The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Part 21 Reports: 2022

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Log No. Notifier Description Report Date Event No. / Accession No.
2022-28-02 Velan Inc Final Report Notification Pursuant To 10 CFR Part 21.21, Regarding 14NPS Class 150 Triple Offset Butterfly Valve - Model W19-0CP13-KCDN-B0001 03/07/2023 ML23066A221
2022-28-01 Velan Inc Interim Report Notification Pursuant To 10 CFR Part 21.21, Regarding 14NPS Class 150 Triple Offset Butterfly Valve - Model W19-0CP13-KCDN-B0001 01/19/2023 ML23023A036
2022-28-00 Velan Inc Interim Report Notification Pursuant To 10 CFR Part 21.21, Regarding 14NPS Class 150 Triple Offset Butterfly Valve 12/21/2022 ML22356A058
2022-27-01 Wolf Creek Nuclear Operating Corporation Interim Notification Pursuant To 10 CFR Part 21.21, Regarding Main Steam Isolation Valves (MSIVs ) (Valve Type PPS-A 700) and Main Feedwater Isolation Valves (MFIVs) (Valve Type PPS-A 300) Torque Values 01/11/2023 ML23011A062
2022-27-00 Wolf Creek Nuclear Operating Corporation Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Inadequate Torque Values 12/12/2022 EN 56269
2022-26-02 Flowserve-Limitorque Final Notification of Potential Part 21 on Peerless 56 frame DC Motors 03/03/2023 ML23065A200
2022-26-01 Flowserve-Limitorque Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Peerless 56 Frame DC Motors 01/27/2023 ML23030A664
2022-26-00 Flowserve-Limitorque Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Peerless 56 Frame DC Motors 12/01/2022 ML22342B140
2022-25-01 QualTech NP, Curtiss-Wright Nuclear Division Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Eaton TRM5 Timing Relays 02/06/2023 ML23038A019
2022-25-00 Curtiss-Wright Nuclear Division Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding QualTech NP Supplied Eaton TRM5 Timing Relays 11/30/2022 ML22341A032
2022-24-00 Flowserve Corporation 10 CFR Part 21 Report 38878-8 Solenoid Valve at Duke, Catawba Flowserve Evaluation #105 11/10/2022 ML22319A094
2022-23-03 United Controls International Final Report Notification Pursuant To 10 CFR Part 21.21, Regarding Schneider Electric P/N ASP840-000 Modicon Primary/Secondary Power Supply Failures 04/14/2023 ML23108A083
2022-23-02 United Controls International Interim Report Notification Pursuant To 10 CFR Part 21.21, Regarding Schneider Electric P/N ASP840-000 Modicon Primary/Secondary Power Supply Failures 03/03/2023 ML23065A193
2022-23-01 United Controls International Interim Report Notification Pursuant To 10 CFR Part 21.21, Regarding Schneider Electric P/N ASP840-000 Modicon Primary/Secondary Power Supply Failures 01/03/2023 ML23004A091
2022-23-00 United Controls International Notification under 10 CFR Part 21 for Schneider Electric P/N: ASP840-000 Modicon Primary/Secondary Power Supply 11/04/2022 ML22314A013
2022-22-00 Fairbanks Morse Basic Component Which Fails to Comply or Contains a Defect (Woodward 2301A Emergency Diesel Generator Electronic Speed Control Module) 10/31/2022 ML22307A060
2022-21-00 Nutherm International, Inc NRC 10 CFR Part 21 Notification, Nutherm, written notification of potential defect found in Nutherm/Sola Hevi-Duty Uninterruptible Power Supply (UPS), S4K2U1000-NM 191 11/01/2022 ML22307A019
2022-20-01 Grand Gulf Primary Containment Outer Airlock Door Inoperable Due to Unacceptable Leak Rate 11/30/2022 ML22334A222
2022-20-00 Grand Gulf Inadequate Lubrication of Containment Personnel Airlock Equalizing Valves 10/31/2022 ML22305A515
2022-19-00 Emerson Automation Solutions / Rosemount Nuclear Instruments, Inc Notification under 10 CFR Part 21 for Rosemount 3153N Series Pressure Transmitter with Rosemount 3159 Remote Seals with the LG1 option 11/01/2022 ML22307A020
2022-18-01 Tioga Pipe Inc. Revised Final Report Notification Pursuant To 10 CFR Part 21.21, Regarding Supply Of 6" NPS Sch. 40 Seamless Stainless-Steel Pipe 09/02/2021 ML22303A005
