-047 NRC Renews License for Virgil C. Summer Nuclear Station, Unit 1, for an Additional 20 Years
04/23/2004 III-04-026 NRC Issues Letter on Performance Improvement Plans for Point Beach Nuclear Power Station
04/22/2004 I-04-023 NRC to Conduct a Special Inspection at Vermont Yankee to Look into Potentially Missing Spent Fuel Segments
04/22/2004 III-04-025 NRC to Meet with Exelon Generation Company to Discuss Performance of Quad Cities Nuclear Plant
04/22/2004 04-046 NRC to Hold Public Meeting May 19 on Draft Generic Letter on Reactor Containment Sump Issue
04/21/2004 I-04-022 NRC to Discuss Annual Performance Assessment of Indian Point Nuclear Power Plants
04/21/2004 04-045 NRC Names Directors of Communications and Office of Public Affairs
04/21/2004 I-04-021 NRC Proposes $3,000 Fine Against W.Va. Firm for Failing to Maintain Control of Nuclear Gauge
04/20/2004 IV-04-019 NRC to Meet with Nebraska Public Power District to Discuss Recent Inspection at Cooper Nuclear Station
04/20/2004 04-044 NRC Seeks Public Comment on Proposed Pilot Program for Use of Alternative Dispute Resolution
04/19/2004 II-04-035 NRC to Meet with Duke Energy Officials to Discuss Safety Performance at Catawba Nuclear Power Plant
04/19/2004 04-043 NRC Renews License for H.B. Robinson Steam Electric Plant, Unit 2, for an Additional 20 Years
04/19/2004 II-04-034 NRC to Hold Predecisional Enforcement Conference to Discuss Apparent Violation at Browns Ferry
04/17/2004 II-04-033 NRC Approves Restart of Final Stage in Uranium Hexafluoride Process at Honeywell Plant in Illinois
04/16/2004 04-042 NRC Announces Opportunity for Hearing on Application to Renew Operating Licenses for Point Beach Nuclear Plant Units 1 and 2
04/15/2004 III-04-024 NRC to Meet with Exelon Generation Co. to Discuss Performance of Byron Nuclear Plant
04/15/2004 III-04-023 NRC to Meet with Nuclear Management Company to Discuss Performance of Point Beach Nuclear Plant
04/15/2004 IV-04-018 NRC Proposes $6,000 Fine for 21st Century Technologies
04/14/2004 III-04-022 NRC to Meet with FirstEnergy Nuclear Operating Co. to Discuss Performance of Perry Nuclear Plant
04/14/2004 II-04-032 NRC Approves Restart of Second Stage in Uranium Hexafluoride Process at Honeywell Plant in Illinois
04/13/2004 04-041 NRC Issues Report on Quality of Technical Information Under Development by DOE for Yucca Mountain Application
04/12/2004 II-04-031 NRC to Hold Meeting April 20 at NFS Nuclear Fuel Plant to Discuss NRC Performance Review of Licensee Activities
04/12/2004 III-04-021 NRC to Meet with Exelon Generation Company to Discuss Performance of Braidwood Nuclear Plant
04/12/2004 II-04-030 NRC to Meet with TVA Officials to Discuss Safety Performance at Browns Ferry Nuclear Power Plant
04/12/2004 II-04-029 NRC to Meet with TVA Officials to Discuss Safety Performance at Sequoyah Nuclear Power Plant
04/12/2004 IV-04-017 NRC to Meet with Omaha Public Power District to Discuss Performance of Fort Calhoun Nuclear Plant
04/09/2004 II-04-028 NRC to Meet with Duke Energy Officials to Discuss Safety Performance at McGuire Nuclear Power Plant
04/09/2004 II-04-027 NRC to Meet with Duke Energy Officials to Discuss Safety Performance at Oconee Nuclear Power Plant
04/09/2004 II-04-026 NRC Staff Proposes $60,000 Civil Penalty Against Duke Energy for Violation of NRC Requirements at Oconee Nuclear Power Plant
