December |
Date |
Document Number |
Description |
12/30/2019 |
19-065 |
NRC Proposes $14,500 Civil Penalty to Western Nuclear, Inc. |
12/19/2019 |
IV-19-019 |
NRC Proposes $7,250 Fine to Stillwater Mining Co. |
12/17/2019 |
19-064 |
NRC to Issue Early Site Permit to Tennessee Valley Authority for Clinch River Site |
19-063 |
NRC Seeks Comment on Proposed Rule for Emergency Preparedness at Small Modular Reactors and Other New Technologies |
12/05/2019 |
19-062 |
NRC Issues Subsequent Renewed Licenses for Turkey Point Reactors |
12/03/2019 |
19-061 |
NRC Approves License Transfers for FirstEnergy Nuclear Power Plants |
12/02/2019 |
19-060 |
NRC to Hold Public Meeting Seeking Comment on Environmental Review for SHINE Operating License |
 |
November |
Date |
Document Number |
Description |
11/21/2019 |
19-059 |
***Corrected*** NRC Announces Opportunity to Request Hearing on Bellefonte Construction Permit Transfer Application |
19-058 |
NRC Issues Enforcement Actions for Discrimination at Vogtle New Reactor Construction Site |
11/20/2019 |
II-19-038 |
NRC Proposes $145,000 Civil Penalty to Tennessee Valley Authority |
11/12/2019 |
I-19-029 |
NRC to Conduct Webinar Seeking Public Comments on Decommissioning Community Advisory Board Best Practices |
11/05/2019 |
19-057 |
NRC Imposes $43,500 Civil Penalty on New York Firm for Unlicensed Importation and Distribution of Radioactive Material |
II-19-037 |
NRC Seeks Comments on Draft Environmental Assessment for Westinghouse Columbia Fuel Facility License Renewal |
11/04/2019 |
19-056 |
NRC Approves Changes to Pilgrim Nuclear Power Station’s Emergency Planning Requirements |
 |
October |
Date |
Document Number |
Description |
10/31/2019 |
I-19-028 |
NRC Names New Resident Inspector at Peach Bottom Nuclear Power Plant |
10/30/2019 |
I-19-027 |
NRC Assigns New Senior Resident Inspector at Nine Mile Point |
19-055 |
NRC Issues Eighth U.S. National Report for Convention on Nuclear Safety |
10/29/2019 |
IV-19-018 |
NRC Names New Senior Resident Inspector at Comanche Peak Nuclear Power Plant |
10/28/2019 |
19-054 |
NRC Issues Final Environmental Impact Statement for Turkey Point Subsequent License Renewal |
19-053 |
NRC Seeks Public Comment on Draft Environmental Impact Statement for Surry Subsequent License Renewal |
10/23/2019 |
19-052 |
NRC to Discuss Limited Hearing Opportunity for Vogtle New Reactors |
10/22/2019 |
19-051 |
NRC Issues Confirmatory Order to Manager at Southern Nuclear for Discrimination at Vogtle New Reactor Construction Site |
10/21/2019 |
I-19-026 |
New NRC Senior Resident Inspector Assigned to R.E. Ginna Nuclear Power Plant |
19-050 |
NRC Imposes $43,500 Civil Penalty on California Firm for Unlicensed Importation and Distribution of Radioactive Material |
10/15/2019 |
IV-19-017 |
NRC Names New Resident Inspector at Grand Gulf Nuclear Power Plant |
19-049 |
NRC Announces the Merger of Nuclear Reactor Offices |
10/09/2019 |
II-19-036 |
NRC Announces Use of Electronic Mailing Listserv for Fuel Cycle Facility Correspondence |
10/08/2019 |
III-19-021 |
NRC Issues Confirmatory Action Letter to Fermi Nuclear Power Plant |
10/02/2019 |
I-19-025 |
New NRC Resident Inspector Assigned to Limerick Nuclear Power Plant |
III-19-020 |
NRC Names New Senior Resident Inspector at Clinton Nuclear Power Station |
 |
September |
Date |
Document Number |
Description |
09/30/2019 |
IV-19-016 |
NRC Names New Resident Inspector at the Wolf Creek Nuclear Power Plant |
19-048 |
Vermont Becomes 39th NRC Agreement State |
09/26/2019 |
I-19-024 |
NRC to Hold Public Open House to Discuss 2018 Performance of Nine Mile Point/FitzPatrick Nuclear Power Plants |
09/24/2019 |
II-19-035 |
