0350 Oversight Panel for 2002
The Nuclear Regulatory Commission staff has established a special oversight panel to coordinate the agency's activities in assessing the performance problems associated with the corrosion damage to the reactor vessel head at the Davis-Besse Nuclear Power Plant, monitoring corrective actions, and evaluating the readiness of the plant to resume operations.
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Date | Description |
---|---|
12/23/02 |
Category 1 meeting: Discuss the license's expansion of their System Health Assurance Plan |
12/10/02 |
Category 3 meeting: Present to the local public the status of the NRC's Oversight Panel activities for the Davis-Besse Nuclear Power Station |
12/10/02 |
Category 1 meeting: Discuss License performance and progress on the Return to Service Plan as part of the IMC 0350 Process |
11/20/02 |
Lessons Learned Task Force Public Meeting |
11/13/02 |
Category 3 meeting: Present to the local public the status of the NRC's Oversight Panel activities for the Davis-Besse Nuclear Power Station. |
11/13/02 |
Category 1 meeting: Discuss License performance and progress on the Return to Service Plan as part of the IMC 0350 Process |
10/16/02 |
Category 1 meeting: Discuss preliminary findings and observations from the two NRC special inspections conducted to review radiolocial work planning, dose to workers during the outage, and offsite contamination events |
10/16/02 |
Category 1 meeting: Discuss licensee performance and progress on the Return to Service Plan as of the IMC 0350 Process. |
10/16/02 |
Category 3 meeting: Present to the local public the status of the NRC's Oversight Panel activities for the Davis-Besse Nuclear Power Station |
09/18/02 |
Category 1 meeting: Discuss the licensee's planned corrective actions to address the Davis-Besse organizational and human performance problems presented to the NRC during the August 15, 2002, public meeting. |
09/17/02 |
Category 3 meeting: Present to the local public the status of the NRC's oversight panel activities for the Davis-Besse Nuclear Power Station |
09/17/02 |
Category 1 meeting: Discuss licensee performance and progress on the Return to Service Plan as part of the IMC 0350 Process |
08/23/02 |
Category 2 meeting: This meeting is to discuss the NEI and PWR licensees Bulletin 2002-02, "Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles Inspections Programs." |
08/20/02 |
Category 3 meeting: Present to the local public the status of the NRC's oversight panel activities for the Davis-Besse Nuclear Power Station. |
08/20/02 |
Category 1 meeting: Discuss licensee performance and plans for restart as part of the IMC 0350 process. |
08/16/02 | Transmittal of NRC Inspection Manual Chapter 0350 Panel Restart Checklist |
08/15/02 |
Category 1 meeting: Discuss the licensee's root cause analysis of the non-technical issues that led to the reactor pressure vessel head degradation. |
07/16/02 |
Category 1 meeting: Discuss licensee performance and plans for restart as part of the IMC 0350 Process |
07/16/02 |
Category 3 Meeting: Present to the local public the status of NRC's oversight panel activities for the Davis-Besse Nuclear Power Station |
07/03/02 | Davis Besse IMC 0350 Charter Revision 1 |
06/12/02 |
Public Meeting: To discuss plant performance and plans for restart of the Davis-Bese Nuclear Power Station, as part of the implementation of NRC's Inspection Manual Chapter (IMC) 0350. |
06/12/02 |
Public Meeting: Status of the NRC's activities related to the plant performance and plans for restart of the Davis-Besse Nuclear Power Station. |
05/09/02 |
Public Meeting: Implementation of NRC Oversight Panel (IMC 350) |
05/03/02 | NRC Press Release III-02-024: Davis-Besse Oversight Panel to Hold First Meeting May 9 in Oak Harbor, Ohio |
04/30/02 | NRC Press Release III-02-023: Establishes Agency Oversight Panel for Davis-Besse Reactor Head Degradation Issue |
04/29/02 | Letter from J.E. Dyer, Regional Administrator, Region III, to Howard Bergendahl, Vice President - Nuclear, Davis-Besse, regarding NRC Oversight Efforts regarding the Davis-Besse Nuclear Power Station |
03/06/01 | Inspection Manual Chapter 0350: Oversight of Operating Reactor Facilities in an Extended Shutdown as a Result of Significant Performance Problems. |
For related information see Reactor Pressure Boundary Integrity Issues for Pressurized Water Reactors.