04/09/2004 04-040 NRC Advisory Committee on Nuclear Waste to Meet April 20 - 22 in Rockville, Maryland
04/08/2004 I-04-020 NRC to Discuss Annual Performance Assessment of Oyster Creek Nuclear Power Plant
04/07/2004 II-04-025 NRC Staff Proposes $88,000 Civil Penalty Against Progress Energy for Terminating CP&L Employee Engaged in Protected Activity
04/07/2004 II-04-024 NRC to Meet with Honeywell Officials in Illinois on April 21 to Discuss Improvement Efforts since December Event
04/07/2004 I-04-019 NRC to Discuss Annual Performance Assessment of Peach Bottom Nuclear Power Plant
04/06/2004 04-039 NRC Announces Review Schedule for Browns Ferry License Renewal Application
04/06/2004 III-04-020 NRC Davis-Besse Oversight Panel to Meet April 8 in Oak Harbor, OH
04/05/2004 II-04-023 NRC to Meet with Progress Energy Officials to Discuss Safety Performance at Crystal River Nuclear Power Plant
04/05/2004 II-04-022 NRC to Meet with TVA Nuclear Officials to Discuss Safety Performance at Watts Bar Nuclear Power Plant
04/05/2004 I-04-018 NRC to Discuss Annual Performance Assessment of Seabrook Nuclear Power Plant
04/01/2004 III-04-019 NRC to Meet with Exelon Generation Company to Discuss Performance of Clinton Nuclear Plant
March 2004
Date Document Number Description
03/31/2004 I-04-017 NRC to Discuss Annual Performance Assessment of Limerick Nuclear Power Plant
03/31/2004 II-04-021 NRC to Hold Open Regulatory Conference to Discuss Surry Nuclear Plant Operations
03/31/2004 04-038 NRC Makes New Management Assignments to Expand its Focus on Safety, Security, and Preparedness
03/30/2004 I-04-016 NRC to Discuss Annual Performance Assessment of R.E. Ginna Nuclear Power Plant
03/30/2004 III-04-018 New Location for NRC Region III Office Beginning April 5
03/29/2004 III-04-017 NRC to Meet with Nuclear Management Company to Discuss Performance of Duane Arnold Nuclear Plant
03/27/2004 II-04-020 NRC Approves Restart of First Stage in Uranium Hexaflouride Process at Honeywell Plant in Illinois
03/26/2004 II-04-019 NRC Seeks Public Input on Browns Ferry Nuclear Plant License Renewal at Meetings in Alabama
03/25/2004 III-04-016 NRC to Meet with Detroit Edison Company to Discuss Performance of Fermi 2 Nuclear Plant
03/25/2004 04-037 NRC Advisory Committee on Reactor Safeguards to Meet April 15-17 in Rockville, Maryland
03/25/2004 04-036 NRC Staff Issues Draft Letter, Concerning Potential Reactor Containment Sump Issue, for Public Comment
03/25/2004 I-04-015 NRC to Hold Meetings on Vermont Yankee Nuclear Plant Performance and Power Uprate Review
03/25/2004 III-04-015 NRC to Discuss the Status of Twin Cities Army Ammunition Plant Decommissioning
03/25/2004 IV-04-016 NRC Cites Cooper Nuclear Plant for Inspection Finding of Low to Moderate Safety Significance
03/24/2004 III-04-014 Public Meeting March 31 on License Renewal Application for Point Beach Nuclear Power Plant
03/24/2004 IV-04-015 NRC to Meet with Wolf Creek Nuclear Operating Co. to Discuss Performance of Wolf Creek Nuclear Plant
03/24/2004 IV-04-014 NRC to Meet with Entergy Operations, Inc. to Discuss Performance of River Bend Nuclear Power Plant
03/24/2004 04-035 NRC Reorganizes Office to Give Added Focus to High-Level Radioactive Waste Programs