NRC Names New Senior Resident Inspector at Watts Bar Nuclear Power Plant |
II-19-034 |
NRC Names New Senior Resident Inspector at Oconee Nuclear Power Station |
09/18/2019 |
19-047 |
NRC and FERC Commissioners to Discuss Grid Reliability, Reactor Issues |
09/17/2019 |
19-046 |
NRC 2019-2020 Information Digest Now Available Online |
09/12/2019 |
19-045 |
NRC Proposes $232,000 Civil Penalty for Florida Power & Light, Bans Former Executive for Discrimination at St. Lucie Nuclear Plant |
19-044 |
NRC Names Jennifer Golder As Director, Office of Administration |
09/10/2019 |
19-043 |
NRC Awards Fiscal Year 2019 Academic Grants |
09/06/2019 |
II-19-033 |
NRC Bans Former URENCO Contract Employee from NRC-Licensed Activities for One Year |
09/05/2019 |
I-19-023 |
NRC Schedules Conference on Spent Nuclear Fuel Management |
09/04/2019 |
IV-19-015 |
NRC Names New Resident Inspector at Comanche Peak Nuclear Power Plant |
 |
August |
Date |
Document Number |
Description |
08/23/2019 |
19-042 |
Atomic Safety and Licensing Board Admits One Contention in Proceeding on Texas Spent Fuel Storage Proposal |
19-041 |
NRC Approves License Transfer for Pilgrim Nuclear Power Plant |
08/22/2019 |
19-040 |
NRC Atomic Safety and Licensing Board to Hold Oral Argument on Turkey Point Subsequent Renewal Application |
08/21/2019 |
19-039 |
NRC Announces Public Meetings Dates and Venues for Community Advisory Boards Near Decommissioning Nuclear Power Plants |
19-038 |
NRC Atomic Safety and Licensing Board to Hold Hearing, Take Limited Appearance Statements on Seabrook License Amendment |
08/16/2019 |
II-19-032 |
NRC Schedules Meeting to Receive TVA Update on Work Environment Issues |
08/15/2019 |
19-037 |
NRC and CNSC Sign Historic Memorandum to Enhance Technical Reviews of Advanced/Small Modular Reactor Technologies |
08/08/2019 |
19-036 |
NRC Seeks Public Comment on Draft Environmental Impact Statement for Peach Bottom Subsequent License Renewal |
08/05/2019 |
19-035 |
NRC to Conduct Public Webinar to Discuss Nuclear Power Plant Decommissioning, Community Advisory Board Best Practices |
08/01/2019 |
IV-19-014 |
NRC to Hold Public Meeting to Discuss Oversight Activities at San Onofre Nuclear Generating Station |
 |
July |
Date |
Document Number |
Description |
07/30/2019 |
I-19-022 |
NRC to Hold Open House to Discuss Ginna Nuclear Power Plant 2018 Safety Performance |
07/29/2019 |
I-19-021 |
New NRC Resident Inspector Assigned to Millstone Nuclear Power Plant |
07/24/2019 |
19-034 |
NRC to Hold Mandatory Hearing on Clinch River Early Site Permit Application |
07/19/2019 |
IV-19-013 |
NRC Issues Confirmatory Order to Wolf Creek Nuclear Operating Company |
07/17/2019 |
19-033 |
NRC Seeks Public Comment on Draft Regulatory Basis for Greater-Than-Class C Waste Disposal |
I-19-020 |
NRC Names New Senior Resident Inspector at FitzPatrick Nuclear Power Plant |
07/15/2019 |
III-19-019 |
NRC to Hold Open House to Discuss 2018 Performance of Donald C. Cook Nuclear Power Plant |
I-19-019 |
NRC Schedules Public Meeting for Comments on Decommissioning Report for Three Mile Island 1 Nuclear Power Plant |
07/12/2019 |
I-19-018 |
New NRC Resident Inspector Assigned to Seabrook Nuclear Power Plant |
07/11/2019 |
III-19-018 |
NRC Launches Special Inspection at Fermi Nuclear Power Plant |
II-19-031 |
NRC Names New Senior Resident Inspector at Surry Nuclear Power Station |
07/10/2019 |
19-032 |
NRC Appoints David Petti to Four-Year ACRS Term |
III-19-017 |
NRC to Hold Open House to Discuss 2018 Performance of Davis-Besse Nuclear Power Station |
07/09/2019 |
III-19-016 |
NRC to Hold Open House to Discuss 2018 Performance of Perry Nuclear Power Plant |
I-19-017 |
New NRC Resident Inspector Assigned to Hope Creek Nuclear Power Plant |
