Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

0350 Oversight Panel for 2001

The Nuclear Regulatory Commission staff has established a special oversight panel to coordinate the agency's activities in assessing the performance problems associated with the corrosion damage to the reactor vessel head at the Davis-Besse Nuclear Power Plant, monitoring corrective actions, and evaluating the readiness of the plant to resume operations.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Description
03/06/2001 Inspection Manual Chapter 0350: Oversight of Operating Reactor Facilities in an Extended Shutdown as a Result of Significant Performance Problems.

For related information see Reactor Pressure Boundary Integrity Issues for Pressurized Water Reactors.