03/24/2004 IV-04-013 NRC to Meet with Union Electric Co. to Discuss Performance of Callaway Nuclear Power Plant
03/23/2004 I-04-014 NRC to Discuss Annual Performance Assessment of Calvert Cliffs Nuclear Power Plant
03/22/2004 II-04-018 NRC to Meet with Progress Energy Officials to Discuss Safety Performance at Robinson Nuclear Power Plant
03/22/2004 II-04-017 NRC to Meet with Dominion Energy Officials to Discuss Safety Performance at North Anna Nuclear Power Plant
03/22/2004 II-04-016 NRC to Meet with Dominion Energy Officials to Discuss Safety Performance at Surry Nuclear Power Plant
03/22/2004 II-04-015 NRC to Meet with Southern Nuclear Officials to Discuss Safety Performance at Vogtle Nuclear Power Plant
03/22/2004 II-04-014 NRC to Meet with Southern Nuclear Officials to Discuss Safety Performance at Hatch Nuclear Power Plant
03/22/2004 II-04-013 NRC to Meet with Southern Nuclear Officials to Discuss Safety Performance at Farley Nuclear Power Plant
03/22/2004 04-034 NRC Issues License for Diablo Canyon Independent Spent Nuclear Fuel Storage Installation
03/19/2004 III-04-013 NRC Proposes $60,000 Fine Against Point Beach Nuclear Power Plant
03/19/2004 IV-04-012 NRC to Meet with Nebraska Public Power District to Discuss Performance of Cooper Nuclear Station
03/18/2004 I-04-013 NRC to Discuss Annual Performance Assessment of Beaver Valley Nuclear Power Plant
03/18/2004 IV-04-011 NRC to Meet with Entergy Operations, Inc. to Discuss Performance of Arkansas Nuclear One
03/18/2004 I-04-012 NRC to Discuss Annual Performance Assessment of Millstone Nuclear Power Plant
03/17/2004 I-04-011 NRC to Discuss Annual Performance Assessment of James A. FitzPatrick Nuclear Power Plant
03/17/2004 II-04-012 NRC to Meet with Progress Energy Officials to Discuss Safety Performance at Harris Nuclear Power Plant
03/17/2004 II-04-011 NRC to Meet with SCE&G Officials to Discuss Safety Performance at Summer Nuclear Power Plant
03/17/2004 I-04-010 NRC to Discuss Annual Performance Assessment of Pilgrim Nuclear Power Plant
03/17/2004 IV-04-010 NRC to Discuss Performance of Palo Verde Nuclear Plant
03/16/2004 IV-04-009 NRC Proposes $21,000 Fine to Alaska Department of Transportation
03/16/2004 III-04-012 NRC Suspends License of a Missouri Industrial Testing Company
03/12/2004 II-04-010 NRC to Meet with FPL Officials to Discuss Safety Performance at St. Lucie Nuclear Power Plant
03/12/2004 II-04-009 NRC to Meet with FPL Officials to Discuss Safety Performance at Turkey Point Nuclear Power Plant
03/12/2004 04-033 NRC Announces Opportunity for Hearing on Application to Renew Millstone Nuclear Plant, Units 2 and 3, Operating Licenses
03/11/2004 I-04-009 NRC Proposes $3,000 Fine Against West Virginia Firm for Failure to Constantly Control Two Nuclear Gauges
03/11/2004 II-04-008 NRC to Meet with Honeywell Officials in Illinois on March 18 to Discuss Improvement Efforts since December Event
03/11/2004 II-04-007 NRC to Hold Open Regulatory Conference to Discuss Brunswick Nuclear Plant Operations
03/11/2004 I-04-008 NRC, PSEG to Discuss Work Environment at Salem, Hope Creek Nuclear Power Plants
03/10/2004 04-032 NRC Announces Opportunity for Hearing on Application to Renew Browns Ferry, Units 1, 2 and 3 Operating Licenses
03/08/2004 III-04-011 NRC Approves Davis-Besse Restart
03/05/2004 04-031 NRC Issues Annual Assessments for Nation's Nuclear Plants