07/08/2019 |
19-031 |
NRC Publishes Annual Report to Congress on Nuclear Security Inspections |
I-19-016 |
NRC to Conduct Public Webinar on July 16 to Discuss Three Mile Island 1 Nuclear Power Plant Decommissioning Topics |
07/02/2019 |
I-19-015 |
***Update*** NRC Notified of Theft of Nuclear Density Gauge in Connecticut |
II-19-030 |
NRC Schedules Community Meeting in Erwin to Discuss Inspection and Oversight of Fuel Facilities |
 |
June |
Date |
Document Number |
Description |
06/28/2019 |
19-030 |
NRC Announces Locations for Public Meetings on Community Advisory Boards Associated with Decommissioning Nuclear Power Plants |
06/27/2019 |
19-029 |
NRC Atomic Safety and Licensing Board to Hold Oral Arguments on Texas Spent Fuel Storage Application |
III-19-015 |
NRC to Hold Open House to Discuss 2018 Performance of Braidwood Station |
06/25/2019 |
19-028 |
NRC Considering Vermont's Request to Become an Agreement State |
06/20/2019 |
19-027 |
NRC Approves License Transfer for Oyster Creek Nuclear Power Plant |
06/19/2019 |
I-19-014 |
NRC Names New Resident Inspector at Susquehanna Nuclear Power Plant |
06/18/2019 |
19-026 |
NRC Completes Safety Review of Early Site Permit for Clinch River Nuclear Site |
06/13/2019 |
III-19-014 |
NRC to Hold Open House to Discuss 2018 Performance of Monticello Nuclear Generating Plant |
III-19-013 |
NRC to Hold Open House to Discuss 2018 Performance of Prairie Island Nuclear Power Plant |
06/12/2019 |
III-19-012 |
NRC to Discuss 2018 Performance of Dresden Nuclear Power Plant at Community Event |
06/10/2019 |
I-19-013 |
NRC to Hold Public Meeting on 2018 Performance at Indian Point Nuclear Power Plant |
06/07/2019 |
19-025 |
NRC Identifies 11 Events in FY 2018 Annual Report on Abnormal Occurrences |
 |
May |
Date |
Document Number |
Description |
05/21/2019 |
IV-19-012 |
NRC Has Determined Fuel Loading Can Be Safely Resumed at San Onofre Nuclear Generating Station |
III-19-011 |
NRC to Hold Open House to Discuss 2018 Performance of Byron Nuclear Power Station |
I-19-012 |
NRC Schedules Webinar to Discuss 2018 Safety Performance at Pennsylvania Nuclear Power Plants |
05/17/2019 |
19-024 |
NRC Amends Licensing, Inspection, Annual Fees for FY 2019 |
05/16/2019 |
19-023 |
NRC Makes Senior Management Selections |
05/10/2019 |
II-19-029 |
NRC Schedules Open House to Discuss Farley Nuclear Power Plant Performance |
05/08/2019 |
19-022 |
NRC Selects George Wilson as Director of the Office of Enforcement |
05/07/2019 |
II-19-028 |
NRC Schedules Open House to Discuss Safety Performance of NFS Erwin Facility |
III-19-010 |
NRC to Discuss 2018 Performance of LaSalle Nuclear Power Plant |
19-021 |
NRC Atomic Safety and Licensing Board Denies Evidentiary Hearing on Holtec International's Proposed Spent Fuel Storage Facility in New Mexico |
05/03/2019 |
IV-19-011 |
NRC Issues Confirmatory Order to Idaho State University |
 |
April |
Date |
Document Number |
Description |
04/30/2019 |
IV-19-010 |
NRC to Hold Public Meeting to Discuss 2018 Performance of Wolf Creek Nuclear Power Plant |
III-19-009 |
NRC to Hold Open House to Discuss 2018 Performance of Palisades Nuclear Plant |
IV-19-009 |
NRC Names New Senior Resident Inspector at River Bend Nuclear Power Plant |
19-020 |
***Corrected*** NRC Issues Direct Final Rule to Certify Korean APR1400 Reactor |
04/29/2019 |
II-19-027 |
NRC Schedules Public Meeting to Discuss Safety Performance of Westinghouse Columbia Fuel Plant |
II-19-026 |
NRC Names New Senior Resident Inspector at Robinson Nuclear Power Plant |
04/25/2019 |
II-19-025 |
NRC Schedules Public Meeting to Discuss Safety Performance of Global Nuclear Fuel Plant |
04/24/2019 |
III-19-008 |
