Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

0350 Oversight Panel for 2002

The Nuclear Regulatory Commission staff has established a special oversight panel to coordinate the agency's activities in assessing the performance problems associated with the corrosion damage to the reactor vessel head at the Davis-Besse Nuclear Power Plant, monitoring corrective actions, and evaluating the readiness of the plant to resume operations.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Description
12/23/02

Category 1 meeting: Discuss the license's expansion of their System Health Assurance Plan

12/10/02

Category 3 meeting: Present to the local public the status of the NRC's Oversight Panel activities for the Davis-Besse Nuclear Power Station

12/10/02

Category 1 meeting: Discuss License performance and progress on the Return to Service Plan as part of the IMC 0350 Process

11/20/02

Lessons Learned Task Force Public Meeting

11/13/02

Category 3 meeting: Present to the local public the status of the NRC's Oversight Panel activities for the Davis-Besse Nuclear Power Station.

11/13/02

Category 1 meeting: Discuss License performance and progress on the Return to Service Plan as part of the IMC 0350 Process

10/16/02

Category 1 meeting: Discuss preliminary findings and observations from the two NRC special inspections conducted to review radiolocial work planning, dose to workers during the outage, and offsite contamination events

10/16/02

Category 1 meeting: Discuss licensee performance and progress on the Return to Service Plan as of the IMC 0350 Process.

10/16/02

Category 3 meeting: Present to the local public the status of the NRC's Oversight Panel activities for the Davis-Besse Nuclear Power Station

09/18/02

Category 1 meeting: Discuss the licensee's planned corrective actions to address the Davis-Besse organizational and human performance problems presented to the NRC during the August 15, 2002, public meeting.

09/17/02

Category 3 meeting: Present to the local public the status of the NRC's oversight panel activities for the Davis-Besse Nuclear Power Station

09/17/02

Category 1 meeting: Discuss licensee performance and progress on the Return to Service Plan as part of the IMC 0350 Process

08/23/02

Category 2 meeting: This meeting is to discuss the NEI and PWR licensees Bulletin 2002-02, "Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles Inspections Programs."

08/20/02

Category 3 meeting: Present to the local public the status of the NRC's oversight panel activities for the Davis-Besse Nuclear Power Station.

08/20/02

Category 1 meeting: Discuss licensee performance and plans for restart as part of the IMC 0350 process.

08/16/02 Transmittal of NRC Inspection Manual Chapter 0350 Panel Restart Checklist
08/15/02

Category 1 meeting: Discuss the licensee's root cause analysis of the non-technical issues that led to the reactor pressure vessel head degradation.

07/16/02

Category 1 meeting: Discuss licensee performance and plans for restart as part of the IMC 0350 Process

07/16/02

Category 3 Meeting: Present to the local public the status of NRC's oversight panel activities for the Davis-Besse Nuclear Power Station

07/03/02 Davis Besse IMC 0350 Charter Revision 1
06/12/02

Public Meeting: To discuss plant performance and plans for restart of the Davis-Bese Nuclear Power Station, as part of the implementation of NRC's Inspection Manual Chapter (IMC) 0350.

06/12/02

Public Meeting: Status of the NRC's activities related to the plant performance and plans for restart of the Davis-Besse Nuclear Power Station.

05/09/02

Public Meeting: Implementation of NRC Oversight Panel (IMC 350)

05/03/02 NRC Press Release III-02-024: Davis-Besse Oversight Panel to Hold First Meeting May 9 in Oak Harbor, Ohio
04/30/02 NRC Press Release III-02-023: Establishes Agency Oversight Panel for Davis-Besse Reactor Head Degradation Issue
04/29/02 Letter from J.E. Dyer, Regional Administrator, Region III, to Howard Bergendahl, Vice President - Nuclear, Davis-Besse, regarding NRC Oversight Efforts regarding the Davis-Besse Nuclear Power Station
03/06/01 Inspection Manual Chapter 0350: Oversight of Operating Reactor Facilities in an Extended Shutdown as a Result of Significant Performance Problems.

For related information see Reactor Pressure Boundary Integrity Issues for Pressurized Water Reactors.