03/03/2004 I-04-007 NRC Proposes $3,000 Fine Against Va. Firm over Temporary Loss of Nuclear Gauge
03/02/2004 04-030 NRC Approves Power Uprate for Kewaunee Nuclear Power Plant
03/02/2004 IV-04-008 NRC to Hold Regulatory Conference with Entergy Operations on Waterford Nuclear Power Plant
03/01/2004 04-029 NRC Announces Availability of License Renewal Application for Point Beach Nuclear Power Plant
03/01/2004 IV-04-007 NRC to Conduct Special Inspection at Palo Verde Nuclear Generating Station
February 2004
Date Document Number Description
02/27/2004 III-04-010 NRC to Hold Public Meeting March 8 on Proposed License Renewal of D. C. Cook Nuclear Plant
02/26/2004 I-04-006 NRC Proposes $3,000 Fine Against Va. Firm for Radiography Violations
02/26/2004 III-04-009 NRC Issues Letter on Planned Davis-Besse Order
02/25/2004 04-028 NRC Finds No Significant Environmental Impact from Extended Operation of Virgil C. Summer Nuclear Station
02/25/2004 II-04-006 NRC to Meet with Westinghouse Nuclear Fuel Plant Officials March 3 to Discuss Facility Safety Performance
02/25/2004 04-027 NRC Advisory Committee on Reactor Safeguards to Meet March 4 - 6 in Rockville, Maryland
02/24/2004 04-026 NRC Issues License to U.S. Enrichment Corporation for Lead Cascade Uranium Enrichment Facility
02/24/2004 II-04-005 NRC to Hold Predecisional Enforcement Conference to Discuss Apparent Violation of Regulatory Requirements at Oconee
02/23/2004 04-025 NRC Modifies Order Requiring Inspection of Pressurized Water Reactor Vessel Heads
02/19/2004 04-024 NRC Advisory Committee on the Medical Uses of Isotopes to Meet March 1 - 2 in Rockville, Maryland
02/18/2004 04-023 NRC Schedules Public Presentation and Webcast on March 3 on Three Mile Island Accident, 25 Years Later
02/17/2004 I-04-005 NRC Sends Special Inspection Team to Calvert Cliffs Unit 2
02/12/2004 04-022 NRC Offers Opportunity for Hearing on Proposed Spent Nuclear Fuel Storage Facility at Humboldt Bay
02/12/2004 04-021 NRC Considering Request by Utah to Amend its Agreement with Agency
02/11/2004 III-04-008 NRC Senior Officials Will Meet with Point Beach Management to Discuss Plant Performance
02/11/2004 I-04-004 Search Under Way for Radioactive Sources Missing from N.J. Site
02/09/2004 I-04-003 NRC Special Inspection Starts at Susquehanna Nuclear Plant
02/09/2004 04-019 NRC Invites Public to Submit Nominations for the Advisory Committee on Reactor Safeguards
02/09/2004 04-020 NRC to Hold Public Meeting in Eunice, N.M., on Environmental Review Process for Proposed Uranium Enrichment Plant
02/06/2004 III-04-007 Teleconferences Available for February 12 Davis-Besse Meetings
02/06/2004 I-04-002 NRC to Hold Public Meeting in Connecticut on License Renewal Application for Millstone 2 & 3
02/03/2004 04-016 Revised to Correct Dollar Amounts NRC Proposes to Amend Licensing, Inspection and Annual Fees Rule
02/02/2004 04-018 NRC Sets Schedule for Review of LES Application; Offers Opportunity to Request Participation in Hearing
02/02/2004 04-017 NRC Advisory Committee on Nuclear Waste to Meet February 24 - 27 in Rockville, Maryland
January 2004
Date Document Number Description
01/30/2004 III-04-006 NRC to Conduct Restart Readiness Inspection at Davis-Besse; Meetings Scheduled for February 12 in Oak Harbor, Ohio
