Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

0350 Oversight Panel for 2005

The Nuclear Regulatory Commission staff has established a special oversight panel to coordinate the agency's activities in assessing the performance problems associated with the corrosion damage to the reactor vessel head at the Davis-Besse Nuclear Power Plant, monitoring corrective actions, and evaluating the readiness of the plant to resume operations.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Description
5/24/05

Category 1 Meeting: Discuss Transition of Davis-Besse Nuclear Power Station Oversight to the Reactor Oversight Process (ROP)

5/19/05 Closure of NRC Inspection Manual Chapter 0350 Oversight Panel for Davis-Besse Nuclear Power Station; Disposition of Findings Identified during the IMC 0350 Process; and Inspection Schedule Update (Inspection Report NO. 50-346/05-012)
2/22/05

Category 1 Meeting: Davis-Besse 0350 Panel Public Meeting

For related information see Reactor Pressure Boundary Integrity Issues for Pressurized Water Reactors.