2022-18-00 Tioga Pipe Inc. Final Report Notification Pursuant To 10 CFR Part 21.21, Regarding Supply Of 6" NPS Sch. 40 Seamless Stainless-Steel Pipe 08/31/2021 ML22303A004
2022-17-01 Global Nuclear Fuel Final Report Notification Pursuant to 10 CFR Part 21.21, Regarding GNF3 Raised Water Rod (SC-22-04 Revision 2) 11/30/2022 ML22334A267
2022-17-00 Global Nuclear Fuel Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod 10/28/2022 ML22301A174
2022-16-01 Diversified Machine Components Part 21 Notification - Part Number 00900490-00114N Lock Nut (see pages 3 and 4) 09/07/2022 ML22286A048
2022-16-00 Diversified Machine Components Part 21 Initial Notification - Part Number 00900490-00114N Lock Nut (see pages 1 and 2) 09/02/2022 ML22286A048
2022-15-01 SNC (Southern Nuclear Operating Company) Final Report of a Deviation Associated with Framatome Supplied Siemens Medium Voltage Circuit Breakers  12/15/2023 ML23349A115
2022-15-00 Farley, Units 1 and 2 Interim 10 CFR 21.21(a)(2) Report Regarding Framatome Supplied Siemens Medium Voltage Circuit Breakers 08/17/2022 ML22229A515
2022-14-00 NTS Interim Potential Part 21 on Siemens Medium Voltage Circuit Breakers with 3AF Operators Sold to Wolf Creek Nuclear Generating Station 08/05/2022 ML22238A152
2022-13-00 Leonardo DRS Naval Power Systems 16-AAT907B Power Supply 10 CFR Part 21 Notification 08/02/2022 ML22220A236
2022-12-01 Valcor Engineering Corporation Part 21 Final Notification – Premature Failures of Valcor Coil Shell Assemblies 09/12/2022 ML22266A194
2022-12-00 Valcor Engineering Corporation Part 21 Interim Report Notification – Premature Failures of Valcor Coil Shell Assemblies 07/18/2022 ML22266A193
2022-11-00 Framatome Inc. Notification of 10 CFR Part 21 Defect and Failure to Comply: Relay - Failure to Change State 07/13/2022 ML22201A101
2022-10-00 Flowserve U S, Inc. Solenoid Coil Failure of Model 38878-8 Solenoid Valve at Catawba Nuclear Station for use on FWIV Actuator 07/01/2022 ML22222A009
2022-09-03 Curtiss-Wright Nuclear Division Updated Report Notification Pursuant To 10 CFR Part 21.21, Regarding Potential Defect in Configuration of Quick Disconnect Connector Cable Assemblies 12/16/2022 ML22356A051
2022-09-02 Curtiss-Wright Nuclear Division Closure Notification of the Potential Defect in Configuration of Quick Disconnect Connector Cable Assemblies (P/N: 913602-111) 08/26/2022 ML22259A173
2022-09-01 Curtiss-Wright Nuclear Division Follow Up to Potential Defect in Configuration of Quick Disconnect Connector Cable Assemblies (P/N: 913602-111) 07/25/2022 ML22215A250
2022-09-00 Curtiss-Wright Nuclear Division Potential Defect in Configuration of Quick Disconnect Connector Cable Assemblies (P/N: 913602-111) 06/24/2022 ML22208A168
2022-08-00 Nutherm International, Inc. 10 CFR Part 21 Notification – Arnold Magnetics Power Supply Part Number PBM-24-106 06/17/2022 ML22208A004
2022-07-00 Westinghouse Electric Company Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 04/11/2022 ML22140A208
2022-06-00 McGuire Nuclear Station Interim Report of a Deviation or Failure to Comply 04/08/2022 ML22098A016
2022-05-00 QualTech NP 10 CFR Part 21 Notification for a Curtiss-Wright Supplied RCS/Dresser Actuator, P/N SURE-24-10-4 04/06/2022 ML22153A079
2022-04-01 V.C. Summer Updated 10 CFR 21 Report – Feedwater Isolation Valve Poppet Seal Failure 05/26/2022 ML22146A396
2022-04-00 V.C. Summer 10 CFR 21 Report – Feedwater Isolation Valve Poppet Seal Failure 03/30/2022 ML22089A244
2022-03-00 Engine Systems, Inc. EMD Cylinder Head with Fireface Thickness Below Specification Cylinder Head P/N 40121485 03/29/2022 ML22098A117
2022-02-00 Ultra Energy Report Under 10 CFR 21 of Noncompliances to Specification for N7030 Temperature Transmitter  03/09/2022 ML22087A009
2022-01-00 Emerson Process Management / TopWorx Interim Report of a Deviation Related to Limit Switch Dual Continuity Indication 01/28/2022 ML22060A124

To top of page

Page Last Reviewed/Updated Friday, January 12, 2024