NRC to Hold Open House to Discuss 2018 Performance of Quad Cities Nuclear Power Station |
04/23/2019 |
III-19-007 |
NRC to Hold Open House to Discuss 2018 Performance of Fermi Nuclear Power Plant |
I-19-011 |
NRC to Hold Public Open House to Discuss 2018 Performance of Calvert Cliffs Nuclear Power Plant |
04/22/2019 |
II-19-024 |
NRC Schedules Open House to Discuss North Anna Nuclear Power Plant Performance |
II-19-023 |
NRC Schedules Open House to Discuss Watts Bar Nuclear Power Plant Performance |
II-19-022 |
NRC Schedules Webinar to Discuss Safety Performance of BWX Technologies Nuclear Fuel Facility |
04/18/2019 |
I-19-010 |
NRC Assigns Two New Resident Inspectors to Salem Nuclear Power Plant |
II-19-021 |
NRC Schedules Open House to Discuss Surry Nuclear Power Plant Performance |
II-19-020 |
NRC Schedules Open House to Discuss Harris Nuclear Power Plant Performance |
04/17/2019 |
II-19-019 |
NRC Schedules Open House to Discuss Vogtle Nuclear Power Plant Performance and Construction Inspection of New Units |
II-19-018 |
NRC Schedules Open House to Discuss Summer Nuclear Power Plant Performance |
04/16/2019 |
II-19-017 |
NRC Schedules Open House to Discuss Sequoyah Nuclear Power Plant Performance |
II-19-016 |
NRC Schedules Open House to Discuss Robinson Nuclear Power Plant Performance |
04/15/2019 |
I-19-009 |
NRC to Meet with Connecticut Nuclear Energy Advisory Council to Discuss 2018 Millstone Station Performance |
II-19-015 |
NRC Schedules Open House to Discuss Hatch Nuclear Power Plant Performance |
II-19-014 |
NRC Schedules Open House to Discuss Brunswick Nuclear Power Plant Performance |
04/12/2019 |
II-19-013 |
NRC Schedules Open House to Discuss Browns Ferry Nuclear Power Plant Performance |
04/11/2019 |
I-19-008 |
NRC to Hold Public Meeting to Discuss 2018 Performance of Seabrook Nuclear Power Plant |
04/10/2019 |
II-19-012 |
NRC Schedules Open House to Discuss St. Lucie Nuclear Power Plant Performance |
04/09/2019 |
IV-19-008 |
NRC to Hold Public Meeting to Discuss Grand Gulf Nuclear Power Plant 2018 Performance |
I-19-007 |
New NRC Senior Resident Inspector Assigned to Hope Creek Nuclear Plant |
04/08/2019 |
19-019 |
NRC Completes Environmental Review for Clinch River Early Site Permit |
04/04/2019 |
II-19-011 |
NRC Schedules Open House to Discuss Performance of Turkey Point Nuclear Power Plant |
I-19-006 |
NRC to Hold Webinar to Discuss Salem and Hope Creek Nuclear Power Plants 2018 Safety Performance |
19-018 |
NRC Seeks Public Comment on Draft Environmental Impact Statement for Turkey Point Subsequent License Renewal |
04/02/2019 |
I-19-005 |
Pennsylvania Firm Institutes Corrective Actions, Pays Fine Under Settlement Agreement with NRC |
II-19-010 |
NRC Names Senior Resident Inspector at BWXT Nuclear Fuel Facility in Lynchburg |
 |
March |
Date |
Document Number |
Description |
03/27/2019 |
III-19-006 |
NRC to Hold Open House to Discuss 2018 Performance of Duane Arnold Nuclear Power Plant |
03/26/2019 |
III-19-005 |
NRC to Hold Open House to Discuss 2018 Performance of Point Beach Nuclear Plant |
II-19-009 |
NRC Schedules Open House to Discuss Performance of Oconee Nuclear Power Station |
03/25/2019 |
IV-19-007 |
NRC Proposes $116,000 Civil Penalty to Southern California Edison |
03/19/2019 |
II-19-008 |
NRC Schedules Open House to Discuss Performance of Catawba Nuclear Power Station |
I-19-004 |
NRC to Hold Public Meeting to Discuss 2018 Performance of Pilgrim Nuclear Power Station |
19-017 |
NRC Seeks Public Comment on Potential Meeting Locations to Discuss Community Engagement Panels for Decommissioning Nuclear Power Plants |
03/18/2019 |
19-016 |
NRC Announces Hearing Opportunity on Proposed License Amendment to the Church Rock Mill Site in New Mexico |