01/30/2004 II-04-004 NRC to Meet with NFS Officials February 5
01/29/2004 04-015 NRC Issues Environmental Assessment And Safety Evaluation Report on Proposed USEC Facility in Ohio
01/29/2004 IV-04-006 NRC to Hold Two Public Meetings to Discuss Inspections at Diablo Canyon Nuclear Plant Following Earthquake
01/28/2004 04-014 NRC to Conduct FY2005 Budget Briefing February 2 in Rockville, Maryland
01/28/2004 04-012 NRC Finds No Significant Environmental Impact from Extended Operation of Ginna Nuclear Power Plant
01/27/2004 04-013 NRC Modifies Financial Information Requirements for Power Reactor Licenses
01/26/2004 IV-04-005 NRC to Hold Public Meeting on Environmental Review for Proposed Arkansas Nuclear One, Unit 2 License Renewal
01/23/2004 04-011 NRC Makes License Renewal Application Available for the Millstone Nuclear Power Plant
01/22/2004 II-04-003 Public Meeting February 5 on License Renewal Application for Browns Ferry Nuclear Plant, Units 1, 2, and 3
01/21/2004 04-010 NRC Establishes Emergency Preparedness Organization in Office of Nuclear Reactor Regulation
01/20/2004 III-04-005 NRC Dispatches Special Inspection Team to Look into Safety Injection Pump Problem at Kewaunee
01/20/2004 04-009 NRC Advisory Committee on Reactor Safeguards to Meet February 5 - 7 in Rockville, Maryland
01/20/2004 04-008 NRC to Hold 16th Annual Regulatory Information Conference March 10 - 12 in Washington, D.C.
01/20/2004 04-007 NRC Issues Review Standard for Extended Power Uprates
01/20/2004 04-006 NRC Approves Power Uprate for Fort Calhoun
01/14/2004 III-04-004 NRC Oversight Panel to Meet on January 21 with Davis-Besse Officials in Oak Harbor
01/14/2004 04-004 NRC Issues Report on Improving Reactor Operating Experience Programs
01/14/2004 04-005 NRC Announces Availability of Two New Websites on Conduct of Hearings and Pending Applications
01/13/2004 IV-04-004 NRC to Hold Public Meeting on Grand Gulf Early Site Permit
01/13/2004 IV-04-003 NRC to Meet with Nebraska Public Power District to Discuss Recent Inspection at Cooper Nuclear Station
01/13/2004 I-04-001 New NRC Resident Inspector Assigned to Seabrook Nuclear Plant
01/13/2004 04-003 NRC to Hold Hearing on Early Site Permit for Grand Gulf Site; Offers Opportunity to Request Participation
01/12/2004 04-002 NRC Historian Writes Perspective on Three Mile Island Incident, 25 Years Later
01/09/2004 III-04-003 NRC Staff Seeks Input on Dresden Draft Environmental Report for License Renewal
01/09/2004 III-04-002 NRC Staff to Discuss an Apparent Violation Associated with Emergency Classifications at Point Beach
01/08/2004 II-04-002 Oral Argument on Duke's Application to Use Mixed Oxide Nuclear Fuel Scheduled for January 15 in Charlotte
01/08/2004 04-001 NRC Announces the Availability of License Renewal Application for Browns Ferry Nuclear Power Plant
01/06/2004 IV-04-002 NRC Proposes $6,000 Fine for Cooperheat-MQS, Inc. of Houston, Texas
01/05/2004 IV-04-001 NRC Staff to Meet with Energy Northwest to Discuss Columbia Generating Station Issues
01/02/2004 II-04-001 NRC to Provide Preliminary Inspection Results for Honeywell's Illinois Fuel Plant at Public Meeting on January 6
01/02/2004 III-04-001 NRC Proposes $60,000 Fine for Fitness for Duty Violation at Kewaunee

To top of page

Page Last Reviewed/Updated Thursday, February 04, 2021