Date |
Description |
12/17/2008 |
Hemyc and MT Electrical Raceway Fire Barrier System Closeout Actions |
11/05/2008 |
SECY-08-0171, Plan for Stabilizing Fire Protection Regulatory Infrastructure |
05/14/2005
|
M.T. (3-Hour) Electrical Raceway Fire Barrier System Performance Testing Final Report |
05/03/2005 |
Hemyc Test # 2 Post-Test Photographs |
05/03/2005 |
Hemyc Test # 1 Post-Test Photographs |
05/03/2005 |
Hemyc Photographs Used at Public Meeting |
05/03/2005 |
Memo - Public Availability of Post-Test Photographs MT Omega Point Laboratory (OPL) for Hemyc 1-Hour Fire Rated Electrical Raceway Fire Barrier System (ERFBS) Testing |
04/27/2005 |
Preliminary Pass/Fail Test Results for MT 3-Hour Rated Electrical Raceway Fire Barrier Systems |
04/21/2005 |
Sandia National Laboratories Hemyc (1-Hour) ERFBS Test #2 Final Report Transmittal Letter |
04/18/2005 |
Performance Testing Cable Tray Cable Air Drop and Junction Raceways Final Report |
04/15/2005 |
Sandia National Laboratories Hemyc (1-Hour) ERFBS Performance Testing Final Report Transmittal Letter - Test # 1 |
04/14/2005 |
Pre-test Photographs by OPL #1 |
04/14/2005 |
Pre-test Photographs by OPL #2 |
04/14/2005 |
Public Availability of Pre-test Photographs by OMEGA Point Lab. (OPL) for HEMY 1-Hour Fire Rated Electrical Raceway Fire Barrier System (ERFBS) Testing |
04/13/2005 |
Materials Characterization for Siltemp and Refrasil |
04/11/2005 |
Hemyc 1-Hour ERFBS Performance Testing Final Report |
04/08/2005 |
Plan for Hemyc (1-Hour) and M.T. (3-Hour) Electrical Raceway Fire Barrier System Testing Revision M |
04/06/2005 |
Notice of Public Meeting: Forthcoming Public meeting With Stakeholders Regarding Hemyc and MT Electrical Raceway Fire barrier System Performance |
04/06/2005 |
Test #1 Hemyc, Direct Attachment, Thermocouple Location Drawings and Test Data |
04/01/2005 |
Information Notice 2005-07: Results of Hemyc Electrical Raceway Fire Barrier System Full Scale Fire Testing |
03/28/2005 |
Preliminary Pass/Fail Test Results for Hemyc 1-Hour Rated Electrical Raceway Fire Barrier Systems |
03/25/2005 |
Guide to Pre-test Photographs by OPL #2 |
03/11/2005 |
Guide to Pre-test Photographs by OPL #1 |
01/25/2005 |
Letter from D. Lew to F. Emerson: NRC's response to NEI's comments on the Hemyc and M.T. test plan |
12/21/2004 |
Letter from F. Emerson of NEI to S. Weerakkody: Additional Comments on Testing the Hemyc and M.T. Fire Wrap Material |
11/18/2004 |
Letter from John Hannon to A. Marion of NEI: Hemyc (1-Hour) and MT (3-Hour) Fire Protection Wrap Performance Testing Fire Test Plan |
01/16/2003 |
Program Plan For Hemyc (1-Hour) and M.T. (3-Hour) Fire Protective Wrap Performance Testing, Final, dated January 16, 2003 |
12/06/2002 |
Letter from A. Marion of NEI to John Hannon: NEI Comments on NRC Hemyc Test Plan |
11/22/2002 |
Summary of the October 31, 2002 Public Meeting on the Proposed Plan to Perform Fire Testing of Hemyc (1-Hour) and MT (3-Hour) Fire Protection Wrap |
10/09/2002 |
Notice of the Public Meeting on the Proposed Plan to Perform Fire Testing of Hemyc (1-Hour) and MT (3-Hour) Fire Protection Wrap |
12/28/2001 |
Letter from F. Emerson to D. Frumkin: NEI Provides Description of Installed Hemyc and MT Configurations |
06/20/2001 |
Promatec Hemyc and MT Electrical Raceway Fire Barrier Systems |
04/25/2001 |
NEI Document: Promatec 1-Hour and MT 3-Hour Fire Barrier Systems |
04/17/2001 |
Shearon Harris Nuclear Power Plant Unit No.1 - Docket No.50-4000: Licensing Basis of Promatec Hemyc Fire Barrier Systems |
12/15/2000 |
McGuire Fire Protection Inspection Report |
11/29/2000 |
Waterford Steam Electric Station, Unit 3; Fire Protection Report; Fire Protection |
08/01/2000 |
Harris Hemyc TIA - Letter from S. Black to L. Plisco |
02/02/2000 |
Shearon Harris Fire Protection Inspection Report |