03/13/2019 |
III-19-004 |
NRC to Hold Open House to Discuss 2018 Performance of Clinton Nuclear Power Plant |
19-015 |
John W. Lubinski Named Director, Office of Nuclear Material Safety and Safeguards |
19-014 |
NRC Atomic Safety and Licensing Board to Hold Oral Argument on Peach Bottom Subsequent License Renewal Application |
03/12/2019 |
19-013 |
NRC Renews Seabrook Station Operating License |
03/11/2019 |
19-012 |
NRC Proposes FY 2020 Budget to Congress |
03/08/2019 |
IV-19-006 |
NRC Proposes $14,500 Fine to Team Industrial Service, Inc. |
19-011 |
NRC's Felix Gonzalez Honored as a 2019 NSPE Federal Engineer of the Year |
II-19-007 |
NRC Schedules Open House to Discuss Performance of McGuire Nuclear Power Station |
03/07/2019 |
IV-19-005 |
NRC to Conduct Virtual Public Meeting/Webinar on Fuel Loading at San Onofre Nuclear Generating Station |
19-010 |
NRC Issues Annual Assessments for Nation's Nuclear Plants |
03/05/2019 |
IV-19-004 |
NRC Names New Resident Inspector at Arkansas Nuclear One |
03/01/2019 |
II-19-006 |
NRC Names Senior Resident Inspector at North Anna Nuclear Plant |
II-19-005 |
NRC Names Senior Resident Inspector at Farley Nuclear Plant |
 |
February |
Date |
Document Number |
Description |
02/28/2019 |
II-19-004 |
NRC Names Resident Inspector at Vogtle Nuclear Plant |
II-19-003 |
NRC Announces Two Resident Inspectors at Vogtle Construction Site |
02/26/2019 |
II-19-002 |
NRC Schedules Meeting to Discuss TVA Confirmatory Orders |
02/25/2019 |
III-19-003 |
NRC Issues Order Prohibiting Radiographer from Participating in NRC-Licensed Activities |
IV-19-003 |
NRC Proposes $14,500 Fine to Providence Alaska Medical Center |
19-009 |
NRC to Host Annual Regulatory Information Conference with Focus on Transformation and Innovation |
02/14/2019 |
19-008 |
NRC Seeks Public Comment on Environmental Review of Proposed Church Rock Mine Cleanup in New Mexico |
02/07/2019 |
III-19-002 |
NRC Names New Senior Resident Inspector at Byron Nuclear Power Plant |
02/06/2019 |
I-19-003 |
NRC to Hold Public Meeting to Discuss Licensing Actions for Seabrook Nuclear Power Plant |
02/05/2019 |
19-007 |
NRC Proposes to Amend Annual Fees Regulations |
19-006 |
NRC Proposes $7,250 Fine to U.S. Geological Survey for Research Reactor Violations |
 |
January |
Date |
Document Number |
Description |
01/30/2019 |
II-19-001 |
NRC Issues Confirmatory Order to Farley Nuclear Power Plant to Address Issues Related to the Handling of Safeguards Information |
01/24/2019 |
19-005 |
NRC To Issue Final Rule for Mitigating Severe Events at U.S. Reactors |
01/15/2019 |
19-004 |
NRC Opens Online Registration for 2019 Regulatory Information Conference |
01/11/2019 |
19-003 |
NRC Atomic Safety and Licensing Board to Hold Oral Arguments in Albuquerque on Holtec Spent Fuel Storage Application |
01/10/2019 |
IV-19-002 |
NRC to Conduct Pre-Decisional Enforcement Conference via Webinar on Special Inspection at San Onofre Nuclear Generating Station |
01/08/2019 |
III-19-001 |
NRC Names New Resident Inspector at Fermi Nuclear Power Station |
I-19-002 |
NRC to Hold Public Meeting for Comments on Pilgrim Nuclear Power Plant Decommissioning Activities Report |
01/07/2019 |
IV-19-001 |
NRC Names New Resident Inspector at Palo Verde Nuclear Generating Station |
01/04/2019 |
19-002 |
NRC Advisory Committee on Reactor Safeguards Elects 2019 Leadership, Confirms Meeting Schedule |
01/03/2019 |
I-19-001 |
NRC to Conduct Public Webinar to Discuss Pilgrim Nuclear Power Plant Decommissioning Topics |
01/02/2019 |
19-001 |
NRC to Hold Public Pre-Decisional Enforcement Conference with Holtec to Address Spent Fuel Storage Canister Design Issues |
 |